Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
... and evaluating complex configurations in a cyber-physical systems manner is available. The lack of system validation approaches for Smart Grids is especially addressed by ERIGrid. By providing a Pan-European research infrastructure ERIGrid supports the technology development as well as the roll out of Smart Grid solutions and concepts in Europe. It tackles a holistic, cyber-physical systems based ...
Voir le projet

 19

 TERMINÉ 

ACTRIS PPP - Aerosols, Clouds and Trace gases Preparatory Phase Project (ACTRIS PPP)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The Research Infrastructure (RI) ACTRIS – Aerosols, Clouds and Trace Gases - is the pan-European RI that consolidates activities amongst European partners for observations of aerosols, clouds, and trace gases and for understanding of the related atmospheric processes, to provide RI services to wide user groups. ACTRIS is composed of 8 connected elements: distributed National Facilities (observatio ...
Voir le projet

 28

 TERMINÉ 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Voir le projet

 25

 TERMINÉ 

European Circular Energy-Frontier Collider Study (EuroCirCol)

Date du début: 1 juin 2015, Date de fin: 31 mai 2019,

...o reinforce its pole position throughout the 21st century, Europe must be ready to propose an ambitious post-LHC accelerator project by 2018/19. This is one of the main recommendations of the updated European Strategy for Particle Physics, adopted by the CERN Council in May 2013.The EuroCirCol conceptual design study is a direct response to this recommendation, initiating a study for a 100 TeV ene ...
Voir le projet

 17

 TERMINÉ 

Aerosols, Clouds, and Trace gases Research InfraStructure (ACTRIS-2)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

ACTRIS-2 addresses the scope of integrating state-of-the-art European ground-based stations for long term observations of aerosols, clouds and short lived gases capitalizing work of FP7-ACTRIS. ACTRIS-2 aims to achieve the construction of a user-oriented RI, unique in the EU-RI landscape. ACTRIS-2 provides 4-D integrated high-quality data from near-surface to high altitude (vertical profiles and t ...
Voir le projet

 32

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA-2020)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

..., neutrinos, and physics beyond the Standard Model. Major developments in detector technology are required to ensure the success of these endeavours. The AIDA-2020 project brings together the leading European infrastructures in detector development and a number of academic institutes, thus assembling the necessary expertise for the ambitious programme of work. In total, 19 countries and CERN are i ...
Voir le projet

 38

 TERMINÉ 
In Europe, there is a clear long-term objective to decarbonize the energy system, but it is very unclear how this will be achieved in the heating and cooling sector. As a result, there is currently a lot of uncertainty among policymakers and investors in the heating and cooling sector, primarily due to a lack of knowledge about the long-term changes that will occur in the coming decades. This HRE ...
Voir le projet

 16

 TERMINÉ 

New Cost Efficient Business Models for Flexible Smart Grids (NOBEL GRID)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Voir le projet

 24

 TERMINÉ 
...nd resilience through local innovation hubs and horizontal networking. Need and added value for Danube Region Strategy The proposed action will focus on Danube riparian countries as major European feedstock pivots. Stakeholders along the non-food-biomass-to-energy value chains will benefit from extensive networking and capacity enhancing, but also from specific modelling tools that will streamline ...
Voir le projet

 6

 TERMINÉ 

EUDAT2020

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

...tion, access and sharing should be supported in a much better way. Data, and a fortiori Big Data, is a cross-cutting issue touching all research infrastructures. EUDAT2020’s vision is to enable European researchers and practitioners from any research discipline to preserve, find, access, and process data in a trusted environment, as part of a Collaborative Data Infrastructure (CDI) conceived as a ...
Voir le projet

 36

 TERMINÉ 
...ns of thermal energy storage and/or hybridization, e.g. with biomass. However, significant research efforts are needed to achieve this goal. This Integrated Research Programme (IRP) engages all major European research institutes, with relevant and recognized activities on STE and related technologies, in an integrated research structure to successfully accomplish the following general objectives: ...
Voir le projet

 42

 TERMINÉ 
The important climatic, environmental, socio-economic and land-use changes taking place at global, regional and local levels, pose new challenges for meeting the multifunctional demands on European forest resources, and for their sustainable management. In the European Union the formulation of forest policies is in the competence of the Member States and although the Treaties of the EU make no pro ...
Voir le projet

 24

 TERMINÉ 
...enewable energy systems, including photovoltaics. With lower cost of solar electricity, PV could significantly contribute to the achievements of the 20-20-20 objectives.The Joint Program on PV of the European Energy Research Alliance (EERA-PV) aims to increase the effectiveness and efficiency of PV R&D through alignment and joint programming of R&D of its member institutes, and to contribute to th ...
Voir le projet

