Rechercher des projets européens

19 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Engine Module Validators (ENOVAL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Voir le projet

 37

 TERMINÉ 
CLOSEYE comes to life with the aim of providing the EU with an operational and technical framework that would increase situational awareness and improve the reaction capability of authorities surveying the external borders of the EU. This initiative also comes in response to an urgent sudden major challenge for the control of the migratory pressure from the North African coast and to a limited mar ...
Voir le projet

 6

 TERMINÉ 

FRAY LUIS DE LEÓN

Date du début: 1 oct. 2014, Date de fin: 30 sept. 2016,

The Consortium promoter of this proposal, coordinated by the Provincial Development Board of the Council of Cuenca, and shaped by 18 VET organisations, both public and private bodies, presents the project “FRAY LUIS DE LEÓN” thanks to the extensive experience in mobility projects. “FRAY LUIS DE LEÓN” intends to continue with the training and work activities that have brought many benefits to the y ...
Voir le projet

 48

 TERMINÉ 

Integrated Components for Assisted Rescue and Unmanned Search operations (ICARUS)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Voir le projet

 29

 TERMINÉ 
The overall scope of the DAPhNE project is to develop and demonstrate a package of integrated solutions for energy intensive processes (ceramics, cement and glass), based on tuning micro-wave technologies to the material characteristics and on intelligent control systems, to provide real time information about the energy consumption as well as the product quality.Microwave heating is now a well e ...
Voir le projet

 18

 TERMINÉ 

Smart Connected Electro Mobility (smartCEM)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

Four European cities/regions (Barcelona, Gipuzkoa-San Sebastian, Newcastle and Reggio Emilia) have come together to demonstrate the role of ICT solutions for cities and citizens in addressing shortcomings of electro mobility. Electric power solutions have proven to offer a potentially ground-breaking solution for more energy-efficient and less petrol-dependent vehicles and transport systems. The ...
Voir le projet

 31

 TERMINÉ 
Listeria mococytogenes is one of the most important food-borne pathogenic bacteria, having “zero tolerance” in ready-to-eat and dairy foods. Currently, a novel system for monitoring the contamination levels in industrial food producing plants in a more fast, safe and efficient manner than current tools is being developed in the framework of the BioliSME project (Project No: 232037). Although the p ...
Voir le projet

 7

 TERMINÉ 

SOLUTIONS for ENVIRONMENTAL CONTRASTS in COASTAL AREAS (SECOA)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2013,

"Urban settlements, following the economic crisis of the 70s, entered in a process of regional and urban restructuring to gain a new image at the international level. As a result of the renewed economic success new flows of permanent, semi-permanent, temporary and daily “human mobility” followed: (i) for consumption (leisure and tourism), (ii) for production (economic migration). The world competi ...
Voir le projet

 11

 TERMINÉ 

manaGEmEnt and leisure middleWare for tHemE parks and Zoo (GEEWHEZ)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2013,

"The goal of GEEWHEZ proposal is to develop a customised Resource Planning solution for Animal and Theme Parks (ATPs). Currently, off the shelf solutions, such as Enterprise Resource Planning (ERP) or Customised Platforms (CP), are being employed to meet this end, but such solutions do not meet ATPs' needs due to lack of flexibility or, on the other hand, extensive programming and DB design skills ...
Voir le projet

 11

 TERMINÉ 
Large European communities generate significant amounts of valuable environmental observations at local and regional scales using mobile communication devices, computers and sensors which are mostly connected to the internet. These communities' environmental observations represent a wealth of information which is currently unused and therefore in need for integration with other fragmented data and ...
Voir le projet

 15

 TERMINÉ 
In December 2007, the European Commission imposed a total of € 247 635 000 fines on the five largest manufacturers of chloroprene rubber for participating in a cartel. As a result of this price fixing and market abuse by large enterprises, the SME involvement in this sector has diminished and requires research investment to re-build its presence. Additionally there is increasing pressure to replac ...
Voir le projet

 13

 TERMINÉ 
Polymer based manufactured components for construction applications have been designed, developed and demonstrated in European projects such as HP FUTURE-Bridge, SAFEFLOOR and MEGAWIND. The results are very promising regarding customer requirements, quality, technical and economical feasibility and the favourable impact of using this kind of composite-based components in terms of sustainability, s ...
Voir le projet

 19

 TERMINÉ 
EO2HEAVEN contributes to a better understanding of the complex relationships between environmental changes and their impact on human health. The project will monitor changes induced by human activities, with emphasis on atmospheric, river, lake and coastal marine pollution. EO2HEAVEN will follow a multidisciplinary and user-driven approach involving public health stakeholders who will work closely ...
Voir le projet

 15

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 

Smart robotics for high added value footwear industry (ROBOFOOT)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

Description Robots improving the shoe production processes Footwear production is still mainly handcrafted. Currently, opposite to other manufacturing sectors like automotive, food or metal processing, robots are still uncommon in the footwear industry. The introduction of robotics will contribute ...
Voir le projet

 10

 TERMINÉ 

Tagging Tool based on a Semantic Discovery Framework (TATOO)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

This proposal aims to set up a semantic web solution to close the discovery gap that prevents a full and easy access to environmental resources on the web. The proposal assumes the following: 1. It is meaningless to create yet another standard to facilitate access; we must exploit existing standards; 2. The burden of facilitating access to existing resources cannot be solely delegated to the owner ...
Voir le projet

 7

 TERMINÉ 
The LIMA project exploits cutting edge photonic technologies to enhance silicon solar cell efficiencies with new concepts in nanostructured materials. It proposes nano-structured surface layers designed to increase light absorption in the solar cell while decreasing surface and interface recombination loss. Integration in a back contact design further reduces these interface losses and avoids s ...
Voir le projet

 7

 TERMINÉ 

Open Architecture for Secondary Nodes of the Electricity SmartGrid (OpenNode)

Date du début: 1 janv. 2010, Date de fin: 30 sept. 2012,

European energy industry is facing three major challenges:a) the increased integration of renewable, fluctuating power resources to achieve the climate goals,b) increased "smartness" especially in the electrical distribution grid to cope with increasing capacity requirements and finallyc) the stakeholder diversification separating grid operation, power provisioning, metering services, auxiliary se ...
Voir le projet

 9

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54