Rechercher des projets européens

10 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

PASS2WORK – Erfolgreich mit Sozialkompetenz

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

The requirements on the adolescents become increasingly complex in our society.In the course of the expansion of professional, social and spacial mobility traditional influencing factors (e.g. family, church, clubs) increasingly lose meaning. The changing requirements within the working world require new skills like flexibility, mobility, permanent readiness to learn new skills and adaptability.Du ...
Voir le projet

 11

 TERMINÉ 

Kommunikation - Kooperation - Koordination in Guidance

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

Communication - Cooperation - Coordination in Guidance"Co-Co-Co in Guidance"Three organizations at local and regional levels start to walk on common European path.An authority on municipality level with services for education and counseling in Graz, an cross-institutional network of adult education - the Styrian Adult Educational Network, as well as an NGO with the main theme of "Education and Bus ...
Voir le projet

 4

 TERMINÉ 

Go Abroad and Complete Your Skills III

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

The Europe-Agency of the District Government of Soest is offering 50 vocational students of the districts vocational schools a four week internship in Plymouth, UK within the project "Go Abroad and Complete Your Skills iII". Main focuses of the project are competences in foreign languages (Englisch) and the internship in a foreign company. Partner of the District Government of Soest is the Tellu ...
Voir le projet

 2

 TERMINÉ 
Background Hydraulic engineering actions in the Möhne valley over previous centuries have had a negative impact on both the river and its floodplain, leading to a reduction of river length by up to 30%. This reduction subsequently led to erosion and eventually to fewer of the floods that enaturally occur in a floodplain. Much of the land within the flood ...
Voir le projet

 5

 TERMINÉ 
Background The river Lippe is the northernmost tributary of the river Rhine from the East. It runs along the southern edge of the Westphalian river basin. Between the mostly agricultural area of the Münsterland in the north and the industrial centres in the southwest, the river Lippe acts as a connection axis between the biotopes of the Niederrhein in th ...
Voir le projet

 4

 TERMINÉ 

Go Abroad and Complete Your Skills II

Date du début: 1 juil. 2014, Date de fin: 30 juin 2015,

The Agency "School in Europe" of the District Government of Soest is offering 20 vocational students of the districts vocational schools a four week internship in Plymouth, UK within the project "Go Abroad and Complete Your Skills II". Main focuses of the project are competences in foreign languages (Englisch) and the internship in a foreign company. Partner of the District Government of Soest i ...
Voir le projet

 2

 TERMINÉ 

Rehabilitation of streams in the " Arnsberger Wald" (Bachtäler Arnsberger Wald)

Date du début: 2 janv. 2009, Date de fin: 31 juil. 2014,

... The LIFE project cooperated as well with social institutions, such as international youth camps and agencies for the long-term unemployed. The project participants BS Hochsauerlandkreis and ABU Soest engaged a high number of volunteers that supported the project. Further information on the project can be found in the project's layman report and After-LIFE Conservation Plan (see "Read more" se ...
Voir le projet

 3

 TERMINÉ 

Haptic, Audio and Visual Interfaces for Maps and Location-Based Services (HaptiMap)

Date du début: 1 sept. 2008, Date de fin: 31 août 2012,

The HAPTIMAP project will deeply embed accessibility into digital mainstream maps and mobile location-based services. Our strategy is twofold: firstly to develop tools that make it easier for developers to add adaptable multimodal components (designed to improve accessibility) to their applications; and secondly, to raise the awareness of these issues via new guidelines and to suggest extensions t ...
Voir le projet

 16

 TERMINÉ 

Optimisation of the pSCI "Lippe flood plain between Hamm and Hangfort" (Lippe-Aue)

Date du début: 8 janv. 2005, Date de fin: 31 juil. 2010,

Background The River Lippe is a tributary of the Rhine. It runs westwards along the southern edge of the Westphalia lowlands. The river floodplain has been heavily modified by water engineering works and agricultural use, but it still hosts some areas with high potential conservation value. One of these areas is the Natura 2000 network Site of Community I ...
Voir le projet

 4

 TERMINÉ 
El principal objetivo de las dos regiones candidatas a cooperar en el marco de este proyecto es el establecimiento de un esquema sostenible de calidad en la preparación, realización y evaluación de las prácticas en empresa de nuestro alumnado de Formación Profesional en el extranjero. Este objetivo, que se plantea como medida para fomentar la movilidad transnacional, responde asimismo a las línea ...
Voir le projet

 2