Rechercher des projets européens

23 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Voir le projet

 20

 TERMINÉ 
Medtech products belongs to a huge expanding market, in which Europe hosts some of the biggest global player, accounting for 30% of the world market and for more than 575,000 people employed by nearly 25,000 medical technology companies – 95% of which are SMEs.Symbionica project focuses on the manufacturing of personalized bionics, smart endoprosthetics and exo-prosthetics that require geometric a ...
Voir le projet

 12

 TERMINÉ 

European Clearing House for Open Robotics Development Plus Plus (ECHORD Plus Plus)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Description ECHORD++ will create new opportunities for European robotics researchers to work directly with SME/start-ups and new users/customers to create innovative products. ECHORD++ will continue ECHORD’s two pillars, “experiments” and “structured dialogue”, taking advantage of experience and investment in the infrastructure. In addition, ...
Voir le projet

 68

 TERMINÉ 
The objective of PREVIEW is to develop a Cyber Physical System (CPS) for plastic injection manufacturing processes monitoring, control and optimization, by incorporating several innovative and cutting edge technological solutions: advanced artificial intelligence and machine learning techniques, robust industrial wireless communication, IoT and indoor location. PREVIEW is a middleware solution tha ...
Voir le projet

 8

 TERMINÉ 
Borealis project presents an advanced concept of machine for powder deposition additive manufacturing and ablation processes that integrates 5 AM technologies in a unique solution. The machine is characterized by a redundant structures constituted by a large portal and a small PKM enabling the covering of a large range of working cube and a pattern of ejective nozzles and hybrid laser source targe ...
Voir le projet

 16

 TERMINÉ 
During more than 50 years of the laser existence, they have been proved as the unique tool for diverse material processing application. New application ideas, coming from universities and research institutions, are usually implemented by spin-off companies with limited resources for market penetration. Research laboratories are using universal laser tools, while effective and low-cost production r ...
Voir le projet

 36

 TERMINÉ 

SINDBAD/TRANSDUAL/move-it

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

sequa is a non-profit organization of the German private sector. Shareholders are Germany's top four business membership organisations DIHK, ZDH, BDI and BDA as well as GIZ. sequa is a globally operating development organisation that has carried out projects and programmes of international cooperation in close collaboration with the German private sector since 1991. VET and mobility of employees i ...
Voir le projet

 24

 TERMINÉ 

A European Platform for Translational Cancer Research (EUROCANPLATFORM)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2016,

Europe has a number of advantages as regards developing translational cancer research, yet there is no clear European strategy to meet the increasing burden posed by cancer. The FP6 Eurocan+Plus project analysed the barriers underlying the increasing fragmentation of cancer research and stressed the need to improve collaboration between basic/preclinical and comprehensive cancer centres (CCCs), in ...
Voir le projet

 29

 TERMINÉ 

RetroKit - Toolboxes for systemic retrofitting (RETROKIT)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

RetroKit will develop and demonstrate multifunctional, modular, low cost and easy to install prefabricated modules, integrating efficient energy use systems and RES for systemic retrofitting of residential buildings. Aiming at external retrofitting concepts with an integration of internal renovation aspects, semi-prefabricated technological solutions will be clustered in a “RetroKit Toolbox” supp ...
Voir le projet

 20

 TERMINÉ 
The project intends to explore the feasibility of introducing to the market Sea Litter Critters, a compact, unmanned, renewables-powered and self sufficient marine litter collection and treatment vessel based on a patent pending device treating waste thermally with plasma technology and no harmful emissions. This device is designed to operate near the shores especially nearer tourist facilities su ...
Voir le projet

 1

 TERMINÉ 

white room based on Reconfigurable robotic Island for optoelectronics (whiteR)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The young optoelectronic industry has critical mass and already impacts for more than the 10% on the European economy, employing 290 000 people and guarantees a stable double digit growth in current and coming years. Europe is playing a leading role in R&D (>1,000 research organization active) and is still able to face Far East and American competitors in manufacturing. white’R is a necessary acti ...
Voir le projet

 13

 TERMINÉ 

Europeana Cloud: Unlocking Europe's Research via The Cloud (eCloud)

Date du début: 1 févr. 2013, Date de fin: 30 avr. 2016,

Europeana Cloud is a Best Practice Network, submitted under Objective 2.1.a and coordinated by the Europeana Foundation, designed to establish a cloud-based system for Europeana and its aggregators. Europeana Cloud will provide new content, new metadata, a new linked storage system, new tools and services for researchers and a new platform - Europeana Research. Content providers and aggregators, a ...
Voir le projet