 37

 TERMINÉ 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Voir le projet

 23

 TERMINÉ 

solving CHAllenges in Nuclear DAta (CHANDA)

Date du début: 1 déc. 2013, Date de fin: 30 nov. 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Voir le projet

 35

 TERMINÉ 

Materials’ Innovations for a Safe and Sustainable nuclear in Europe (MATISSE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Voir le projet

 32

 TERMINÉ 
"With this proposal, a qualified and assorted representative group of the European Materials community, intend to propose an activity for further boosting and reinforcing a concept launched by Alliance for Materials (A4M): the creation of a strong, sustainable, inclusive network where any European Materials players (from Industry, Research, University) could feel comfortable and can gain real val ...
Voir le projet

 20

 TERMINÉ 
The INNOVER-EAST project targets five countries of the Eastern Partnership (in short, EPCs: Armenia, Azerbaijan, Belarus, Georgia and Ukraine) to overcome the bottlenecks of innovation and intensify the level of cooperation between research and business in the target countries. The project aims, on the one hand, to develop new skills and competences in innovation services at relevant organisations ...
Voir le projet

 15

 TERMINÉ 

Code for European Severe Accident Management (CESAM)

Date du début: 1 avr. 2013, Date de fin: 31 mars 2017,

...and the development or improvement of adequate severe accident management measures is essential in order to further increase the safety of the nuclear power plants operated in Europe. CESAM (Code for European Severe Accident Management) is a R&D project that aims in particular at the improvement of the European reference code ASTEC towards a usage in severe accident management analysis for nuclear ...
Voir le projet

 21

 TERMINÉ 
The main aim of this project is to support the sustainable delivery of non-food biomass feedstock at local, regional and pan European level through developing strategies, and roadmaps that will be informed by a “computerized and easy to use” toolset (and respective databases) with update harmonized datasets at local, regional, national and pan European level for EU27, western Balkans, Turkey and U ...
Voir le projet

 34

 TERMINÉ 
EU-SOLARIS aims to create a new legal entity to explore and implement new and improved rules and procedures for reserach infrastructures (RI) for Solar Thermal Electricity (STE) technology, in order to optimise RI development and RTD coordination. According to what was communicated by ESFRI, EU-SOLARIS is expected to be the first of its kind, where Industrial needs and private funding will play a ...
Voir le projet

 15

 TERMINÉ 
Background The BIOGASTIL project targets the problem of increasing greenhouse gas (GHG) emissions together with the low resource efficiency of industrial processes, particularly in biomethanisation. The lack of developed techniques that fully exploit the advantages that biomethanisation processes are able to have on the environment is evident. The AlcoBio ...
Voir le projet

 3

 TERMINÉ 
In order to promote the widespread adoption of electric vehicles (EV) in Europe and to reduce the different regulatory, commercial or political barriers, it is imperative that EVs, Charging Points (CPs) and all kind of systems needed to allow the charging and other additional services are compatible to some extent.EVs emerge as a great challenge for the grid infrastructure. During the last years m ...
Voir le projet

 11

 TERMINÉ 
...icapped by its fragmentation, its limited means, and occasional outdating and isolation. In addition, the low benefits that Mediterranean forests provide to forest-based industries--compared to other European forests--make it difficult to attract interest and funds from the private sector. For this reason, new ways to overcome this situation must be implemented through research partnerships, netwo ...
Voir le projet

 18

 TERMINÉ 

FP7 High Luminosity Large Hadron Collider Design Study (HILUMI LHC)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2015,

...09, gathering a global user community of 7,000 scientists. It will remain the most powerful accelerator in the world for at least two decades, and its full exploitation is the highest priority in the European Strategy for Particle Physics, adopted by the CERN Council and integrated into the ESFRI Roadmap. To extend its discovery potential, the LHC will need a major upgrade around 2020 to increase ...
Voir le projet

 16

 TERMINÉ 

Aerosols, Clouds, and Trace gases Research Infrastructure Network (ACTRIS)

Date du début: 1 avr. 2011, Date de fin: 31 mars 2015,

...h infrastructure for these observations is presently lacking. ACTRIS (Aerosols, Clouds and Trace gases Research InfraStructure Network) aims to fill this observational gap through the coordination of European ground-based network of stations equipped with advanced atmospheric probing instrumentation for aerosols, clouds and short-lived trace gases.ACTRIS is a coordinated network that contributes t ...
Voir le projet

 29

 TERMINÉ 

Advanced European Infrastructures for Detectors at Accelerators (AIDA)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

