Rechercher des projets européens

32 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The overall aim of N2B-patch is the development of a new innovative N2B drug delivery technology based on the synthesis of a biomaterial-based innovative galenic formulation that will be applied with the aid of a novel medical device equipped with a container closure system (CCS) as a hydrogel patch to the nasal olfactory region for the chronic treatment of MS. The galenic formulation will consist ...
Voir le projet

 11

 TERMINÉ 

LOW valued energy sources UPgrading for buildings and industry uses (LOWUP)

Date du début: 1 nov. 2016, Date de fin: 30 avr. 2020,

In the “secure, clean and efficient energy” initiative, it is stated that the most important milestones for such a transformation are the EU's energy and climate targets for 2030, which are: (i) at least 40% reduction in greenhouse gas emissions compared to 1990, (ii) at least 27% for the share of renewable energy consumed in the EU, and (iii) at least 27% improvement of energy efficiency and an e ...
Voir le projet

 13

 TERMINÉ 

READY

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2019,

"Based on thorough integrated climate planning the READY project will demonstrate a Whole City Approach including: 1) Demo of a balanced and holistic approach towards affordable retrofitting of residential buildings and offices 2) Development and demo of new solutions for low-temp. district heating, components and management ICT systems 3) Development and demo of flexible combined grid balancing/e ...
Voir le projet

 23

 TERMINÉ 
An efficient asset management process is needed to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses on the later stages of a facility’s life cycle, specifically maintenance, rehabilitation, and replacement. However, a process of efficient asset management must define me ...
Voir le projet

 14

 TERMINÉ 

Solutions for CRitical Raw materials - a European Expert Network (SCRREEN)

Date du début: 1 nov. 2016, Date de fin: 30 avr. 2019,

Since the publication of the first list of Critical Raw Materials (CRM) in 2010 by the Ad-hoc Working Group on CRM, numerous European projects have addressed (part of) the CRMs value and several initiatives have contributed to gather (part of) the related community into clusters and associations. This led to the production of important knowledge, unfortunately disseminated. Numerous databases have ...
Voir le projet

 30

 TERMINÉ 
The thermal-hydraulics Simulations and Experiments for the Safety Assessment of Metal cooled reactor (SESAME) project supports the development of European liquid metal cooled reactors (ASTRID, ALFRED, MYRRHA, SEALER). The project focusses on pre-normative, fundamental, safety-related, challenges for these reactors with the following objectives:• Development and validation of advanced numerical app ...
Voir le projet

 24

 TERMINÉ 

MArket Research for a Climate Services Observatory (MARCO)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

Climate‐related tools, products, data and services may greatly contribute to climate change mitigation and adaptation. However, current strategies face knowledge gaps, lack of visibility of climate services, and low awareness of key potential customers for using key information and the associated economic benefits. This reality triggers the need and potential for developing a global market for cli ...
Voir le projet

 11

 TERMINÉ 
ENTRUST provides mapping of Europe’s energy system (key actors & their intersections, technologies, markets, policies, innovations) and an in-depth understanding of how human behaviour around energy is shaped by both technological systems and socio-demographic factors (esp. gender, age and socio-economic status). New understandings of energy-related practices and an intersectional approach to the ...
Voir le projet

 7

 TERMINÉ 
Fostering a Transition towards Responsible Research and Innovation SystemsThe main objective of FoTRRIS is to develop and introduce new governance practices to foster Responsible Research and Innovation (RRI) policies and methods in research and innovation systems. Since research and innovation systems and practices in different European MS and within different research performing organisations va ...
Voir le projet

 7

 TERMINÉ 

Materials’ Innovations for a Safe and Sustainable nuclear in Europe (MATISSE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Voir le projet

 32

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 
The aim of demEAUmed project is the involvement of industry representatives, stakeholders, policy-makers and diverse technical and scientific experts in demonstrating and promoting innovative technologies, for an optimal and safe closed water cycle in Euro-Mediterranean tourist facilities, leading to their eventual market uptake. A representative resort placed in Catalonia, Spain, is considered as ...
Voir le projet

 16

 TERMINÉ 

PELlets versus GRanulates: Irradiation, Manufacturing & Modelling (PELGRIMM)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2017,

PELGRIMM is a 4 year project, addressing Minor-Actinide (MA) bearing fuel developments for Generation IV Fast Reactor Systems to support the Strategic Research Agenda (SRA) of the European Sustainable Nuclear Energy –Technology Platform (SNE-TP). Both options, MA homogeneous recycle in driver fuels with MA content at a few percent, and heterogeneous recycle on UO2 fuels bearing high MA contents, l ...
Voir le projet

 12

 TERMINÉ 
Refractory metals (tungsten, tantalum, rhenium, molybdenum and niobium) are highly strategic metals today mainly imported from a few countries. The European primary production remains below a few percentage. However, resources exist in Europe, as primary resources but mainly as secondary resources (industrial waste, urban mines). Valorizing these resources requires coordination and networking betw ...
Voir le projet

 21

 TERMINÉ 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Voir le projet

 52

 TERMINÉ 

Safety of ACtinide Separation proceSSes (SACSESS)

