Rechercher des projets européens

19 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
This three-year project is to release, validate and verify a unique computer environment (i.e. the EPICEA platform) assimilating a complete understanding of electromagnetic (EM) issues on Composite Electric Aircraft (CEA – i.e. aircraft with composite and electric technologies combined and operating at higher altitude/latitude). EM on CEA includes EM coupling, interconnects, and Cosmic Radiations ...
Voir le projet

 5

 TERMINÉ 

NANOARCHITECTRONICS

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2018,

This FET-open Coordination and Support Action is called “Nanoarchitectronics” (NTX) to denote a new interdisciplinary research area at the crossroad of Electromagnetics and Nanoelectronics. NTX It is a new technology aimed at conceiving, designing and developing reconfigurable, adaptive and cognitive structures, sensorial surfaces and functional “skins” with unique physical properties, and enginee ...
Voir le projet

 13

 TERMINÉ 

Promoting EGNSS Operational Adoption in BLUEMED FAB (BLUEGNSS)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2018,

Promoting EGNSS Operational Adoption in BLUEMED FABBLUEGNSS proposal aims at promote innovation technologies to maximise the potential of the European GNSS and its adoption. The Consortium, led by ENAV, Italian Air Navigation Service Provider, sees the participation of the other BLUE MED FAB ANSPS partners, such as DCAC – Cyprus, HCAA – Greece, MATS – Malta and is complemented by an industrial p ...
Voir le projet

 5

 TERMINÉ 

New Technologies for Tunnelling and Underground Works (NETTUN)

Date du début: 1 sept. 2012, Date de fin: 28 févr. 2017,

The NeTTUN 54M project will enable groundbreaking change in the construction, management and maintenance of tunnels in pursuit of the goals of NMP.2011.4.0-2 via 9 focussed WPs addressing key scientific and technical challenges: (i) a multi-sensor ground prediction system for TBMs to enable effective look-ahead during boring; (ii) a robotic maintenance system that enables automation of inspection ...
Voir le projet

 24

 TERMINÉ 

Cities demonstrating cybernetic mobility (CITYMOBIL2)

Date du début: 1 sept. 2012, Date de fin: 31 août 2016,

European cities face four main mobility problems: congestion, land use , safety and environment. One of the main causes of such problems is the car-ownership rate. The centres of large cities address this issue combining efficient mass transits with car restriction policies but peripheral areas and smaller cities remain dominated by private cars.CityMobil has demonstrated how automating road vehi ...
Voir le projet

 49

 TERMINÉ 
The MAIN OBJECTIVE of the project is to plan and run ad hoc measurements finalized to test, validate and optimize:1) The radar signal simulator CleoSIm developed in the CLEOPATRA project;2) The radar signal processing and weather classification algorithms implemented on an EFB in the KLEAN project.3) The EFB GUI interfaces for the advanced display of weather classifications and decision-making adv ...
Voir le projet

 4

 TERMINÉ 
The project AhEAD - Advanced dEsign and testing of a polArimetric X-band antenna for avionic weather radar, aims at designing and testing a polarimetric avionic radar antenna operating at X band for weather characterization and classification.After the requirements have been defined, the project will identify the best solution of the antenna configuration in terms of technology and architecture by ...
Voir le projet

 3

 TERMINÉ 
Clearing large civilian areas from anti-personnel landmines and cluster munitions is a difficult problem because of the large diversity of hazardous areas and explosive contamination. A single solution does not exist and many mine action actors have asked for a toolbox from which they could choose the tools best fit to a given situation. Some have built their own toolboxes, usually specific to som ...
Voir le projet

 26

 TERMINÉ 
Security and quality of life in industrialized countries depend on continuous and coordinate performance of a set of infrastructures (energy systems, ICT systems, transportation etc) which can be therefore defined “critical infrastructures” (CI).“STRUCTURES - Strategies for The impRovement of critical infrastrUCTUre Resilience to Electromagnetic attackS” aims at analyzing possible effects of elect ...
Voir le projet

 13

 TERMINÉ 

Tilt Rotor ATM Integrated Validation of Environmental Low Noise Procedures (TRAVEL)

Date du début: 1 févr. 2012, Date de fin: 31 oct. 2015,

"Cleansky-Green Rotor Craft sub-project 5 is aimed at developing and testing new flight procedures for both helicopters and tilt rotors, aiming at significantly reduce environmental impact in terms of noise and gas emissions.This project contributes to this objective defining and validating, using an integrated Tilt Rotor-ATM simulation platform, new low noise ATC procedures for Tilt Rotor operati ...
Voir le projet