...tures in Europe, developing advanced detector technologies for future particle accelerators, as well as transnational access to facilities that provide these research infrastructures.In line with the European Strategy for Particle Physics, AIDA targets the infrastructures needed for R&D, prototyping and qualification of detector systems for the major particle physics experiments currently being pl ...
Voir le projet

 39

 TERMINÉ 

PhotoVoltaic European Research Infrastructure (SOPHIA)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

... but precompetitive issues. Large research infrastructures working together will avoid the useless replication of a large number of small efforts. The SOPHIA project aims at pulling together the main European photovoltaic research infrastructures in order to provide the scientific community with common referential to conduct efficient and coordinated research work in the field of PV technologies.
Voir le projet

 22

 TERMINÉ 
...ilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transition to a sustainable pan-European e-Infrastructure started in EGEE-III. It will sustain support for Grids of high-performance and high-throughput computing resources, while seeking to integrate new Distributed Computing Infra ...
Voir le projet

 143

 TERMINÉ 

MATerials TEsting and Rules (MATTER)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Voir le projet

 30

 TERMINÉ 

European Nuclear Science and Applications Research (ENSAR)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2014,

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative ...
Voir le projet

 32

 TERMINÉ 
Sun, water and biomass are a natural capital of the Alpine Space. It is a must to use them for the production of energy. Besides intelligent grids, storage systems will be key enablers for a future mostly renewable energy supply.Electric vehicles (EV) will be integral elements of the future energy system. Their batteries can be charged with excessive power from intermittent energy sources and elec ...
Voir le projet

 19

 TERMINÉ 

Alpine space In Movement, targeted to water & energy capitalization (AIM)

Date du début: 30 sept. 2013, Date de fin: 30 déc. 2014,

The project Alpine space In Movement (AIM) aims at becoming a “megaphone” of the Alpine Space Programme (ASP) projects active in the field of water & renewable energy. AIM will capitalise on the achievements of the numerous ASP projects dedicated to the promotion of energy production from renewables and on the optimization of water resource exploitation. The importance of the issue was highlighted ...
Voir le projet

 4

 TERMINÉ 
The OrientGate project will foster concerted and coordinated climate adaptation actions across the SEE region. The project will explore climate risks faced by coastal, rural and urban communities; contribute to a better understanding of the impact of climate variability and change on water regimes, forests and agro-ecosystems; and analyse specific adaptation needs in the hydroelectricity, agro-ali ...
Voir le projet

 34

 TERMINÉ 
...rove policies in that field and to support the transnational transfer of selected good practices towards more regions.The partnership consists of regional authorities and development agencies from 20 European regions cooperating in policy development and implementation and operation of revolving financial support instruments and related services. They will be supported by scientific institutes car ...
Voir le projet

 26

 TERMINÉ 
The essence of the project is to provide a special purpose structure for training and qualification of personnel for serving VVER technology as one of nuclear power options used in EU. Such approach should allow unifying existing VVER related training schemes according to IAEA standards and commonly accepted criteria recognized in EU. The structure is based on three general pillars: 1) Training sc ...
Voir le projet

 12

 TERMINÉ 
Emissions from fossil fuels are the largest contributor to the anthropogenic greenhouse effect, so a reduction in fossil-energy use is a clear priority for the environment. Yet, because some emissions will be unavoidable, a responsible strategy also means actively withdrawing carbon dioxide from the atmosphere. Such carbon sequestration faces multi-faceted challenges: the net withdrawal of carbon ...
Voir le projet

 8

 TERMINÉ 
"Now and in the foreseeable future, action on climate mitigation and adaptation doesn’t seem to be sufficient to manage greenhouse gases and their impact at the scale required to achieve stringent objectives such as those compatible with the 2°C target. This project aims at carrying out a rigorous assessment of what a stringent climate policy entails, and what is needed to overcome major impedimen ...
Voir le projet

 10

 TERMINÉ 
...derground observatory to search for rare events and study terrestrial and astrophysical neutrinos. The Astroparticle Roadmap of ApPEC/ASPERA strongly supports this, recommending that: “a new large European infrastructure of 100'000-500'000 ton for proton decay and low-energy neutrinos be evaluated as a common design study together with the underground infrastructure and eventual detection of acce ...
Voir le projet

 39

 TERMINÉ 

Green Intermodal Freight Transport (GIFT)

Date du début: 29 févr. 2012, Date de fin: 30 août 2014,

...sses, assets, ICT, legislation, norms and harmonization/ standardization issues, in order to promote innovative green intermodal freight transport corridors. GIFT project will drill down in three Pan-European Transport Corridors, namely IV, V and VII that cover almost the entire SEE region. These corridors have been selected, since: -They connect ports to landlocked countries via road and rail inf ...
Voir le projet

 27