Rechercher des projets européens

9 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Objective Control for TAlker VErification (OCTAVE)

Date du début: 1 juin 2015, Date de fin: 31 mai 2017,

Industry needs alternatives to textual passwords for access control. While tokens can still be stolen or transferred to other persons, biometrics technology can provide reliable, cost-effective and user-friendly solutions.The proliferation of smart services calls for unsupervised authentication at a distance. Being natural, non-intrusive and readily compatible with smart and mobile devices, automa ...
Voir le projet

 13

 TERMINÉ 
The ubiquity of Internet access, and the wide variety of Internet-enabled devices and applications, have made the Internet a principal pillar of the Information Society. Decentralized and diverse, the Internet is resilient and universal. However, its distributed nature leads to operational brittleness and difficulty in identifying and tracking the root causes of performance and availability issues ...
Voir le projet

 17

 TERMINÉ 

Certification infrastrUcture for MUlti-Layer cloUd Services (CUMULUS)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

Cloud technology offers a powerful approach to the provision of infrastructure, platform and software services without incurring the considerable costs of owning, operating and maintaining the computational infrastructures required for this purpose.Despite its appeal from a cost perspective, cloud technology still raises concerns regarding the security, privacy, governance and compliance of the da ...
Voir le projet

 8

 TERMINÉ 

Energy Distribution Infrastructure for Ssl Operative Networks (EDISON)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2014,

The EDISON Pilot Actions aim to demonstrate, under real operational conditions, that a smart lighting system improves energy efficiency, reduces CO2 emissions and encourages the use of small-scale renewable energy sources in European public buildings (e. g. schools, museums, administrative offices, hospitals, etc.). The Pilot Actions are based on the use of Solid State Lamps (SSLs) combined with ...
Voir le projet

 14

 TERMINÉ 

Accessible Personalised Services In PDTS for all (APSIS4all)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2014,

Description The objective of APSIS4all is to overcome the existing accessibility barriers faced by disabled people, older people and people who are not familiar with ICT when interacting with Public Digital Terminals (PDTs), such as Automated Teller Machines (ATMs) and Ticket Vending Machines (TVMs). APSIS4all will increase user satisfaction ...
Voir le projet

 12

 TERMINÉ 

Advanced Security Service cERTificate for SOA (ASSERT4SOA)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The term "certification" has several different meanings in ICT. Software practitioners can earn a certificate for expertise in a certain hardware or software technology. The maturity of crucial IT processes, such as software development, can be and is often certified. Even individual software systems can be certified as having particular non-functional properties, including safety, security or pri ...
Voir le projet

 7

 TERMINÉ 
"SafeTRIP project’s general objective is to improve the use of road transport infrastructures and to improve the alert chain (information / prevention / intervention) in case of incidents by offering an integrated system from data collection to transport safety service provision. SafeTRIP directly contributes to the achievement of the EC objectives regarding road transport safety, road mortality r ...
Voir le projet

 21

 TERMINÉ 

Advanced Training Environment for Crisis Scenarios (PANDORA)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2012,

"Crisis management is a major issue to prevent emergency situations from turning into disasters. In last years a not correct management of emergencies often created critical situations. In the happening of a catastrophic event, it is human behaviour-- and often human behaviour alone--that determines the speed and efficacy of the crisis management efforts. Frequently speed and efficacy do not stem ...
Voir le projet

 9

 TERMINÉ 

Building the Future Optical Network in Europe: The e-Photon/ONe Network (BONE)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

Description Building the Future Optical NetworkMain ObjectivesThe BONE-network brings together 49 laboratories and research institutes from al over Europe in a close networking infrastructure, built on the foundations laid down by the FP6 ePhoton/ONe Network and represents the research activities within Europe in the field of Optical Netw ...
Voir le projet

 53