Rechercher des projets européens

11 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Astronomy ESFRI and Research Infrastructure Cluster (ASTERICS)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

ASTERICS (Astronomy ESFRI & Research Infrastructure Cluster) aims to address the cross-cutting synergies and common challenges shared by the various Astronomy ESFRI facilities (SKA, CTA, KM3Net & E-ELT). It brings together for the first time, the astronomy, astrophysics and particle astrophysics communities, in addition to other related research infrastructures. The major objectives of ASTERICS ar ...
Voir le projet

 24

 TERMINÉ 
ALTAIR’s strategic objective is to demonstrate the feasibility of a new cost effective and reliable space launch system for the access to Low-Earth Orbit (400-1000 km) of small satellites ranging from 50 to 150 kg. The ALTAIR launch system aims to be the expected answer to the needs of small satellites users, providing an affordable and adapted access to space service, without the constraints of c ...
Voir le projet

 8

 TERMINÉ 
This project (R-Wake) aims at developing a simulation framework to assess the risk and hazards of potential wake vortex encounters for the en-route phase of flight.
Voir le projet

 6

 TERMINÉ 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Voir le projet

 39

 TERMINÉ 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Voir le projet

 36

 TERMINÉ 
ARINC-664 Part 7 specification (AFDX) provides the enabling technology for network I/O in Integrated Modular Avionics (IMA) architectures, since it is designed based on the IMA concepts and requirements (ARINC 653 specification), already an ESA roadmap (i.e. IMA4Space project). In order to avoid the lack of flexibility, scalability, reliability and to improve security and qualification process in ...
Voir le projet

 6

 TERMINÉ 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Date du début: 1 sept. 2009, Date de fin: 31 août 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Voir le projet

 42

 TERMINÉ 

FAST OPtimiser for continuous descent approaches (FASTOP)

Date du début: 1 nov. 2012, Date de fin: 31 mars 2014,

"In the conventional aircraft approach the aircraft receives clearance from Air Traffic Control to descent from the bottom level of the holding stack to a given altitude where it would fly level until intercepting the 3 degree glidepath to the runway. In this flight level segment the aircraft requires additional engine power to maintain constant speed, resulting in an increase of fuel consumption ...
Voir le projet

 3

 TERMINÉ 
Future electricity distribution networks with mass deployment of network equipment sensors and instrumentation, millions of smart meters, small-scale embedded generation, and responsive load will generate vast amounts of data requiring near to real-time analysis. So-called cloud and grid computing will enable scalable data mining, feature extraction, and near to real-time state estimation. These a ...
Voir le projet

 11

 TERMINÉ 

Neural network computation for fast trajectory prediction (Neural)

Date du début: 1 avr. 2011, Date de fin: 31 mai 2012,

...w SGO ITD to evaluate the potential benefit of the Neural Network for improving the access to the performance data.The Neural consortium was created to join the aeronautics and embedded experience of gtd and all the expertise in optimal control and high speed numerical integration with neural networks of the International Center for Numerical Methods in Engineering (CIMNE), a world-wide reference ...
Voir le projet

 2

 TERMINÉ 

Simulation of weather phenomena (SIMET)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2011,

Development of an innovative atmosphere & weather phenomena repository and planning system able to feed a simulator in order to perform mission trajectories simulation and environmental impact assessments.
Voir le projet

 4