 36

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
"The main aim of TRANSBIO is the implementation of an innovative cascading concept for the valorisation of sub-products from fruit and vegetable processing industry using environmental friendly biotechnological solutions like fermentation and enzyme-conversion strategies to obtain valuable bioproducts like plastics (PHB), nutraceuticals / platform chemical succinic acid and enzymes for detergent a ...
Voir le projet

 16

 TERMINÉ 

2nd-Generation Open Access Infrastructure for Research in Europe (OpenAIREplus)

Date du début: 1 déc. 2011, Date de fin: 31 déc. 2014,

OpenAIREplus will build a 2nd-Generation Open Access Infrastructure by significantly expanding in several directions the outcomes of the OpenAIRE project, which implements the EC Open Access (OA) pilot. Capitalizing on the OpenAIRE infrastructure, built for managing FP7 and ERC funded articles, and the associated supporting mechanism of the European Helpdesk System, OpenAIREplus will "develop an o ...
Voir le projet

 42

 TERMINÉ 
"The WASH&LOAD project aim is to scientifically characterise latest achievements in science and technology for the development of Guidelines and Pre-normative research aimed at supporting the more than 20,000 SMEs involved in the functional clothing value chain in implementing cost-effective practices for reloading protective functionalities in protective clothing and bed linen textiles during lif ...
Voir le projet

 16

 TERMINÉ 

European Clearing House for Open Robotics Development (ECHORD)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2013,

Description Strengthening the knowledge transfer between scientific research and industry in robotics and stimulating their cooperation In Europe the robotics industry is strong, but still fragmented and dispersed. The objective of ECHORD is to provide new opportunities for coordinated and target- ...
Voir le projet

 105

 TERMINÉ 
Brominated flame retardants (BFRs) will be phased out because of their environmental hazards. Less toxic alternatives appear to be available already but comprehensive information on their possible toxicological effects are lacking. ENFIRO offers a prototypical case study on substitution options for BFRs resulting in a comprehensive dataset on viability of production and application, environmental ...
Voir le projet

 14

 TERMINÉ 

Open Access Infrastructure for Research in Europe (OpenAIRE)

Date du début: 1 déc. 2009, Date de fin: 30 nov. 2012,

The proposed project will deliver "an electronic infrastructure and supporting mechanisms for the identification, deposition, access, and monitoring of FP7 and ERC funded articles", where the main supporting mechanism will be the establishment and operation of the European Helpdesk System. Additionally, the project will offer "a special repository for articles that can be stored neither in institu ...
Voir le projet

 39

 TERMINÉ 
Polyfire will develop and upscale techniques for processing halogen-free, fire-retardant nanocomposites and coatings based on unsaturated polyester resins and nanoclays. These materials will improve public safety and environmental impact by eliminating halogenated fire-retardants, which produce toxic combustion products. The ability of well-dispersed nanoparticles to enhance the fire-retardancy of ...
Voir le projet

 11

 TERMINÉ 
Light+ter project addresses a public health problem, i.e. coagulation disorders, typical of hereditary diseases like haemophilia (40,000 people affected in EU27), or induced by use of specific anti-coagulant drugs (20 million people in EU27). Bleeding disorders have a strong impact on the quality of life. Usual small medical interventions, as dental surgery, pose important problems for these patie ...
Voir le projet

 8

 TERMINÉ 

Smart fire-retardant coatings based on intumescent nanocomposites (HEFEST)

Date du début: 1 nov. 2008, Date de fin: 28 févr. 2011,

"In Europe, annual fire losses reach 80 billion €, meaning more than 1% of EU GDP, 4000 people die and another 80000 suffer terrible burns. The use of fire retarding intumescent coatings play an important role in Fire Safety being this subsector mainly comprised by SMEs. Nowadays, a variety of fire intumescent coatings is available presenting diverse drawbacks such as: poor behaviour when ageing, ...
Voir le projet

 10

 TERMINÉ 
The starting point of the project is that there is nearly no knowledge on the teaching reality oftrainers in VET in Europe. This is astonishing because the teaching practice of trainers is astrategically important issue for the quality of output and outcome in VET. Therefore theteaching practice has to be focused in the debate on development and the improvement ofthe VET system.This was the backg ...
Voir le projet

 7