Rechercher des projets européens

19 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Voir le projet

 43

 TERMINÉ 

Modular Microserver DataCentre (M2DC)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Modular Microserver DataCentre (M2DC) will investigate, develop and demonstrate (Technology Readiness Level 7) a modular, highly-efficient, cost-optimized server architecture composed of heterogeneous microserver computing resources, being able to be tailored to meet requirements from various application domains such as image processing, cloud computing or even HPC. To achieve this objective, M2DC ...
Voir le projet

 14

 TERMINÉ 
Small Cells, Cloud-Radio Access Networks (C-RAN), Software Defined Networks (SDN) and Network Function Virtualization (NVF) are key enablers to address the demand for broadband connectivity with low cost and flexible implementations. Small Cells, in conjunction with C-RAN, SDN, NVF pose very stringent requirements on the transport network. Here flexible wireless solutions are required for dynamic ...
Voir le projet

 12

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Voir le projet

 20

 TERMINÉ 
The overall objective of the ROAM project is to investigate and demonstrate the use of the orbital angular momentum (OAM) modes of light for communications and networking. Two are the primary objectives.The firs objective is to exploit the use of OAM modes in optical fibres as a disruptive means of increasing optical fibre transmission capacity for short-reach high data density applications. A tra ...
Voir le projet

 7

 TERMINÉ 

MIcro KErneL virtualizAtioN for hiGh pErfOrmance cLOud and hpc systems (MIKELANGELO)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

MIKELANGELO is a project, targeted to disrupt the core underlying technologies of Cloud computing, enabling even bigger uptake of Cloud computing, HPC in the Cloud and Big Data technologies under one umbrella. The vision of MIKELANGELO is to improve responsiveness, agility and security of the virtual infrastructure through packaged applications, using lean guest operating system OSv and superfast ...
Voir le projet

 9

 TERMINÉ 

LArge Scale Information Exploitation of Forensic Data (LASIE)

Date du début: 1 mai 2014, Date de fin: 31 oct. 2017,

The LASIE project will design and develop a novel framework to assist forensic analysts in their investigations. The envisaged framework will be based on automated technology for advanced data processing supported by an important human component in critical decision making stages, as well as, legal and ethical aspects. The framework will consist of tools to automatically manipulate, analyse and fu ...
Voir le projet

 18

 TERMINÉ 
...r mobile users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Universities Aalto, Bristol, Cha ...
Voir le projet

 19

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Voir le projet

 18

 TERMINÉ 

BRIDGING THE GAP FOR ENHANCED BROADCAST (BRIDGET)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Description BRIDGET is opening new dimensions for multimedia content creation and consumption by enhancing broadcast programmes with bridgets.  A bridget links from the programme you are watching to second screen, interactive media such as web pages, images, audio clips, different types of video (2D, multi-view, with depth information, free ...
Voir le projet

 9

 TERMINÉ 
In 2020, mobile and wireless traffic volume is expected to increase thousand-fold over 2010 figures. Moreover, an increase in the number of wirelessly-connected devices to counts in the tens of billions will have a profound impact on society. Massive machine communication, forming the basis for the Internet of Things, will make our everyday life more efficient, comfortable and safer, through a wid ...
Voir le projet

 24

 TERMINÉ 

Towards Real Energy-efficient Network Design (TREND)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

European research cannot ignore key questions on energy consumption of communication networks, like: "Is the current growth of energy consumption in telecom infrastructures sustainable?"; "Can we generate and transport enough electricity to provide 100 Mb/s access to all in metropolitan areas?"; "Are optical technologies more energy-friendly than electronics?"; "Is the Internet protocol suite need ...
Voir le projet

 12

 TERMINÉ 

User-centric Wireless Local-Loop (ULOOP)

Date du début: 1 sept. 2010, Date de fin: 31 oct. 2013,

The flexibility inherent to wireless technologies is giving rise to new types of access networks and allowing the Internet to expand in a user-centric way. This is particularly relevant if one considers that wireless technologies such as Wireless Fidelity (Wi-Fi) currently complement Internet access broadband technologies, forming the last hop to the end-userr. This fact becomes even more signific ...
Voir le projet

 15

 TERMINÉ 

Cognitive Heterogeneous Reconfigurable Optical Network (CHRON)

Date du début: 1 juil. 2010, Date de fin: 30 sept. 2013,

The CHRON project addresses the challenge of controlling and managing the next generation of heterogeneous optical networks supporting the Future Internet. Such networks will be of a highly heterogeneous nature, ranging from a wide variety of classes of services with different requirements, to wide physical layer diversity in optical transmission techniques and optical switching paradigms. The CHR ...
Voir le projet

 8

 TERMINÉ 
The SmartAgriFood project addresses the food and agribusiness as a use case for the Future Internet. The intelligence, efficiency, sustainability and performance of the agri-food sector can be radically enhanced by using information & decision support systems that are tightly integrated with advanced internet-based networks & services. Concurrently, the sector provides extremely demanding use case ...
Voir le projet

 23

 TERMINÉ 

Cooperative and Self growing Energy aware Networks (CONSERN)

Date du début: 1 juin 2010, Date de fin: 30 sept. 2012,

CONSERN is introducing a novel paradigm for dedicated, purpose-driven small scale wireless networks characterized by a service-centric evolutionary approach, referred here as an energy-aware self-growing network and system.In the context of CONSERN, the Self-Growing network paradigm considers (i) mechanisms for energy efficient interaction of the wireless network elements and (ii) mechanisms for t ...
Voir le projet

 10

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53

 TERMINÉ 
Description Dynamic Impairment Constraint Networking for Transparent Mesh Optical NetworksMain ObjectivesThe key innovation of DICONET: “The development of a dynamic network planning tool residing in the core network nodes that incorporates real-time measurements of optical layer performance into IA-RWA algorithms and is integrated into a ...
Voir le projet

 13