Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

...ed digital dynamic maps to allow fully autonomous driving.AUTOPILOT IoT enabled autonomous driving cars will be tested, in real conditions, at four permanent large scale pilot sites in Finland, France, Netherlands and Italy, whose test results will allow multi-criteria evaluations (Technical, user, business, legal) of the IoT impact on pushing the level of autonomous driving."
Voir le projet

 43

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 

Dynamic Risk Approaches for Automated Cyber Defence (PANOPTESEC)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The PANOPTESEC consortium will deliver a beyond-state-of-the-art prototype of a cyber defence decision support system, demonstrating a risk based approach to automated cyber defence that accounts for the dynamic nature of information and communications technologies (ICT) and the constantly evolving capabilities of cyber attackers. "Panoptes" is an ancient Greek term meaning 'all eyes' or 'all see ...
Voir le projet

 10

 TERMINÉ 
The ubiquity of Internet access, and the wide variety of Internet-enabled devices and applications, have made the Internet a principal pillar of the Information Society. Decentralized and diverse, the Internet is resilient and universal. However, its distributed nature leads to operational brittleness and difficulty in identifying and tracking the root causes of performance and availability issues ...
Voir le projet

 17

 TERMINÉ 
Motivation. The last decades brought an exponential increase in mobile traffic volume. This will continue and a 1000-fold increase by 2020 has been forecasted. Small-cells promise to provide the required data rates through an increased spatial utilisation of the spectrum.Problem statement. Due to strong inter-cell interference, small-cell deployments will require a high degree of coordination as o ...
Voir le projet

 12

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

uBiquitous, secUre inTernet-of-things with Location and contExt-awaReness (BUTLER)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

Recent ICT advances are bringing to reality a world where sensors, actuators and smart portable devices are interconnected into an Internet-of-Things (IoT) ecosystem reaching 50 Billion devices by 2015.The IoT major challenges are, from a systemic viewpoint, smart resource management and digital security; and from a user/service perspective, the pervasiveness (uniformity of performance anytime an ...
Voir le projet

 23

 TERMINÉ 

Internet Connected Objects for Reconfigurable Ecosystems (iCore)

Date du début: 1 oct. 2011, Date de fin: 31 oct. 2014,

The iCore initiative addresses two key issues in the context of the Internet of Things (IoT), namely: (a) how to abstract the technological heterogeneity that derives from the vast amounts of heterogeneous objects, while enhancing context-awareness, reliability and energy-efficiency. (b) to consider the views of different users/stakeholders (owners of objects & communication means) for ensuring pr ...
Voir le projet

 28

 TERMINÉ 

Cooperative Mobility Systems and Services for Energy Efficiency (eCoMove)

Date du début: 1 avr. 2010, Date de fin: 31 janv. 2014,

The eCoMove project will create an integrated solution for road transport energy efficiency by developing systems and tools to help drivers sustainably eliminate unnecessary fuel consumption (and thus CO2 emissions), and to help road operators manage traffic in the most energy-efficient way. By applying this combination of cooperative systems using vehicle-infrastructure communication, the project ...
Voir le projet

 43

 TERMINÉ 

Trusted Computing for European Embedded devices (TOISE)

Date du début: 1 janv. 2011, Date de fin: 1 déc. 2013,

For the future European applications such as Smart Grids for electricity network, smart low energy controlled home appliance, smart logistics and monitoring of goods, environmental or infrastructure sensor networks, and more generally more wireless communications and more networking functionalities, a number of technologies need to be developed and put in place to make the solutions smarter and m ...
Voir le projet

 19

 TERMINÉ 

UniverSelf

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

The internet of today is fragmented into loosely interacting domains. Future Networks will be pervasive: people, machines and the surrounding spaces will form decentralized and dynamic networks of networks of as-yet unseen scales. Future Networks will challenge Service and Network Operators to find the right ways to embed intelligence into networks in order to ensure their autonomic management an ...
Voir le projet

 22

 TERMINÉ 

Open ContEnt Aware Networks (OCEAN)

Date du début: 1 févr. 2010, Date de fin: 31 août 2013,

OCEAN will design a new open content delivery framework that optimizes the overall quality of experience to end-users by caching content closer to the user than traditional CDNs do and by deploying network-controlled, scalable and adaptive content delivery techniques. The OCEAN architecture will clearly define light-weight signalling protocols and public interfaces between its major building block ...
Voir le projet

 9

 TERMINÉ 
The ALICANTE project proposes a novel concept towards the deployment of a networked 'Media Ecosystem'. The proposed solution is based on a flexible cooperation between providers, operators, and end-users, finally enabling every user to access the offered multimedia services in various contexts, and to share and deliver his own audiovisual content dynamically, seamlessly, and transparently. Towards ...
Voir le projet

 21

 TERMINÉ 

MultimEDia transport for mobIlE Video AppLications (MEDIEVAL)

