Rechercher des projets européens

27 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Southern Europe and the Mediterranean region are facing the challenge of managing its water resources under conditions of increasing scarcity and concerns about water quality. Already, the availability of fresh water in sufficient quality and quantity is one of the major factors limiting socio economic development. Innovative water management strategies such as the storage of reclaimed water or ex ...
Voir le projet

 23

 TERMINÉ 
NANOFOOT main goal is to develop advanced and innovative nanotechnology based solutions for leathers and polymers components for footwear products, aiming a new sustainable and customer-driven production of consumer goods; where the health, environment, high quality of components, fair marketing communication and competitive sales price are combined to promote the competitiveness of the companies. ...
Voir le projet

 9

 TERMINÉ 

Advanced Cyber Defence Centre (ACDC)

Date du début: 1 févr. 2013, Date de fin: 31 juil. 2015,

In ACDC, we bring together partners from 14 European countries, including public administrations, private sector organizations and academia, in order to achieve a sustainable victory over a powerful cyber threat commonly known as botnet. We integrate the matured knowledge of our consortium into an integrated strategy ranging from adoption to governance, supported by a full service offer for contro ...
Voir le projet

 28

 TERMINÉ 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Voir le projet

 72

 TERMINÉ 

Increase Innovation and Research within Security Organisations (INSec)

Date du début: 1 avr. 2012, Date de fin: 31 juil. 2014,

Research within Security Organizations by analyzing the main aspects of Innovation Management in security-related operators (end-users), both public and private and not only in terms of quantity but also quality. It is important to assist these organisations to become conscious of the importance of managing Research and Innovation activities.INSec will establish a framework that will contribute to ...
Voir le projet

 19

 TERMINÉ 

Wireless Hybrid Enhanced Mobile Radio Estimators - Phase 2 (WHERE2)

Date du début: 1 juil. 2010, Date de fin: 31 oct. 2013,

The availability of position information plays an increasing role in wireless communications networks already today and will be an integral part of future systems. They inherently can offer the ability for stand-alone positioning especially in situations where conventional satellite based positioning systems such as GPS fail (e.g., indoor). In this framework, positioning information is an importan ...
Voir le projet

 17

 TERMINÉ 
EUROPTIMAChanging the paradigm in data and fare collection systemsEUROPTIMA addresses the need for implementing data and fare collection systems adapted to the requirements of mass transit operators in terms of cost of implementation, cost of operation, modularity of the system and flexibility in terms of fare evolutions, interoperability and customer relationship. In particular, EUROPTIMA targets ...
Voir le projet

 7

 TERMINÉ 

Europe Africa Marine Network (EAMNet)

Date du début: 1 mars 2010, Date de fin: 30 juin 2013,

EAMNet aims to construct a network linking Earth Observation (EO) information providers, user networks and centres of excellence in Europe and Africa in the area of coastal and marine observations towards sustainable development in Africa. The network will undertake capacity building and maintenance and build upon existing infrastructure and expertise in Africa. The overall aim is to improve the e ...
Voir le projet

 10

 TERMINÉ 
"The European rail industry is showing signs of steady recovery after a long period of decline. The technological advances in train design have led to the manufacturing of faster, greener and more comfortable trains making rail transport a more attractive option for passengers in comparison with other means of transportation. The ever growing need for the society to employ more environmentally fri ...
Voir le projet

 13

 TERMINÉ 

Quality of Service and MObility driven cognitive radio Systems (QoSMOS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

QoSMOS is a 3-year Integrated Project that aims at researching, developing and integrating a Cognitive Radio (CR) framework to enable mobile broadband systems to improve utilisation of licensed and/or unlicensed bands, by adding dynamic exploitation of under-utilised spectrum. The technical focus is on opportunistic use of spectrum combined with managed Quality of Service (QoS) and seamless mobili ...
Voir le projet

 15

 TERMINÉ 
The proposed research project will study the interactions between knowledge, economic growth and social wellbeing in Europe. It focuses on knowledge-intensive entrepreneurship as a necessary mechanism and an agent of change mediating between the creation of knowledge and its transformation into economic activity. Knowledge-intensive entrepreneurship is perceived herein as a core interface between ...
Voir le projet

 22

 TERMINÉ 

Anticipating the Network of the Future - From Theory to Design (Euro-NF)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2012,

Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Voir le projet

 37

 TERMINÉ 
EURO-FOS aims at creating a powerful pan-European network on photonic subsystems by clustering top European systems groups with proven track record in the design, development and evaluation of photonic subsystems. EURO-FOS aims at bridging the gap between research on device-level physics and new architectures from the network-level. The first objective of the project is the integration of research ...
Voir le projet

 18

 TERMINÉ 

A Preparatory phase proposal for the Square Kilometre Array (PrepSKA)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2012,

The Square Kilometre Array (SKA) will be one of the largest scientific projects ever undertaken. It is a machine designed to answer some of the big questions of our time: what is Dark Energy? Was Einstein right about gravity? What is the nature of dark matter? Can we detect gravitational waves? When and how did the first stars and galaxies form? What was the origin of cosmic magnetism? How do Eart ...
Voir le projet

