Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 
WiseGRID has two intertwined and equally important strategic goals: on the one hand, it aims at successfully putting in the market, within a horizon of 24 months after project completion, a set of solutions and technologies which increase the smartness, stability and security of an open, consumer-centric European energy grid, with an enhanced use of storage technologies and a highly increased shar ...
Voir le projet

 21

 TERMINÉ 

Analysis System for Gathered Raw Data (ASGARD)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Voir le projet

 34

 TERMINÉ 
In this project we aim at supporting companies operating in the fragmented European ecosystem of the eCommerce, Retail and Marketing industries to increase their efficiency and competitiveness by leveraging deep customer insights that are too challenging for them to obtain today. Improved insights will result from the analysis of large amount of data, acquired from different sources and sectors, a ...
Voir le projet

 10

 TERMINÉ 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The last decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned ...
Voir le projet

 9

 TERMINÉ 
Requirements engineering is a key activity in ICT projects: What are current user needs and what requirements satisfy them? How much effort would a requirement cost and in which release should it be delivered? Which requirements can be reused from similar projects? Are there hidden dependencies or inconsistencies? What trade-offs are acceptable for users and other stakeholders? A satisfactory, eff ...
Voir le projet

 9

 TERMINÉ 

Software Testing AMPlification (STAMP)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

Release early, release often. Such is the mantra of IT giants like Twitter or Netflix. Pioneers in the engineering of applications that run in the cloud now routinely perform hundreds of code updates per day in what has become a thrust of continuous delivery around the clock. This stunning agility is a decisive competitive edge. It cuts time-to-market and hikes revenue. Behind the feat lies DevOps ...
Voir le projet

 10

 TERMINÉ 
Sectors such as aerospace, automotive, wind power, capital goods are characterised, on the one hand, by complex products and small scale production that require high flexibility and on the other hand by an increasing pressure to raise productivity rates. Furthermore manufacturing systems need to deal with an ever-changing environment due to short term changes caused by human or production related ...
Voir le projet

 9

 TERMINÉ 
Despite the proclaimed benefits (i.e. scalability, reliability, cost-effectiveness) of Future Internet (FI) technologies (i.e. edge & cloud computing, IoT/CPS) for factory automation, their adoption from manufacturers remains low for various reasons, including technology issues (e.g., poor situation awareness, limited deployments, no standards-based reference implementations) and the lack of a smo ...
Voir le projet

 12

 TERMINÉ 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Voir le projet

 35

 TERMINÉ 
As we enter 2016, the world is facing a number of critical challenges such as global warming, economic crisis, security threats, inequality, natural disasters and ageing society. Urban areas are particularly affected, given that the world population is increasingly concentrated in those areas. ICT solutions have the potential to change the world and improve the quality of life and security of its ...
Voir le projet

 7

 TERMINÉ 
Starting from previous research experiences and tangible outcomes, STORM proposes a set of novel predictive models and improved non-invasive and non-destructive methods of survey and diagnosis, for effective prediction of environmental changes and for revealing threats and conditions that could damage cultural heritage sites. Moreover, STORM will determine how different vulnerable materials, struc ...
Voir le projet

 20

 TERMINÉ 
Money underpins all terrorist activities (without money propaganda, training, recruitment, and support are less effective or null). The disruption of terrorist financing activity is a key element in any fight against terrorism.DANTE will deliver effective, efficient and automated data mining, analytics solutions and an integrated system to detect, retrieve, and analyse huge amounts of heterogeneou ...
Voir le projet

 18

 TERMINÉ 
A seamless interaction with the public administration (PA) is crucial to make the daily activities of companies and citizens more effective and efficient, saving time and money in the management of administrative processes. In particular, online public services have an enormous potential for reducing the administrative burden of companies and citizens, as well as for creating saving opportunities ...
Voir le projet

 10

 TERMINÉ 

TrustwOrthy model-awaRE Analytics Data platfORm (TOREADOR)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

The TOREADOR project is aimed at overcoming some major hurdles that until now have prevented many European companies from reaping the full benefits of Big Data analytics (BDA). Companies and organisations in Europe have become aware of the potential competitive advantage they could get by timely and accurate Big Data analytics, but lack the IT expertise and budget to fully exploit BDA. To overcom ...
Voir le projet

 10

 TERMINÉ 

Bringing FIWARE to the NEXT step (FI-NEXT)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2018,

Digital technologies underpin innovation and competitiveness across a broad range of market sectors. A key technology to boost such innovation and competitiveness is represented by the full and wide adoption of Open Service Platforms. In fact, they will allow increased competition and market penetration because they should be built on top of royalty-free open specifications, adopting open source r ...
Voir le projet

