Rechercher des projets européens

15 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Urban water management becomes progressively more challenging in the view of population growth and increasing complexity of water management infrastructure. In this line, there is an ever increase demand from the water providers’ and public authorities’ perspective to critically evaluate the existing water ecosystems at city level in respect to the water supply, waste water treatment, reuse potent ...
Voir le projet

 7

 TERMINÉ 
To handle the unprecedented demand for mobile data traffic, different vendors, operators and research programmes have aimed to develop radio access technologies (RATs) that boost physical-layer link capacity, utilize millimeter wave radio, or further densify network topology. Notable steps have also been made towards shifting baseband processing from the (currently) ultra dense network edge to a c ...
Voir le projet

 10

 TERMINÉ 
The current paradigm in service provisioning to future communication networks lacks thorough end-to-end interpretation from the quality viewpoint, while the end-users’/customers’ profiles and preferences are mostly not taken into account. The subjective perception of a provided service, known as Quality of Experience (QoE), is one of the most important factors for a user’s decision on retaining th ...
Voir le projet

 7

 TERMINÉ 
The vision of future 5G networks encompasses a heterogeneous communication landscape in which existing Radio Access Technologies (RATs) will be integrated with evolving wireless technologies and systems, software-design network architectures and cloud-enabled services. Effectively harnessing the potential of all these innovative and heterogeneous features and providing a programmable multi-tenant ...
Voir le projet

 8

 TERMINÉ 

Deploying High Capacity Dense Small Cell Heterogeneous Networks (DECADE)

Date du début: 1 août 2015, Date de fin: 31 juil. 2019,

Broadband mobile networks are experiencing exponential traffic growth. It is predicted that this trend will continue in the next five to ten years with an estimated compound annual growth rate of 0.6 to 1.0. Hence the traffic (mostly data) carried by a mobile operator’s network in 2022 could be over 1000 times of that in 2012. This traffic growth presents a huge challenge to both the mobile indust ...
Voir le projet

 4

 TERMINÉ 

Flexible FE/BE Sensor Pilot Line for the Internet of Everything (IoSense)

Date du début: 1 mai 2016, Date de fin: 30 avr. 2019,

The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Voir le projet

 33

 TERMINÉ 
The fifth-generation (5G) is coming.Quo vadis 5G?What architectures, network topologies and technologies will define it?Are methodologies to the analysis, design and optimization of current cellular networks still applicable to 5G? 5Gwireless is the first integrated and multi-disciplinary training-through-research network of ESRs and Senior Supervisors fully committed to re-architecting current ce ...
Voir le projet

 10

 TERMINÉ 
...ruitful collaboration of four partners, two from academia, i.e., Aristotle University of Thessaloniki (AUTH) and Technical University Berlin (TUB), and two SMEs, i.e., PhoeniX Software B.V. (PHX) and iQuadrat (IQU). As a whole, the partners have consolidated and complementary expertise in the engineering, design, analysis, simulation and experimentation that are demanded to fulfill the project’s g ...
Voir le projet

 4

 TERMINÉ 

COgnitive & Perceptive CAMeraS (COPCAMS)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2016,

Vision systems are becoming ubiquitous in our daily lives. Complex analysis of images from multiple cameras will become the norm in the future, from cars to industrial systems, from smart cities to facility monitoring, aimed at extracting meaningful, context-dependent information.Today’s market is dominated by a combination of relatively simple, fixed function, configurable cameras that stream vid ...
Voir le projet

 25

 TERMINÉ 
"The aim of the CROSSIRE project is to provide forward-looking solutions for Long-Term Evolution-Advanced (LTE-A) network co-existence including aspects ranging from the physical layer such as co-channel interference and cognition to the user perception of the service, i.e., Quality of Experience (QoE). The project will analyze and propose network virtualization solutions for LTE-A networks a tech ...
Voir le projet

 8

 TERMINÉ 

Environmental Sensors for Energy Efficiency (ESEE)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2016,

ESEE – Environment Sensors for Energy Efficiency targets the markets, were with highly reliable information regarding environmental conditions measures can be deducted, which safe the use of energy. The research will be performed on several different sensor technoglogy approaches and finally validated in a test environment, e.g. under the environmental conditions of an aircraft. In addition an app ...
Voir le projet

 27

 TERMINÉ 

Advanced Network Coding for Video Surveillance (CodeLance)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

CodeLance is about an industry-academia cooperation that will exploit the know-how on ICT of both academic and commercial companies, in order to provide an efficient product for video surveillance over wireless multihop networks to support services like, traffic monitoring, fire detection and real-time events (such as natural disasters) broadcasting for the societies of the smart cities.Video surv ...
Voir le projet

 4

 TERMINÉ 

Dense Cooperative Wireless Cloud Network (DIWINE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

DIWINE considers wireless communication in a dense relay/node scenario where WNC (Wireless Network Coding) messages are flooded via dense massively air-interacting nodes in the self-contained cloud while the PHY air-interface between the terminals (sources/destinations) and the cloud is simple and uniform. A complex infrastructure cloud creates an equivalent air-interface to the terminal, which is ...
Voir le projet

 9

 TERMINÉ 

ENERGY TO SMART GRID (E2SG)

Date du début: 1 avr. 2012, Date de fin: 1 mars 2015,

The target of the overall E2SG project is to devise and design mechanisms and policies to assemble, monitor and control smart grids, i.e. a set of interconnected nodes whose primary goal is to generate, exchange and consume electrical energy in the most efficient and reliable way by exploiting distributed information that is sensed, transmitted and processed over the same set of nodes and links. F ...
Voir le projet

 32

 TERMINÉ 
This project aims at developing architecture and technologies for implementing agile radio frequency (RF) transceiver capacities in future radio communication products. These new architecture and technologies will be able to manage multi-standard (multi-band, multi-data-rate, and multi-waveform) operation with high modularity, low-power consumption, high reliability, high integration, low costs, l ...
Voir le projet

 41