Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Within the project a new highly efficient biomass CHP technology consisting of a fuel-flexible fixed-bed updraft gasifier, a novel compact gas cleaning system and a solid oxide fuel cell (SOFC) shall be developed for a capacity range of 1to 10 MW (total energy output). The technology shall distinguish itself by a wide fuel spectrum applicable (wood pellets, wood chips, SRC, selected agricultural f ...
Voir le projet

 9

 TERMINÉ 
HORSE aims to bring a leap forward in the manufacturing industry proposing a new flexible model of smart factory involving collaboration of humans, robots, AGV’s (Autonomous Guided Vehicles) and machinery to realize industrial tasks in an efficient manner. HORSE proposes to foster technology deployment towards SMEs by developing a methodological and technical framework for easy adaptation of robot ...
Voir le projet

 15

 TERMINÉ 
STREAM is a 4-year multi-site training network that aims at career development of Early Stage Researchers (ESRs) on scientific design, construction manufacturing and of advanced radiation instrumentation. STREAM targets the development of innovative radiation-hard, smart CMOS sensor technologies for scientific and industrial applications. The platform technology developed within the project will b ...
Voir le projet

 11

 TERMINÉ 

Industry 4.0 for wood and furniture manufacturers

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The EU supports the 4th industrial revolution through its industrial policy and through research and infrastructure funding. However, challenges like training workers and future professionals remain. Furthermore the furniture and wood sector has identified that it has a shortage of professionals with high qualification in ICTs and other emerging technologies. Some of the specific skills and compe ...
Voir le projet

 13

 TERMINÉ 

AffordabLe LIghtweight Automobiles AlliaNCE (ALLIANCE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

6 of the European carmakers (DAIMLER, VW, TME, CRF, VOLVO, Opel), under the coordination of EUCAR, have joined forces to commonly address the high cost issue of innovations in vehicle lightweighting, having identified it as the major bottleneck towards their implementation in vehicle series and mass production. The AffordabLe LIghtweight Automobiles AlliaNCE (ALLIANCE) has the ambition to develop ...
Voir le projet

 17

 TERMINÉ 
CELBICON aims at the development, from TRL3 to TRL5, of new CO2-to-chemicals technologies, conjugating at once small-scale for an effective decentralized market penetration, high efficiency/yield, low cost, robustness, moderate operating temperatures and low maintenance costs.In line with the reference Topic text, these technologies will bridge cost-effective CO2 capture and purification from the ...
Voir le projet

 13

 TERMINÉ 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Voir le projet

 25

 TERMINÉ 
Terrestrial and marine ecosystems provide essential services to human societies. Anthropogenic pressures, however, cause serious threat to ecosystems, leading to habitat degradation, increased risk of collapse and loss of ecosystem services. Knowledge-based conservation, management and restoration policies are needed to improve ecosystem benefits in face of increasing pressures. ECOPOTENTIAL makes ...
Voir le projet

 47

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 
The thermal-hydraulics Simulations and Experiments for the Safety Assessment of Metal cooled reactor (SESAME) project supports the development of European liquid metal cooled reactors (ASTRID, ALFRED, MYRRHA, SEALER). The project focusses on pre-normative, fundamental, safety-related, challenges for these reactors with the following objectives:• Development and validation of advanced numerical app ...
Voir le projet

 24

 TERMINÉ 
StratoClim will produce more reliable projections of climate change and stratospheric ozone by a better understanding and improved representation of key processes in the Upper Troposphere and Stratosphere (UTS). This will be achieved by an integrated approach bridging observations from dedicated field activities, process modelling on all scales, and global modelling with a suite of chemistry clima ...
Voir le projet

 30

 TERMINÉ 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Voir le projet

 14

 TERMINÉ 
Today’s driver assistance systems offer comfort and safety in sound environmental conditions. However, in harsh environment conditions – when needed most – systems stop working due to reduced sensor information quality. Targeting to the area of highly automated driving the improvement of perception, decision and planning under adverse conditions is one of the main challenges to be addressed. Robus ...
Voir le projet

 15

 TERMINÉ 
The project NANO-CATHEDRAL aims at developing, with a nano-metric scale approach, new materials, technologies and procedures for the conservation of deteriorated stones in monumental buildings and cathedrals and high value contemporary architecture, with a particular emphasis on the preservation of the originality and specificity of materials. The objective is providing “key tools” for restoration ...
Voir le projet