 16

 TERMINÉ 
Through the FIWARE Mundus activities, mostly performed in the FI-LINKS project, countries from all over the world have already started to mobilize innovators and users around new FIWARE ecosystems. FIWARE is currently stepping out from experimentation into commercialisation. The technology must be adopted at global level in order to allow European FIWARE stakeholders to expand their reach worldwid ...
Voir le projet

 5

 TERMINÉ 
Cloud environments are notorious for their lack of stability in performance characteristics, a feature that makes it extremely difficult for owners of time-critical applications to make the decisive step for migration and owners of SaaS to be unable to present performance vs cost tradeoffs to their customers when acting as IaaS customers. CLOUDPERFECT aims at delivering a set of tools and processe ...
Voir le projet

 8

 TERMINÉ 

frontierCities2 - Another Level of Impact (frontierCities2)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2018,

frontierCities2 – Another Level of Impact represents a quantum leap in the scope, ambition and service. This acceleration programme focused on FIWARE-supported solutions in the Smart Cities area, answering to new opportunities to achieve significant success and impact in promoting FIWARE-supported solutions across European cities and city environments. frontierCities2 – Another level of impact res ...
Voir le projet

 7

 TERMINÉ 

SURveillance Video Archives iNvestigation assisTant (SURVANT)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

All around the world, organizations and agencies deploy video surveillance to monitor and protect property and public infrastructure, driven by various factors like increasing crime rate, security threats, terrorism acts and even monitoring of law enforcement. The influx of surveillance footage from a growing number of cameras operating at higher resolutions, such as HD, coupled with the desire to ...
Voir le projet

 5

 TERMINÉ 

Business Experiments in Cyber Physical Production Systems (BEinCPPS)

Date du début: 1 nov. 2015, Date de fin: 31 oct. 2018,

BEinCPPS Innovation Action aims to integrate and experiment a CPS-oriented Future Internet-based machine-factory-cloud service platform firstly intensively in five selected Smart Specialization Strategy Vanguard regions (Lombardia in Italy, Euskadi in Spain, Baden Wuertemberg in Germany, Norte in Portugal, Rhone Alpes in France), afterwards extensively in all European regions, by involving local c ...
Voir le projet

 23

 TERMINÉ 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Voir le projet

 19

 TERMINÉ 
Cardiovascular disease (CVD) is the leading cause of premature death and disability in Europe and worldwide, costing the EU economy almost EUR 196 billion a year. With changing demographics and deteriorating lifestyle this situation will worsen considerably. While effective cardiac rehabilitation (CR) improves mortality and morbidity rates, uptake of community-based CR, which represents the long-t ...
Voir le projet

 8

 TERMINÉ 

TRusted, CItizen - LEA coILaboratIon over sOcial Networks (TRILLION)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

Community policing promotes the implementation of bi-directional collaboration channels between citizens and Law Enforcement Agencies (LEAs). By enhancing the discovery of relevant and up to date information, it speeds up the detection of risks, eases their prevention and builds a continuum of collaboration which motivates citizens and LEAs to work together.Over 36 months, TRILLION - TRusted, CIti ...
Voir le projet

 13

 TERMINÉ 

EMSO implementation and operation: DEVelopment of instrument module (EMSODEV)

Date du début: 1 sept. 2015, Date de fin: 31 août 2018,

The EMSODEV general objective is to catalyse the full operations of the EMSO distributed Research Infrastructure, through the development and deployment of the EMSO Generic Instrument Module (EGIM). EGIM will provide accurate, consistent, comparable, long-term measurements of ocean parameters, which are key to addressing urgent societal and scientific challenges (e.g. climate change and hazards). ...
Voir le projet

 11

 TERMINÉ 

Advanced Flow Battery Energy Storage Systems in a Microgrid Network (GREENERNET)

Date du début: 1 juil. 2016, Date de fin: 30 juin 2018,

The GREENERNET project will develop a new highly innovative organic redox flow battery, integrated in an optimized microgrid infrastructure operated by an intelligent Energy Management System.The redox flow battery is a promising technology for both medium and large-scale renewable and grid energy storage, but is limited by its high price, low energy density and poor stability of the electrolyte s ...
Voir le projet

 5

 TERMINÉ 

New Cost Efficient Business Models for Flexible Smart Grids (NOBEL GRID)

Date du début: 1 janv. 2015, Date de fin: 30 juin 2018,

NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Voir le projet

 24

 TERMINÉ 

Vision, Insights and Trends for Awareness and Leadership in Media (VITAL MEDIA)

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

Recent research activities in the ICT area, in particular in digital content and media sectors, has resulted in a number of technological enablers which allow the creation of new products and services. This has established a new converged social media environment in Europe as a playground for a large number of stakeholders, to ultimately enable creation of the related business, new jobs, and reven ...
Voir le projet

