Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
To handle the unprecedented demand for mobile data traffic, different vendors, operators and research programmes have aimed to develop radio access technologies (RATs) that boost physical-layer link capacity, utilize millimeter wave radio, or further densify network topology. Notable steps have also been made towards shifting baseband processing from the (currently) ultra dense network edge to a c ...
Voir le projet

 10

 TERMINÉ 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Voir le projet

 14

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

The goal of the 5G Exchange (5GEx) project is to enable cross-domain orchestration of services over multiple administrations or over multi-domain single administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different co ...
Voir le projet

 20

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Large-scale RINA benchmark on FIRE (ARCFIRE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

ARCFIRE will bring RINA from labs into the real-world. RINA, the Recursive InterNetwork Architecture, is an innovative “back-to-basics” network architecture that solves current limitations and facilitates full integration between distributed computing and networking. RINA addresses the challenges that drive the communications industry in moving from dedicated hardware to almost completely virtuali ...
Voir le projet

 8

 TERMINÉ 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Voir le projet

 16

 TERMINÉ 

Training network on tRAcking in compleX sensor systems (TRAX)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

...mplex Sensor Systems, covering interdisciplinary and intersectoral aspects in this newly emerging supra-disciplinary field. The TRAX consortium comprises two large companies (Thales Nederland B.V., Ericsson A.B.); two SMEs (Rinicom Limited, Xsens Technologies B.V.); a research institute ( Fraunhofer) and three universities (University of Lancaster, Linköping University and University of Twente); a ...
Voir le projet

 8

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 
...bile broadband services for mobile users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Univer ...
Voir le projet

 19

 TERMINÉ 

Scaffolding Scalable Software Services (S-CASE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The goal of S-CASE is to accelerate the software development lifecycle for cloud services by introducing a new agile prototyping paradigm that automates the process of mapping user requirements to concrete software specifications and generates operational code (RESTful services). S-CASE aspires to support software developers in identifying software requirements and business processes in various fo ...
Voir le projet

 9

 TERMINÉ 

A BLUEPRINT of Haematopoietic Epigenomes (BLUEPRINT)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

In response to the call for a high impact initiative on the human epigenome, the BLUEPRINT Consortium has been formed with the aim of generating at least 100 reference epigenomes and studying them to advance and exploit knowledge of the underlying biological processes and mechanisms in health and disease. BLUEPRINT will focus on distinct types of haematopoietic cells from healthy individuals and o ...
Voir le projet

 45

 TERMINÉ 

COnvergence of fixed and Mobile BrOadband access/aggregation networks (COMBO)

Date du début: 1 janv. 2013, Date de fin: 30 sept. 2016,

Fixed and mobile networks have been subjects to significant technological and architectural evolutions in the past years, with e.g. deployments of 4G mobile networks and FTTH fixed networks, as well as significant increase in traffic demand and access bandwidth both in fixed and mobile access networks. All these network evolutions lead to enormous investments in independent network infrastructures ...
Voir le projet

 20

 TERMINÉ 

Adressing Energy in Parallel Technologies (ADEPT)

Date du début: 1 sept. 2013, Date de fin: 31 août 2016,

The ADEPT project will address the challenge of energy-efficient use of parallel technologies. ADEPT will build on the expertise of software developers from high-performance computing (HPC) to exploit parallelism for performance, and on the expertise of Embedded systems engineers in managing energy usage. ADEPT will develop a tool that will guide software developers and help them to model and pred ...
Voir le projet

 5

 TERMINÉ 

Programmability In RINA for European supremacy of virTualised NEtworks (PRISTINE)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2016,

The Internet as the global communications infrastructure has been successful in shaping the modern world by the way we access and exchange information. The Internet architecture designed in the 1960's has been supporting a variety of applications and offering a number of services till now but emerging applications demand better quality, programmability, resilience and protection. Any alterations t ...
Voir le projet

 16

 TERMINÉ 
ASTRON aims at the development of high-capacity, energy-efficient and bit-rate flexible optical transceivers capable of supporting rates from 10Gb/s to beyond 1Tb/s. The ASTRON concept is based on developing multi-functional and agile devices so as to achieve Terabit capacities on a single photonic integrated chip. ASTRON's transceiver can realize different techniques of flexible super-channel ge ...
Voir le projet

 14

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 janv. 2012, Date de fin: 29 févr. 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Voir le projet

 14

 TERMINÉ 
The COCONUT proposal aims at the definition, study and realization of a new fully scalable optical access network significantly extending the network dimensions in terms of bandwidth utilization, reach and number of accommodated users. The envisioned access network evolves from the almost-commercial WDM-PON architecture to the realisation of the Ultra-Dense WDM solutions, opening the way to the "w ...
Voir le projet

 8

 TERMINÉ 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Voir le projet

 16

 TERMINÉ 

Future INternEt Smart Utility ServiCEs (Finesce)

Date du début: 1 mars 2013, Date de fin: 30 sept. 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Voir le projet

 34

 TERMINÉ 

A High-Level Paradigm for Reliable Large-scale Server Software (RELEASE)

Date du début: 1 oct. 2011, Date de fin: 28 févr. 2015,

The exponential growth in the number of cores requires radically new software development technologies. Many expect 100,000-core platforms to become commonplace, and the best predictions are that core failures on such an architecture will be common, perhaps one an hour. Hence we require programming models that are not only highly scalable but also reliable. The project aim is to scale the radic ...
Voir le projet