 19

 TERMINÉ 
The project HERCULES-2 is targeting at a fuel-flexible large marine engine, optimally adaptive to its operating environment. The objectives of the HERCULES-2 project are associated to 4 areas of engine integrated R&D:• Improving fuel flexibility for seamless switching between different fuel types, including non-conventional fuels.• Formulating new materials to support high temperature component ap ...
Voir le projet

 33

 TERMINÉ 

CAST (CArbon-14 Source Term) (CAST)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Voir le projet

 37

 TERMINÉ 

Human Brain Project Specific Grant Agreement 1 (HBP SGA1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

Understanding the human brain is one of the greatest scientific challenges of our time. Such an understanding can provide profound insights into our humanity, leading to fundamentally new computing technologies, and transforming the diagnosis and treatment of brain disorders. Modern ICT brings this prospect within reach. The HBP Flagship Initiative (HBP) thus proposes a unique strategy that uses I ...
Voir le projet

 126

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
EmployID aims to support and facilitate the learning process of Public Employment Services (PES) practitioners in their professional identity transformation process. To perform successfully in their job they need to acquire a set of new and transversal skills, develop additional competencies, as well as embed a professional culture of continuous improvement. EmployID will offer efficient use of te ...
Voir le projet

 12

 TERMINÉ 

QT21: Quality Translation 21 (QT21)

Date du début: 1 févr. 2015, Date de fin: 31 janv. 2018,

A European Digital Single Market free of barriers, including language barriers, is a stated EU objective to be achieved by 2020. The findings of the META-NET Language White Papers show that currently only 3 of the EU-27 languages enjoy moderate to good support by our machine translation technologies, with either weak (at best fragmentary) or no support for the vast majority of the EU-27 languages. ...
Voir le projet

 14

 TERMINÉ 
EURenOmics will integrate several established consortia devoted to rare kidney diseases with eminent need and potential for diagnostic and therapeutic progress (i.e. steroid resistant nephrotic syndrome, membranous nephropathy, tubulopathies, complement disorders such a haemolytic uraemic syndrome, and congenital kidney malformations). The Consortium has access to the largest clinical cohorts asse ...
Voir le projet

 29

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 

Enhanced European Coordination for Accelerator Research & Development (EUCARD-2)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

Research accelerators are facing important challenges that must be addressed in the years to come: existing infrastructures are stretched to all performance frontiers, new world-class facilities on the ESFRI roadmap are starting or nearing completion, and strategic decisions are needed for future accelerators and major upgrades in Europe.While current projects concentrate on their specific objecti ...
Voir le projet

 40

 TERMINÉ 

Engine Breakthrough Components and Subsystems (E-BREAK)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2017,

Future aero engines will need to be more efficient and contribute to the reduction on environmental impact of air transportation. They must reach some standards of performance by reducing emissions and creating some savings on operation costs.EIMG consortium has launched since several years some initiatives to develop future engines in the frame of the European Committee research programmes.Within ...
Voir le projet

 48

 TERMINÉ 

Code for European Severe Accident Management (CESAM)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2017,

The Fukushima accidents highlighted that both the in-depth understanding of such sequences and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the Europ ...
Voir le projet

 21

 TERMINÉ 
CloudTeams will be a cloud-based platform transforming software development for cloud services into a much easier, faster and targeted process, by engaging communities of users who will participate in the product life cycle to help software teams develop better solutions for customers’ problems.Main challenges addressed by CloudTeams are first, the fragmented European market that makes adaptation ...
Voir le projet

 6

 TERMINÉ 

Advanced materials for batteries (MAT4BAT)

Date du début: 1 sept. 2013, Date de fin: 28 févr. 2017,

"Li-ion technologies initiated in the 90’ at a fast development pace thanks mainly to emerging ICTs with more than 20 GWh sold in 2010. Soon, it appeared as a credible technology for electrical vehicles as it could provide average energy densities of about 140 Wh/kg. However and since then,major breakthroughs have been expected to reach higher storage levels of 250 Wh/kg on battery system level wi ...
Voir le projet