 9

 TERMINÉ 

Energy Local Storage Advanced system (ELSA) (ELSA)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2018,

Integration of distributed small/medium size storage systems can allow operating distribution grids much more flexibly, thus realizing smart grid features like local demand-supply balancing, congestion relief, peak shaving and effective RES integration. However, few technologically mature decentralized storage systems are commercially available today at affordable prices, while both viable busines ...
Voir le projet

 10

 TERMINÉ 
BlueBRIDGE responds to the Juncker Investment Plan opening funding opportunities for e-Infrastructures, innovating current practices in producing & delivering scientific knowledge advice to competent authorities & enlarges the spectrum of growth opportunities in distinctive Blue Growth areas. BlueBRIDGE builds on existing EU and International e-Infrastructures providing capacity building in interd ...
Voir le projet

 14

 TERMINÉ 
Over 2 billion people worldwide have different types, degrees, or combinations of disability, literacy, digital literacy or aging related barriers that impede or prevent use of ICT. Not long ago you could live without access to ICT quite well. However today access to ICT is required for most education, employment, and commerce, and is increasingly required for travel, health, safety, daily living ...
Voir le projet

 25

 TERMINÉ 
The WeLive project is devised to transform the current e-government approach by facilitating a more open model of design, production and delivery of public services leveraging on the collaboration between public administrations (PAs), citizens and entrepreneurs. WeLive applies the quadruple-helix approach based on the joint collaboration of 3 PAs, 4 research agents and 5 companies, constituing the ...
Voir le projet

 12

 TERMINÉ 

LArge Scale Information Exploitation of Forensic Data (LASIE)

Date du début: 1 mai 2014, Date de fin: 31 oct. 2017,

The LASIE project will design and develop a novel framework to assist forensic analysts in their investigations. The envisaged framework will be based on automated technology for advanced data processing supported by an important human component in critical decision making stages, as well as, legal and ethical aspects. The framework will consist of tools to automatically manipulate, analyse and fu ...
Voir le projet

 18

 TERMINÉ 
The development of the Internet of Things is set to have a strong impact on many aspects of society. Test-beds and experimental facilities, both of small scale and up to city scale, will be an essential enabler to facilitate the development of this vision. Facilitating the access to these test-beds to a large community of experimenters approach is a key asset to the development of a large and acti ...
Voir le projet

 7

 TERMINÉ 

Engaging the EGI Community towards an Open Science Commons (EGI-Engage)

Date du début: 1 mars 2015, Date de fin: 31 août 2017,

Over the last decade, the European Grid Infrastructure (EGI) has built a distributed computing and data infrastructure to support over 21,000 researchers from many disciplines with unprecedented data analysis capabilities. EGI builds on the European and national investments and relies on the expertise of EGI.eu - a not-for-profit foundation that provides coordination to the EGI Community, includin ...
Voir le projet

 43

 TERMINÉ 

Education for Data Intensive Science to Open New science frontiers (EDISON)

Date du début: 1 sept. 2015, Date de fin: 31 août 2017,

The EDISON project will focus on activities to establish the new profession of ' Data Scientist', following the emergence of Data Science technologies (also referred to as Data Intensive or Big Data technologies) which changes the way research is done, how scientists think and how the research data are used and shared. This includes definition of the required skills, competences framework/profile, ...
Voir le projet

 8

 TERMINÉ 
Human balance is achieved and maintained by a complex set of sensorimotor systems that include sensory input from vision, proprioception and the vestibular system (motion, equilibrium, spatial orientation); integration of the sensory input; and motor output to the muscles of the eye and body. Failure at the level of the sensory inputs or at the integration of the sensory information by the central ...
Voir le projet

 10

 TERMINÉ 
Despite the ongoing efforts on energy efficiency improvements,, the lower energy consumption per data centre does not compensate the cumulative increasing energy demand, due to the combined action of increasing load density in the computer room and rising digitization of human activities. Hence data centres are consuming increasing amount of energy, with a negative impact on the environment and on ...
Voir le projet

 11

 TERMINÉ 

Scaffolding Scalable Software Services (S-CASE)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The goal of S-CASE is to accelerate the software development lifecycle for cloud services by introducing a new agile prototyping paradigm that automates the process of mapping user requirements to concrete software specifications and generates operational code (RESTful services). S-CASE aspires to support software developers in identifying software requirements and business processes in various fo ...
Voir le projet

 9

 TERMINÉ 

Engineering Virtualized Services (ENVISAGE)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

Software services are virtualized if they can adapt to the elasticity of cloud computing. To foster the industrial adoption of virtualized services, it is necessary to address two important problems: (1) the efficient analysis, dynamic composition and deployment of services with qualitative and quantitative service levels and (2) the dynamic control of resources such as storage and processing capa ...
Voir le projet

 8