Rechercher des projets européens

25 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
"Background: A significant proportion of pre-diabetics, show macro and micro vascular complications associated with hyperglycaemia. Although many trials have demonstrated the efficacy of lifestyle and pharmaceutical interventions in diabetes prevention, no trial has evaluated the extent to which mid- and long-term complications can be prevented by early interventions on hyperglycaemia.Aims: To ass ...
Voir le projet

 37

 TERMINÉ 

Dependable Embedded Wireless Infrastructure (DEWI)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Voir le projet

 61

 TERMINÉ 
NIWE project will demonstrate a new production process able to decrease the embodied energy of the foundry products by over 25%, reducing drastically its carbon footprint. The demonstration will be performed in the aluminium, iron and steel sectors.The expected energy efficiency gains are due to a new furnace that, by means of a power transmission system based on induction, will allow a highly fle ...
Voir le projet

 10

 TERMINÉ 
The TRADEIT project is a multidisciplinary, multi-sectorial collaborative project supporting a Network of Traditional Food SMEs and Food Researchers in the areas of Collaboration, Innovation, Entrepreneurship, Knowledge and Technology Transfer to increase the competitiveness and inter-regional advantage of Traditional Food Producing SMEs. This will be achieved through focused regional coordination ...
Voir le projet

 20

 TERMINÉ 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Voir le projet

 96

 TERMINÉ 

Sustainable Organic and Low-input Dairying (SOLID) (SOLID)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2016,

"Organic and low-input dairy farming systems are increasingly noted as delivering multifunctional benefits to the agricultural industry and society but technical and economic constraints prevent widespread adoption. SOLID will deliver an innovative toolbox of novel methodologies that will contribute to the competitiveness of the dairy industry and increase the effectiveness with which these benefi ...
Voir le projet

 26

 TERMINÉ 

Operationalising Psychosocial Support in Crisis (OPSIC)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2016,

Complex emergencies such as earthquakes, flooding, bombings, and the recent massacre in Utøya (Norway) can seriously affect entire populations and rip nations apart, with long-term psychosocial consequences impacting the most vulnerable as well as the helpers for years following the disaster.A large number of high quality European guidelines and tools for psychosocial support interventions in cris ...
Voir le projet

 11

 TERMINÉ 
Green eMotion aims at enabling mass deployment of electromobility in Europe. To achieve this, major players from industry, the energy sector, municipalities as well as universities and research institutions have joined forces to develop and demonstrate a commonly accepted and user-friendly framework consisting of interoperable and scalable technical solutions in connection with a sustainable busin ...
Voir le projet

 44

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Trans-national cooperation among ICT NCPs (Idealist2014)

Date du début: 1 oct. 2011, Date de fin: 31 déc. 2014,

The main objective of Idealist2014 is reinforcing the network of National Contact Points (NCP) for ICT under FP7, by promoting further trans-national cooperation within this network. This cooperation will not be reduced to only ICT NCPs but also a degree of collaboration and networking with similar networks in parallel themes (Security, SSH, ENV, Transport, Energy, Health,...etc) especially in the ...
Voir le projet

 25

 TERMINÉ 
T-TRANS project aims at providing information on innovation mechanisms for the Intelligent Transportation Systems domain, encouraging and facilitating an accelerated market deployment of related innovative products and services. A deep analysis of the current activity in Intelligent Transportation Systems shows an increasing importance of this transport research and application domain to support m ...
Voir le projet

 9

 TERMINÉ 
Description The main goal of the universAAL project is to make it easier for the ICT industry in Europe to develop and successfully deploy AAL solutions. To achieve this, the project is developing an open standardized platform/specification on which the AAL service providers can quickly and cheaply build AAL services. The project also assist ...
Voir le projet

 21

 TERMINÉ 

OPEN INNOVATION Mechanisms in Smart Cities (Open Cities)

Date du début: 1 nov. 2010, Date de fin: 31 déc. 2013,

The success of cities is linked to their efficiency, in reducing transaction costs and providing services. However, in order to maintain this success, cities have reinvented themselves many times through history.Today, Information Technologies are doomed to be the key driver of a new wave of innovation in cities that will lead, one more time, to their reinvention.However, public procurement and ma ...
Voir le projet

 15

 TERMINÉ 

Cost-Effective Solar AiR conditioning (CESAR)

Date du début: 1 déc. 2011, Date de fin: 30 nov. 2013,

"Summer electricity use is growing year upon year, mainly due to air conditioning (AC) demand. Electricity grids are increasingly experiencing problems during the hottest summer days, to deal with the increasing demand of electricity from air conditioning systems.Absorption cooling can be a solution to this growing problem, as it can supply cooling from a heating source, with only a very small ele ...
Voir le projet