Date du début: 1 juil. 2010, Date de fin: 31 juil. 2013,

Video is a major challenge for the future Internet. This traffic type is foreseen to account for close to 90 percent of consumer traffic already by 2012. However, the current Internet, and in particular the mobile Internet, was not designed with video requirements in mind and, as a consequence, its architecture is very inefficient when handling video traffic. It is the vision of this consortium th ...
Voir le projet

 11

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 

Future media Internet for large scale CONTent experimENTation (FI-CONTENT)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2013,

This project will transform the perception of, and possibilities for, the next generation Internet. It addresses the FI Content Usage Call in a number of innovative, practical and useful ways. With inputs from 5 important content areas, spanning future uses of AV, games, Web, metadata and user created content, demonstrating usage beyond current state of the art, we have assembled a consortium incl ...
Voir le projet

 17

 TERMINÉ 

Economics and Technologies for Inter-Carrier Services (ETICS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

ETICS aims at creating a new ecosystem of innovative QoS-enabled interconnection models between Network Service Providers allowing for a fair distribution of revenue shares among all the actors of the service delivery value-chain. To this end, we will propose and analyze new business and regulatory models for converged infrastructures, taking into account applications' QoS constraints and incentiv ...
Voir le projet

 18

 TERMINÉ 

Enriched Network-aware Video Services over Internet Overlay Networks (ENVISION)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

Future networked media applications will be multi-sourced, highly interactive distributed meshes of HD and 3D multi-sensory channels. While high-quality user-centric applications such as these offer tremendous advantages to their participants and to society at large, they present a major headache to ISPs as they demand unprecedented quantities of network resources in unpredictable locations. The t ...
Voir le projet

 7

 TERMINÉ 

Optimization of Bandwidth for IPTV video streaming (OptiBand)

Date du début: 1 janv. 2010, Date de fin: 31 oct. 2012,

IPTV provides telecommunication operators the opportunity to better serve the video market and better compete with the industry transition to HD (High Definition) and unicast video (e.g. Video on Demand), both creating challenges to the existing CATV (Cable TV) and SAT (Satellite) providers. One of the main challenges in IPTV is the line rate of the access lines, which is predominantly ADSL.OptiBa ...
Voir le projet

 15

 TERMINÉ 
Internet is going to be massively "mobile". The efficient and growing internet of services has also to take into account issues of this "mobility" as well as the mobile devices and their applications. If, at the origin, mobile internet solutions depended on the power of mobile operators, today the take-off of the iPhone and its application-platform "Appstore" upset the balance of the forces. The f ...
Voir le projet

 7

 TERMINÉ 
The main goal of the FARAMIR project is to research and develop techniques for increasing the radio environmental and spectral awareness of future wireless systems. The proposed holistic approach starts from the development of spectrum sensing hardware investigating how such functionality could be efficiently integrated to handheld devices. In the next step, we will combine measurements performed ...
Voir le projet

 10

 TERMINÉ 

eMobility NetWorld

Date du début: 1 juil. 2010, Date de fin: 31 juil. 2012,

Society is becoming confident that it can address the Grand Challenges of the 21st century: It can address global warming by taking decisive action, can invent and deploy innovative transport systems to reduce traffic problems and will be able to solve the issues associated with the ageing population. Smart applications enabled by advanced communication networks will be a centrepiece of many solu ...
Voir le projet

 10

 TERMINÉ 
CompanionAble adresses the issues of social inclusion and homecare of persons suffering from chronic cognitive disabilities prevalent among the elderly, a rapidly increasing population group. Those people need support of carers and are at risk of social exclusion, yet this problem not well addressed by ICT technology, but would lead to a social and economical pressure for staying at home as long a ...
Voir le projet

 18

 TERMINÉ 

Anticipating the Network of the Future - From Theory to Design (Euro-NF)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2012,

Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Voir le projet

 37

 TERMINÉ 

Advanced Radio Interface Technologies for 4G Systems (ARTIST4G)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The first 3GPP Long Term Evolution standard version is complete and ready to be deployed. Although it increases peak data rate and spectral efficiency compared to legacy techniques, cell-edge and average user throughputs are still significantly lower than the peak rates. In the LTE-Advanced Study Item, ways to extend LTE are being explored. However, some of the considered techniques are complex an ...
Voir le projet

 18

 TERMINÉ 

SMART-antenna multimode wireless mesh Network (SMART-Net)

Date du début: 1 mai 2008, Date de fin: 31 mai 2012,

The motivation behind SMART-Net is to overcome the limitations of conventional Broadband Wireless Access systems, in which all communications are required to pass through one costly central base station. Therefore, the project proposes a novel system architecture enabling next generation of Wireless Mesh Networks which will support new applications by the Internet, innovative service packages deli ...
Voir le projet

 6

 TERMINÉ 
The general objective of this Thematic Network (TN) is to foster and promote large-scale integration of domestic and distributed micro generation and improve energy efficiency through the implementation of innovative ICT solutions into local smart power grids.The TN will bring together key relevant players in the telecommunications and energy sector. They will overview and provide insight of exist ...
Voir le projet

