Rechercher des projets européens

4 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Optimising time-to-FLY and enhancing airport SECurity (FLYSEC)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

Complementing the ACI/IATA efforts, FLYSEC project aims to develop and demonstrate an innovative integrated and end-to-end airport security process for passengers, enabling a guided and streamlined procedure from the landside to airside and into the boarding gates, and offering for the first time an operationally validated innovative concept for end-to-end aviation security. On the technical side, ...
Voir le projet

 11

 TERMINÉ 

Multi-frequency multi-mode Terahertz screening for border checks (TERASCREEN)

Date du début: 1 mai 2013, Date de fin: 31 oct. 2017,

Security checks at borders are required to be increasingly thorough and fast. There are currently two types of technologies available for this application: those that automatically detect objects concealed on a person, and those that rely on human operator analysis and interpretation in order to classify or identify body-borne threats.The objective of TeraSCREEN is to combine these two capabiliti ...
Voir le projet

 12

 TERMINÉ 

Coordinating Air transport Time Efficiency Research (CATER)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

Europe, through the High Level Group on Aviation Research, ACARE and the Commission, has a vision for air transport in meeting societal & market needs over the coming 30 years. Central to this is time efficiency, meaning reduced door-to-door journey times, seamless inter-modal connections and reliability. For this Europe will engage in large scale, intensive and coordinated research & innovati ...
Voir le projet

 10

 TERMINÉ 

ASSET – Aeronautic Study on Seamless Transport (ASSET)

Date du début: 1 juin 2008, Date de fin: 30 nov. 2011,

"Airport ground processes still conceal a considerable potential for improvement of time efficiency. Recent studies from Eurocontrol Performance Review Commission prove that insufficient punctuality in air transport results mainly from variance in off-block times. This leads to poor predictability and sizeable inefficiencies throughout the whole air transport system. Aim of proposed project is to ...
Voir le projet

 15