 18

 TERMINÉ 
The NanoMILE project is conceived and led by an international elite of scientists from the EU and US with the aim to establish a fundamental understanding of the mechanisms of nanomaterial interactions with living systems and the environment, and uniquely to do so across the entire life cycle of nanomaterials and in a wide range of target species. Identification of critical properties (physico-che ...
Voir le projet

 30

 TERMINÉ 

The Proactive Sensing Enterprise (ProaSense)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

A new class of enterprise systems, proactive enterprises, that will be continuously aware of that what "might happen" in the relevant business context and optimize their behavior to achieve that what "should be the best action", are emerging nowadays. ProaSense's core goal in this context is to pave the way for an efficient transmission from Sensing into Proactive enterprises. By being one of earl ...
Voir le projet

 8

 TERMINÉ 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Date du début: 1 sept. 2013, Date de fin: 30 sept. 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Voir le projet

 52

 TERMINÉ 

Context-Aware Cloud Topology Optimisation and Simulation (CACTOS)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

User demand and new technologies are driving a drastic increase in cloud infrastructure scale, heterogeneity and complexity. The demand for better energy efficiency has led to a variety of technological options to build servers from different CPU architectures as well as specialised options for highly parallel tasks such as manycore systems or General Purposed GPUs. At the same time, service provi ...
Voir le projet

 8

 TERMINÉ 

The Human Brain Project (HBP)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Understanding the human brain is one of the greatest challenges facing 21st century science. If we can rise to the challenge, we can gain profound insights into what makes us human, develop new treatments for brain diseases and build revolutionary new computing technologies. Today, for the first time, modern ICT has brought these goals within sight. The goal of the Human Brain Project, part of the ...
Voir le projet

 116

 TERMINÉ 
PhoxTrot is a large-scale research effort focusing on high-performance, low-energy and cost and small-size optical interconnects across the different hierarchy levels in Data Center and High-Performance Computing Systems: on-board, board-to-board and rack-to-rack. PhoxTrot will tackle optical interconnects in a holistic way, synergizing the different fabrication platforms (CMOS electronics, Si-pho ...
Voir le projet

 22

 TERMINÉ 

MyrrhA Research Infrastructure Support Action (MARISA)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

"The MYRRHA project aims to develop and to construct a world-class and first-of-a-kind nuclear research infrastructure. The design and the construction of the MYRRHA facility is particularly challenging since it requires the management of a large number of activities in view of achieving technical excellence in compliance with the project budget and schedule. Accordingly, state-of-the-art project ...
Voir le projet

 17

 TERMINÉ 

Shared Standards for Open Data and Public Sector Information (Share-PSI 2.0)

Date du début: 1 févr. 2014, Date de fin: 31 juil. 2016,

Share-PSI 2.0 brings together a critical mass of government agencies and organisations responsible for implementing the new PSI Directive. Lead by the W3C, the consortium includes the Open Group and Open Geospatial Consortium as fellow standards bodies plus the PSI Alliance, Open Knowledge Foundation, Open Data Institute and PwC as the primary contractor in the ISA Programme's work on interoperabi ...
Voir le projet

 42

 TERMINÉ 
"This project will support the ESNII (European Sustainable Nuclear Industrial Initiative) roadmap and the Strategic Research Agenda and the Deployment Strategy of SNETP (Sustainable Nuclear Energy Technology Platform) on the enhancement of Sodium-cooled Fast neutron Reactors (SFR) safety, especially towards a higher resistance to severe accidents.In the initiation phase of SFR core disruptive acci ...
Voir le projet

 9

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Strategic high-level transport model (HIGH-TOOL)

Date du début: 15 avr. 2013, Date de fin: 14 févr. 2016,

The HIGH-TOOL project aims at developing a free and open high-level strategic transport model to assess economic, social and environmental impacts of transport policy. The HIGH-TOOL model will allow quick scanning of transport policy options by the European Commission (EC). Input and output indicators of the model will be based on policy targets of the White Paper 2011 and the Roadmap for moving t ...
Voir le projet

 8

 TERMINÉ 
The BUONAPART-E project aims to demonstrate that a physical nanoparticle synthesis process can be economically scaled-up to yield 100 kg/day production rate, which is the target rate mentioned in the Call Topic. The process is simple, versatile, and reliable. It avoids chemical precursors and solvents, while fully recycling the necessary inert carrier gas, resulting in a minimal impact on the envi ...
Voir le projet

 21

 TERMINÉ 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Voir le projet

 25