 15

 TERMINÉ 
The main objective of the RESUMENET is to host original research work that will systematically embed resilience into future Internet. The project work has three main dimensions.•\tAt framework-level, work will elaborate on the D2R2+DR (Defend, Detect, Remediate, Restore; Diagnose, Refine) framework, and quantify the impact of different types of challenges and failures on normal network service ope ...
Voir le projet

 9

 TERMINÉ 

Supporting the future of the NEM European Technology Platform (FutureNEM)

Date du début: 1 nov. 2009, Date de fin: 30 nov. 2011,

The NEM European Technology Platform is well on the way to achieving the major objectives defined at the creation of the platform, five years ago. It has helped to change the environment, encouraging the emergence of a strong European awareness of the Future Media Internet issues, supporting the creation of various forums concerned with that topic, and leading the development of a possible PPP on ...
Voir le projet

 10

 TERMINÉ 

Expanding the European Future Internet Community (EX-FI)

Date du début: 1 mai 2010, Date de fin: 31 juil. 2011,

In order to used the funding for R&D activities on Future Internet in an efficient way and to ensure that reasonable results will correspond to the investments, it is necessary to establish tight and coordinated partnership among all relevant European stakeholder in the sector. To realise it, the European Future Internet Initiative is ready to involve the stakeholders into discussions on definitio ...
Voir le projet

 7

 TERMINÉ 

Worldwide Observatory of Malicious Behaviors and Attack Threats (WOMBAT)

Date du début: 1 janv. 2008, Date de fin: 30 avr. 2011,

Description The aim of WOMBAT is to provide new means to understand the existing and emerging threats that are targeting the Internet economy and the net citizens.Why Research in Emerging Security Threats?Today, combating cyber-crime becomes harder and harder. This is acknowledged by several recent articles from major anti-virus companies ...
Voir le projet

 10

 TERMINÉ 
POF-PLUS will develop new components, modify fibre assemblies and optimise transmission techniques to enable high speed (multiple Gbps) optical links based on standard large-core Plastic Optical Fibre (POF) which will take full advantage of the intrinsic low cost and extreme ease of installation of POF based systems to aid both wired and wireless service delivery to end users in next generation ne ...
Voir le projet

 9

 TERMINÉ 

Network-Aware P2P-TV Application over Wise Networks (NAPA-WINE)

Date du début: 1 févr. 2008, Date de fin: 30 avr. 2011,

In the next few years we will assist to the explosion of the market of high quality video distribution over Internet (IPTV). The massive deployment of IPTV platforms will offer the opportunity to change the paradigm of current TV broadcasting, moving from the nowadays mass TV, toward personalized TV, thanks to the creation of a large number of thematic channels. IPTV services can be provided eithe ...
Voir le projet

 11

 TERMINÉ 

Home Gigabit Access (Omega)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2011,

Gigabit Home Access Networks are a pivotal technology to be developed if the EU Vision of the Future Internet is to be realised. Consumers will require such HANs to be simple to install, without any new wires, and easy enough to use so that information services running on the HAN will be just another utility, as, for instance, electricity, water and gas are today. The OMEGA HAN is centred round th ...
Voir le projet

 24

 TERMINÉ 

Architectures for fLexible Photonic Home and Access networks (ALPHA)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2011,

The ALPHA project addresses the challenges of building the future access and all types of in-building networks for home and office environments. The proposal supports the evolution towards a cognitive network by dynamically utilising the resources of an optical network infrastructure to support a heterogeneous environment of wired and wireless technologies.The project investigates innovative archi ...
Voir le projet

 17

 TERMINÉ 

Pan-European Laboratory Infrastructure Implementation (PII)

Date du début: 1 juin 2008, Date de fin: 31 mars 2011,

PII addresses the need for large-scale testing facilities in the communications area by implementing an infrastructure for federating testbeds. The central objective of PII is to create a testbed federation among regional innovation clusters in Europe. This will enable companies participating in these clusters to test new communication services and applications across Europe. The testbed federatio ...
Voir le projet

 22

 TERMINÉ 

Scalable Advanced Ring-based passive Dense Access Network Architecture (SARDANA)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Scalable Advanced Ring-based passive Dense Access Network ArchitectureMain ObjectivesThe intensive use of optical transparency and the latest opto-electronic technologies enables to expand the PON performances and functionality while minimizing the infrastructure requirements at both urban and rural areas Fibre-to-the-Home net ...
Voir le projet

 9

 TERMINÉ 

Computational Learning in Adaptive Systems for Spoken Conversation (CLASSiC)

Date du début: 1 mars 2008, Date de fin: 28 févr. 2011,

Significant advances in human-computer interaction will require systems which can exhibit truly cognitive behaviour. This is particularly so in spoken dialogue systems (SDS) where, despite wide deployment and significant investment, current systems are still limited in capability and fragile to changes in environment or application. Recent advances in statistical modelling and machine learning off ...
Voir le projet

 6

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53