 2

 TERMINÉ 

Operational Radar For Every drill string Under the Street (ORFEUS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

Horizontal directional drilling (HDD) offers significant benefits for urban environments by minimising the disruption caused by street works. Use of the technique demands an accurate knowledge of underground utility assets and other obstructions in the drill path.This proposal is to progress the prototype HDD bore-head radar technology developed under the project ORFEUS to a commercial stage.ORFE ...
Voir le projet

 11

 TERMINÉ 

in flight Trajectory optimizAtion through advanCed simulation TechnICs (TACTIC)

Date du début: 1 nov. 2013, Date de fin: 31 juil. 2015,

The Commercial and Airline Pilots are skilled to deal with their aircraft emergencies. On the contrary, when the occurrence of unusual situations, requires trajectory change during IFR navigation, pilot in command, involved in a short time analysis and synthesis, could be not able to consider all those aspects affecting the new flight trajectory negotiation.In such situations the pilot may have gr ...
Voir le projet

 2

 TERMINÉ 

Aircraft lightning thtRreat Reduction thrOugh Wiring optimization (ARROW)

Date du début: 6 mai 2013, Date de fin: 5 mars 2015,

ARROW project aims at developing a numerical methodology and a SW tool to model indirect effects of lightning on cable-harness configurations installed aboard aircrafts made of composite materials and equipped with a “current return network” (ALEEN, ALmost Equipotential Electrical Network). The Tool shall be able to:• input geometry and material properties of the aircraft and of ALEEN from CAD (C ...
Voir le projet

 4

 TERMINÉ 

optimizinG Electrical Network In AirpLane composite structures (GENIAL)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2013,

"GENIAL project aims at developing a numerical methodology and a SW tool to model the current return networks (called ALEEN, ALmost Equipotential Electrical Network) installed aboard composite aircrafts. It will be able to:- input geometry and material properties of ALEEN (including also metallic structural parts of the aircraft if any) from CAD;- accept measured data as partial characterization ...
Voir le projet

 2

 TERMINÉ 

CLEaner OPerations Attained Through Radars' Advance (CLEOPATRA)

Date du début: 11 avr. 2011, Date de fin: 10 juil. 2013,

"CLEOPATRA project aims at developing a SW procedure able to simulate relevant weather phenomena as they appear to airborne weather radars, starting from a high level description of the weather phenomenon (scenario), up to obtain the polarimetric I/Q signals at radar output. Such data have to be used as input to processing system simulation software (outside the scope of the present work) to be de ...
Voir le projet

 4

 TERMINÉ 

HIRF Synthetic Environment (HIRF SE)

Date du début: 1 déc. 2008, Date de fin: 31 mai 2013,

"The HIRF SE research project has the goal of providing the aeronautics industry with a framework which can be used during the development phase to mitigate the EM aspects. In addition it will provide a considerable reduction in the certification/qualification tests required on air vehicle. The HIRF SE main objectives can be summarized by the two followings items: • Full validated and integrated s ...
Voir le projet

 45

 TERMINÉ 

Coordinating the Antenna Research in Europe (CARE)

Date du début: 1 janv. 2010, Date de fin: 30 avr. 2012,

The European antenna research received great benefits from the structuring efforts provided by the Network of Excellence ACE (2004-2007). The ACE NoE produced a long list of outstanding results, such as the Antenna Expert Groups (AEG), the European School of Antennas (ESoA), the European Conferences on Antennas and Propagation (EuCAP), the Antenna Virtual Centre of Excellence (VCE) and the Europea ...
Voir le projet

 15

 TERMINÉ 

Antenna Research and Technology for the Intelligent Car (ARTIC)

Date du début: 1 avr. 2008, Date de fin: 30 sept. 2010,

Antenna Research is a strategic enabling technology for intelligent vehicles and road safety services. Car-to-car communications, real time congestions localisation, obstacle and collision radars, on board sensor networks, etc. are based on novel antennas solutions and subsystems integration.Antenna Research in Europe received great benefits from the structuring efforts provided by the Network of ...
Voir le projet

 11

 TERMINÉ 
Estia-Earth aims to develop new educational structures, friendly to women, by introducing joint multidisciplinary postgraduate curricula in partner universities, involving Engineering, Computers and Sciences, and will: - develop a new framework for professional development of women, leading to courses at postgraduate level and further promote the mobility of women academic staff and students throu ...
Voir le projet

 31