 8

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 
The INFINITY Support Action will have a positive impact on the success of the FI-PPP programme. Through collaboration with organisations across Europe, INFINITY will capture and communicate information about available infrastructures and any interoperability requirements and issues. INFINITY will document any usage-related operational constraints and seek to identify and foster federation opportun ...
Voir le projet

 14

 TERMINÉ 

Building the PaaS Cloud of the Future (4CaaST)

Date du début: 1 juin 2010, Date de fin: 31 août 2013,

To survive in today's economy; short time-to-market and efficiency are paramount for the creation of innovative products and to survive in the current economic climate. This is especially true for IT services which will dominate the way people work and live in the future.Cloud computing is essentially changing the way services are built, provided and consumed. Despite simple access to Clouds, buil ...
Voir le projet

 18

 TERMINÉ 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Voir le projet

 27

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 
The goal of OUTSMART is to contribute to the Future Internet (FI) by aiming at the development of five innovation eco-systems. These eco-systems facilitate the creation of a large variety of pilot services and technologies that contribute to optimised supply and access to services and resources in urban areas. This will contribute to more sustainable utility provision and, through increased effici ...
Voir le projet

 29

 TERMINÉ 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Voir le projet

 30

 TERMINÉ 

EXpAnding LTE for Devices (EXALTED)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

The number of networked humans will reach saturation by the middle of the next decade, while the number of networked devices will continue to increase dramatically for some time to come. The Wireless World Research Forum (WWRF) has set out a vision of the future where 7 trillion wireless devices will be serving 7 billion people by 2017. The vast majority of wireless traffic will be between machine ...
Voir le projet

 16

 TERMINÉ 

SAIL: Scalable & Adaptive Internet soLutions (SAIL)

Date du début: 1 août 2010, Date de fin: 28 févr. 2013,

SAIL's objective is the research and development of novel networking technologies using proof-of-concept prototypes to lead the way from current networks to the Network of the Future.SAIL leverages state of the art architectures and technologies, extends them as needed, and integrates them using experimentally-driven research, producing interoperable prototypes to demonstrate utility for a set of ...
Voir le projet

 26

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

Internet of Things Initiative (IoT-i)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2012,

Internet of Things (IoT) is one of the most important areas of a Future Internet with significant potential to positively impact European economy and society. The current IoT research community is however highly fragmented, featuring diverging approaches and technologies. This inevitably leads to a lack of coherency that hinders the realisation of an interoperable IoT, preventing the IoT to achiev ...
Voir le projet

 17

 TERMINÉ 
The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10 Mbps while the capacity required only for watching one channel of HDTV is 20 Mbps.Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 mill ...
Voir le projet

 13

 TERMINÉ 

Quantitative Assessment of Secondary Spectrum Access (QUASAR)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The need for the radio spectrum for the rapidly growing broadband access services is evident. Abundant and fast access to spectrum has three main advantages: it fosters rapid innovation in wireless systems and services lowering entry barrier on the market; it enables affordable mobile broadband access to all; and makes new energy efficient wireless systems possible. Secondary use of already lice ...
Voir le projet

 11

 TERMINÉ 
The general objective of this Thematic Network (TN) is to foster and promote large-scale integration of domestic and distributed micro generation and improve energy efficiency through the implementation of innovative ICT solutions into local smart power grids.The TN will bring together key relevant players in the telecommunications and energy sector. They will overview and provide insight of exist ...
Voir le projet

 15

 TERMINÉ 

Property-based Testing (ProTest)

Date du début: 1 mai 2008, Date de fin: 31 déc. 2011,

...s are required, what properties will need to be checked and strategies to maximise industrial impact. The initial implementation vehicle will be Erlang/OTP (Open Telecom Platform) developed by Ericsson in the early nineties. It is an open-source concurrent functional language aimed at telecoms and internet services and represents a common instrument for our research that simplifies the transfer of ...
Voir le projet

 10

 TERMINÉ 

Agile Photonic Integrated Systems-on-Chip enabling WDM Terabit Networks (APACHE)

Date du début: 1 avr. 2008, Date de fin: 30 sept. 2011,

The APACHE project will develop new compact, scalable and cost-optimized photonic integrated components that will be capable of generating, regenerating and receiving amplitude- (OOK) and phase- (DPSK, QPSK) encoded optical signals for high capacity (>100Gb/s) WDM networks. The APACHE concept is based on developing devices having both multi-functionality and agility in order to reach Terabit capac ...
Voir le projet

 7

 TERMINÉ 
The EFIPSANS project aims at exposing the features in IP version six protocols that can be exploited or extended for the purposes of designing or building autonomic networks and services. What this means is, a study of the emerging research areas that target desirable user behaviours, terminal behaviours, service mobility, e-mobility, context-aware communications, self-ware, autonomic communicatio ...
Voir le projet

 19

 TERMINÉ 

Self-Optimisation and Self-Configuration in Wireless Networks (SOCRATES)

Date du début: 1 janv. 2008, Date de fin: 28 févr. 2011,

The SOCRATES project investigates the application of self-organisation methods, which includes mechanisms for self-optimisation, self-configuration and self-healing, as a promising opportunity to automate wireless access network planning and optimisation, thus reducing substantially the Operational Expenditure (OPEX) and improving network coverage, resource utilisation and service quality. Fundame ...
Voir le projet

 8