Rechercher des projets européens

9 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

"Zero ENergy In Telecom-Tv HYbrid Station" (LIFE ZENITTHYS)

Date du début: 1 juin 2014, Date de fin: 31 mai 2017,

Background The largest radio frequency networks are designed for broadcasting television and radio services and for mobile communications. The success of mobile communications has boosted demand for denser and more sophisticated telecommunications networks. As a result, the number of relay stations for broadcast networks is now ten times greater that the ...
Voir le projet

 1

 TERMINÉ 
The ability of Europe’s communities to respond to increasing water stress by taking advantage of water reuse opportunities is restricted by low public confidence in solutions, inconsistent approaches to evaluating costs and benefits of reuse schemes, and poor coordination of the professionals and organisations who design, implement and manage them. The DEMOWARE initiative will rectify these shortc ...
Voir le projet

 30

 TERMINÉ 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Voir le projet

 60

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 

Emergency Support System (ESS)

Date du début: 1 juin 2009, Date de fin: 31 mai 2013,

"The Emergency Support System (ESS) is a suite of real-time data-centric technologies which will provide actionable information to crisis managers during abnormal events. This information will enable improved control and management, resulting in real time synchronization between forces on the ground (police, rescue, firefighters) and out-of-theater command and control centers (C&C). The approach g ...
Voir le projet

 21

 TERMINÉ 

Instant Mobility for Passengers and Goods (Instant Mobility)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2013,

The Instant Mobility project has created a concept for a virtual "Transport and Mobility Internet", a platform for information and services able to support radically new types of connected applications for scenarios centred on the stakeholder groups:•\tmultimodal travellers•\tdrivers & passengers•\tpassenger transport operators•\tgoods vehicle operators•\troad operators & traffic managers.The proj ...
Voir le projet

 24

 TERMINÉ 

Engine LUBrication SYStem technologies (ELUBSYS)

Date du début: 1 juin 2009, Date de fin: 30 nov. 2012,

"In aeronautics, gas turbine engines are equipped with lubrication systems whose function is to cool and lubricate the highly loaded rolling bearings and gearboxes. Current lubrication systems are based on architectures and technologies that have not much evolved for the last 30 years and that, despite advances made on components, have reached their technological limit. Future aero-engine requirem ...
Voir le projet

 20

 TERMINÉ 

valiDation of Radical Engine Architecture systeMs (DREAM)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Voir le projet

 46

 TERMINÉ 

More Integrated Systems Safety Assessment (MISSA)

Date du début: 1 avr. 2008, Date de fin: 30 juin 2011,

"The increase of aerospace systems complexity has meant that by using existing methods for systems development, industry has reached a barrier to innovation and a risk to the competitiveness of products. This is characterised by an increasing time to market for new technologies, increasing costs to demonstrate proof of safety, a greater demand for skilled resources and a limitation on design itera ...
Voir le projet

 13