 7

 TERMINÉ 
Assembly of transient and stable signaling platforms in the plasma membrane of cells has been implicated in functions as varied as death and survival, polarity, differentiation, migration, cell-cell communication, virus entry, exocytosis, endocytosis. Naturally, the assembly of signaling microdomains requires the use of most complex molecular mechanisms capable of transducing intrinsic or extrinsi ...
Voir le projet

 1

 TERMINÉ 

European Union - Latin American Research and Innovation NETworks (EULARINET)

Date du début: 1 mars 2008, Date de fin: 31 déc. 2012,

"EULARINET (Co-ordinating Latin America Research and Innovation NETworks) goal is to strengthen bi-regional dialogue on S&T between EU Member States (MS) and Latin American Partner Countries (LAPC) at policy, programme and institutional (research entities) level, thus contributing to a three fold objective: a) promote the joint identification, setting up, implementation and monitoring of mutual in ...
Voir le projet

 20

 TERMINÉ 

ANDALUSIAN RESEARCHERS´NIGHT 2012 (ANDARES)

Date du début: 1 mai 2012, Date de fin: 30 nov. 2012,

"As part of the Innovation policy of Andalusian Region, Fundación Descubre (www.fundaciondescubre.es) with the University of Almeria, University of Cordoba, University of Granada, University of Huelva, University of Malaga, Pablo de Olavide University, University of Seville, Jaen University and National Research Council (CSIC), the Association of Promoters and Producers of Renewable Energy and th ...
Voir le projet

 11

 TERMINÉ 

Magnetic Scaffolds for in vivo Tissue Engineering (MAGISTER)

Date du début: 1 déc. 2008, Date de fin: 30 nov. 2012,

The main driving idea of the project is the creation of conceptually new type of scaffolds able to be manipulated in situ by means of magnetic forces. This approach is expected to generate scaffolds with such characteristics as multiple use and possibly multipurpose delivery in order to repair large bone defects and ostheocondral lesions in the articular surface of the skeletal system. The major ...
Voir le projet

 21

 TERMINÉ 
Dendrimers are new materials obtained with a highly controlled molecular structure in several space orientations. Liquid Crystals (LC) Dendrimers are a part of them that incorporate directional properties to these materials. If we append active molecules into these engineered molecules, we can obtain multifunctional anisotropic molecules that open the possibility of achieving a wide variety of phy ...
Voir le projet

 10

 TERMINÉ 

Actinide reCycling by SEParation and Transmutation (ACSEPT)

Date du début: 1 mars 2008, Date de fin: 30 sept. 2012,

"Actinide recycling by separation and transmutation is considered worldwide and particularly in several European countries as one of the most promising strategies to reduce the inventory of radioactive waste, thus contributing to make nuclear energy sustainable. Consistently with potentially viable recycling strategies, the Collaborative Project ACSEPT will provide a structured R&D framework to de ...
Voir le projet

 35

 TERMINÉ 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Voir le projet

 21

 TERMINÉ 
MyOcean is THE PROJECT to set up infrastructures, services and resources to prepare the operational deployment of first Marine Core Services. My Ocean answers to the topic SPA.2007.1.1.01 - development of upgraded capabilities for existing GMES fast-track services and related (pre)operational services. MyOcean is proposed by a consortium of 67 partners spread in maritime countries: - federated aro ...
Voir le projet

 60

 TERMINÉ 
The co-operative Metafight project will perform functional studies to understand the dissemination and outgrowth of metastasis through systematic analysis of the Core Invasive Machinery contained within integrin-mediated ECM attachment structure. It includes a large and discretely localised intracellular signalling network which drives migration and invasion. Our strategy is based on the hypothesi ...
Voir le projet

 10

 TERMINÉ 

Deployment of Remote Instrumentation Infrastructure (DORII)

Date du début: 1 févr. 2008, Date de fin: 31 juil. 2010,

The DORII project aims to deploy e-Infrastructure for new scientific communities, where on the one hand the ICT technology is still not present at the appropriate level, but on the other hand it is demanded to empower its daily work. We deal with a group of scientific users, and this is a reference for DORII, with experimental equipment and instrumentation that are not integrated or integrated onl ...
Voir le projet

 13

 TERMINÉ 

Security of critical infrastructures related to mass transportation (DEMASST)

Date du début: 12 janv. 2009, Date de fin: 11 mai 2010,

"To develop adequate and well accepted security for mass transportation in Europe and the citizens affected by it, is a formidable task. The malicious threats, particularly those posed by terrorists, require a comprehensive approach: if security improvements are patchy, perpetrators are likely to find the loopholes left. With their open access points and interconnections, surface mass transportati ...
Voir le projet

 13