 24

 TERMINÉ 

Integrated Approaches for Sustainable European Wine Production (SUSTAVINO)

Date du début: 1 févr. 2009, Date de fin: 31 mars 2012,

"About 65% of the world’s wine production is managed by European winegrowers. Wine production in Europe is traditionally performed by small and medium sized, family owned companies and co-operatives. Solid and liquid residues are not treated in an appropriate way what has a serious impact on the environment. Wine production is known to produce high amounts of wastewater with sometimes extremely hi ...
Voir le projet

 15

 TERMINÉ 
ASPIRE will research and provide a radical change in the current RFID deployment paradigm through innovative, programmable, royalty-free and privacy friendly middleware. This new middleware paradigm will be particular beneficial to European SME, which are nowadays experiencing significant cost-barriers to RFID deployment.European networked enterprises in general and SME in particular are still rel ...
Voir le projet

 12

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53

 TERMINÉ 

Scalable Advanced Ring-based passive Dense Access Network Architecture (SARDANA)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Scalable Advanced Ring-based passive Dense Access Network ArchitectureMain ObjectivesThe intensive use of optical transparency and the latest opto-electronic technologies enables to expand the PON performances and functionality while minimizing the infrastructure requirements at both urban and rural areas Fibre-to-the-Home net ...
Voir le projet

 9

 TERMINÉ 

IP-Based Emergency Applications and Services for Next Generation Networks (PEACE)

Date du début: 1 sept. 2008, Date de fin: 31 janv. 2011,

The transition to next generation networks is often coupled with the vision of innovative services providing personalized and customisable services over an all-IP infrastructure. To enable a smooth transition, next generation all-IP networks need not only support more services but also support current vital services, namely emergency services. In the PEACE project we will provide a general emergen ...
Voir le projet

 8

 TERMINÉ 
For any IMS (IP Multimedia Subsystem) or pre-IMS combined network, the key enabling function for seamless mobility and service continuity among a variety of mobile/wireless access technologies supporting IP connectivity is the handover. HURRICANE focuses on the key RTD challenge to investigate, design, implement, validate and propose for standardisation, inter-system handover operations among vari ...
Voir le projet

 8

 TERMINÉ 

Enhanced Wireless Communication Systems Employing COoperative DIVersity (CODIV)

Date du début: 1 janv. 2008, Date de fin: 31 oct. 2010,

The CODIV project is targeting the evolutions of cellular networks and WMAN's. and aims to research develop and validate radio technologies exploiting channels diversity and cooperation between users, targeting three major goals: enable the high bit rates targeted in the broadband component of future wireless system; improve the power and spectrum efficiencies of existing wireless systems; improv ...
Voir le projet

 8

 TERMINÉ 
Current two big trends in wireless communications are the development of new broadband component and the integration of heterogeneous wireless networks, to achieve the vision f the so-called 4G network.The FUTON project addresses both issues by proposing the development of a hybrid fiber-radio infrastructure transparently connecting remote antenna units to a central unit where a joint processing c ...
Voir le projet

 17

 TERMINÉ 

Context Casting (C-CAST)

Date du début: 1 mars 2008, Date de fin: 31 juil. 2010,

Project Context Casting (C-Cast) main objective is to evolve mobile multimedia multicasting to exploit the increasing integration of mobile devices with our everyday physical world and environment. The key motivation for this project and why we believe Europe needs a project on Context Casting is because multicasting is the key enabler that will make mobile context aware services commercially attr ...
Voir le projet

 13

 TERMINÉ 

Wireless Hybrid Enhanced Mobile Radio Estimators (WHERE)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

To increase ubiquitous and mobile network access and data rates, scientific and technological development is more and more focussing on the integration of radio access networks (RANs). For an efficient usage of RANs, knowledge of the position of mobile terminals (MTs) is valuable information in order to allocate resources or predict the allocation within a heterogeneous RAN infrastructure.The main ...
Voir le projet

 16

 TERMINÉ 

Secure Widespread Identities for Federated Telecommunications (SWIFT)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Identity Management is considered key to private, legal and business transactions as in the European eIDM2010. IdM frameworks are however currently confined to the web services domain. SWIFT goes beyond this by including user centricity and network operators as additional interdependent domains with IdM at the core.This new view of user centricity provides a novel perspective: Identity as central ...
Voir le projet

 10

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39

 TERMINÉ 

MOdelling and CHAracterization for SiP Signal and Power Integrity Analysis (MOCHA)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2010,

Today advanced System-in-Package(SiP) can integrate several Large-Scale-Integration(LSI) technologies and functionalities (advanced System-on-Chip-SoC),high-density memories,high-performance analogue-block.It's become strategic to analize and detect potential signal and power integrity failures before the prototype phase.The key to success is a set of integrated EDA tools and modelling flows that ...
Voir le projet

 6