Date du début: 1 mars 2013, Date de fin: 30 juin 2016,

"Nuclear power plays a key role in limiting EU’s greenhouse gases emissions, and makes an important contribution to improve European Union’s independence, security and diversity of energy supply. However, its social acceptance is closely linked to an enhanced safety in the management of long-lived radioactive waste contributing to resource efficiency and cost-effectiveness of this energy and ensur ...
Voir le projet

 26

 TERMINÉ 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Voir le projet

 25

 TERMINÉ 
Safety issues are of fundamental importance for the acceptance and sustainable application of nuclear energy. Actinides play a central role in the nuclear fuel cycle from mining, fuel fabrication, energy production, up to treatment of used fuel by reprocessing, partitioning and transmutation and/or finally management and disposal of radioactive waste. A fundamental understanding of actinide proper ...
Voir le projet

 12

 TERMINÉ 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Voir le projet

 22

 TERMINÉ 
"Due to barriers that exist in when considering the sustainability of the built environment, optimising energy efficiency in buildings is often a management issue and not one of design. In many cases, it is the organisation responsible for the building that makes the decision with respect to where best to invest their limited resources. For this reason, decision support tools, providing informat ...
Voir le projet

 12

 TERMINÉ 
"FAbrication, Irradiation and Reprocessing of FUELS and targets for transmutation (FAIRFUELS) provides a way towards a more efficient use of fissile material in nuclear reactors with a view to reducing the volume and hazard of high level long-lived radioactive waste, closing the nuclear fuel cycle. In order to contribute to the competitiveness of Europe, the Collaborative Project FAIRFUELS will c ...
Voir le projet

 12

 TERMINÉ 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Voir le projet

 34

 TERMINÉ 
This project addresses the issue of safe indoor use of hydrogen and fuel cells systems (priority 4.6 of the call FCH-JU-2010-1) for early markets (forklift refuelling and operation, back-up power supply, portable power generation, etc.): It aims to provide scientific and engineering knowledge for the specification of cost-effective means to control hazards specific to the use of hydrogen indoors o ...
Voir le projet

 10

 TERMINÉ 
T-TRANS project aims at providing information on innovation mechanisms for the Intelligent Transportation Systems domain, encouraging and facilitating an accelerated market deployment of related innovative products and services. A deep analysis of the current activity in Intelligent Transportation Systems shows an increasing importance of this transport research and application domain to support m ...
Voir le projet

 9

 TERMINÉ 

"SNETP Management, Implementation, Liaison and Evolution" (SMILE)

Date du début: 1 juin 2011, Date de fin: 31 mai 2014,

"The European Sustainable Nuclear Energy Technology Platform (SNETP) was launched in 2007, and has since then issued its strategic documents. Several Working Groups have been constituted in 2010 to coordinate the implementation of the three “pillars” of the SNETP vision:- The ESNII Task Force has started preparing a “European Industrial Initiative” on Fast Neutron Reactors and closed fuel cycle- A ...
Voir le projet

 6

 TERMINÉ 
The malevolent use of Anthrax spores on civilians in late 2001 has shown the necessity to protect European citizens from criminal use of biological agents and viruses. Although these attacks had been punctual and crude, more sophisticated attacks on dozens or hundreds of injured or killed people are conceivable. When launching such an attack its success depends on concentrating a sufficient amount ...
Voir le projet

 9

 TERMINÉ 

ACTINET Integrated Infrastructure Initiative (ACTINET-I3)

Date du début: 1 oct. 2009, Date de fin: 31 janv. 2013,

"Actinides play a central role in the nuclear energy generation systems. In order to keep a leading position in the field of nuclear energy – both in terms of safety and efficient use of natural resources – Europe needs to reinforce its expertise and to prepare the next generation of scientists and engineers who will be able to contribute to develop actinide management strategies based on sound sc ...
Voir le projet

 10

 TERMINÉ 

NUclear Reactor Integrated Simulation Project (NURISP)

Date du début: 1 janv. 2009, Date de fin: 30 juin 2012,

The target of the proposed NURISP Collaborative Project is to make new and significant steps towards a European Reference Simulation Platform for applications relevant to present PWR and BWR and to future reactors. The roadmap of this Simulation Platform will be proposed to be part of the future Strategic Research Agenda of the Sustainable Nuclear Energy Technology Platform (SNE-TP). The first st ...
Voir le projet

 23

 TERMINÉ 

Basic Research for Innovative Fuels Design for GEN IV systems (F-BRIDGE)

Date du début: 1 mars 2008, Date de fin: 29 févr. 2012,

Up to now fuel development and qualification has been a long and expensive process essentially based on an empirical approach. European experts currently have an adequate knowledge of conventional fuel manufacturing and its behaviour under operating conditions encountered during 50 years of industrial application and R&D activities. For innovative fuel systems, however, the empirical approach has ...
Voir le projet

 19

 TERMINÉ 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Voir le projet

 15

 TERMINÉ 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Voir le projet

 27

 TERMINÉ 
...in project secretariat, web content management, and public communication. Therefore, the initial SNE-TP Secretariat decided to call on a specialised company to act as the main support organisation. LGI has experience in management of European projects in the nuclear field. The present proposal for a Support Action 'SNE-TP Office' describes how the necessary support for the operations of the Platf ...
Voir le projet

 5