Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Voir le projet

 14

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Large-scale RINA benchmark on FIRE (ARCFIRE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

ARCFIRE will bring RINA from labs into the real-world. RINA, the Recursive InterNetwork Architecture, is an innovative “back-to-basics” network architecture that solves current limitations and facilitates full integration between distributed computing and networking. RINA addresses the challenges that drive the communications industry in moving from dedicated hardware to almost completely virtuali ...
Voir le projet

 8

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 
The mmMAGIC (Millimetre-Wave Based Mobile Radio Access Network for Fifth Generation Integrated Communications) project will develop and design new concepts for mobile radio access technology (RAT) for mm-wave band deployment. This is envisaged as a key component in the 5G multi-RAT ecosystem and will be used as a foundation for global standardization. The project will thus enable ultrafast mobile ...
Voir le projet

 19

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Voir le projet

 45

 TERMINÉ 

Programmability In RINA for European supremacy of virTualised NEtworks (PRISTINE)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2016,

The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Voir le projet

 16

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 janv. 2012, Date de fin: 29 févr. 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Voir le projet

 14

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 
The INFINITY Support Action will have a positive impact on the success of the FI-PPP programme. Through collaboration with organisations across Europe, INFINITY will capture and communicate information about available infrastructures and any interoperability requirements and issues. INFINITY will document any usage-related operational constraints and seek to identify and foster federation opportun ...
Voir le projet

 14

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Voir le projet

 30

 TERMINÉ 

EXpAnding LTE for Devices (EXALTED)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

The number of networked humans will reach saturation by the middle of the next decade, while the number of networked devices will continue to increase dramatically for some time to come. The Wireless World Research Forum (WWRF) has set out a vision of the future where 7 trillion wireless devices will be serving 7 billion people by 2017. The vast majority of wireless traffic will be between machine ...
Voir le projet

 16

 TERMINÉ 

Internet of Things Initiative (IoT-i)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2012,

Internet of Things (IoT) is one of the most important areas of a Future Internet with significant potential to positively impact European economy and society. The current IoT research community is however highly fragmented, featuring diverging approaches and technologies. This inevitably leads to a lack of coherency that hinders the realisation of an interoperable IoT, preventing the IoT to achiev ...
Voir le projet

 17

 TERMINÉ 
The general objective of this Thematic Network (TN) is to foster and promote large-scale integration of domestic and distributed micro generation and improve energy efficiency through the implementation of innovative ICT solutions into local smart power grids.The TN will bring together key relevant players in the telecommunications and energy sector. They will overview and provide insight of exist ...
Voir le projet

 15

 TERMINÉ 
The EFIPSANS project aims at exposing the features in IP version six protocols that can be exploited or extended for the purposes of designing or building autonomic networks and services. What this means is, a study of the emerging research areas that target desirable user behaviours, terminal behaviours, service mobility, e-mobility, context-aware communications, self-ware, autonomic communicatio ...
Voir le projet

 19

 TERMINÉ 
Experimentally driven research is key to success in today's Internet. Many test beds support research and development, and product prototyping in communication networks. However, they tend to specialise in particular access technologies or services, or explore near term product offerings, often with limited availability and openness. An open and sustainable large-scale shared experimental facility ...
Voir le projet

 30

 TERMINÉ 

Integrating the Physical with the Digital World of the Network of the Future (SENSEI)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

In order to realise the vision of Ambient Intelligence in a future network and service environment, heterogeneous wireless sensor and actuator networks (WS&AN) have to be integrated into a common framework of global scale and made available to services and applications via universal service interfaces. SENSEI creates an open, business driven architecture that fundamentally addresses the scalabilit ...
Voir le projet

 20

 TERMINÉ 

Publish-subscribe Internet Routing Paradigm (PSIRP)

Date du début: 1 janv. 2008, Date de fin: 30 sept. 2010,

Despite its success, the Internet suffers from several shortcomings, forcing a fundamental reform of its paradigms and core technologies. A major flaw in the design of the Internet is its imbalance of powers in the favour of the sender of information. The network accepts anything that the sender wants to send and will make a best effort to deliver it to the receiver. This has led into increasing p ...
Voir le projet

 8

 TERMINÉ 
The main objectives of the project are improving, building, fostering and disseminating the wireless sensor networking (WSN) expertise in the WBC region. The human and infrastructure research capabilities of two WBC research centres (Skopje and Belgrade) will be improved to enable them to drive WSN research in the region and actively collaborate with research institutions from the EU. A sustainabl ...
Voir le projet

 8

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39

 TERMINÉ 

End-to-End Efficiency (E3) (E3)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2009,

The End-to-End Efficiency (E3) project is an ambitious FP7 EC Integrated Project (IP) aiming at integrating cognitive wireless systems in the Beyond 3G (B3G) world, evolving current heterogeneous wireless system infrastructures into an integrated, scalable and efficiently managed B3G cognitive system framework. The key objective of the E3 project is to design, develop, prototype and showcase solut ...
Voir le projet

 23