Rechercher des projets européens

12 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The “Innovative Aircraft Architecture” technology stream of the Clean Sky 2 Airframe ITD focuses on advanced power-plant solutions (such as CROR and UHBR) that are able to deliver a significant gain in aircraft performance. Project DEMOS will develop advanced predictive modelling and simulation capabilities for engine design space exploration and performance optimization of such novel propulsion s ...
Voir le projet

 3

 TERMINÉ 

MYRRHA Research and Transmutation Endeavour (MYRTE)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2019,

The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MYRTE is to perform the necessary research in order to demonstrate the feasibility of trans ...
Voir le projet

 28

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Voir le projet

 34

 TERMINÉ 

Seismic-Initiated events risk mitigation in LEad-cooled Reactors (SILER)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

"SILER is a Project aimed at studying the risk associated to seismic initiated events in Generation IV Heavy Liquid Metal reactors and developing adequate protection measures.The attention is focused on the evaluation of the effects of earthquakes (with particular regards to beyond design seismic events and tsunamis) and to the identification of mitigation strategies, acting both on structures/com ...
Voir le projet

 18

 TERMINÉ 

"MYRRHA Accelerator eXperiment, research and development programme" (MAX)

Date du début: 1 févr. 2011, Date de fin: 31 juil. 2014,

"The present FP-7 proposal MAX is subsequent to the recommendations of the Strategic Research Agenda of SNETP for ADS development in Europe. Its aim is to pursue the R&D required for a high power proton accelerator as specified by the MYRRHA project. There is especially a strong focus on all the aspects that pertain to the reliability and availability of this accelerator.This R&D effort builds on ...
Voir le projet

 11

 TERMINÉ 

Advanced Electrolyser for Hydrogen Production with Renewable Energy Sources (ADEL)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2013,

The ADEL project (ADvanced ELectrolyser for Hydrogen Production with Renewable Energy Sources) proposes to develop a new steam electrolyser concept named Intermediate Temperature Steam Electrolysis (ITSE) aiming at optimizing the electrolyser life time by decreasing its operating temperature while maintaining satisfactory performance level and high energy efficiency at the level of the complete sy ...
Voir le projet

 13

 TERMINÉ 

Lead-cooled European Advanced Demonstration Reactor (LEADER)

Date du début: 2 avr. 2010, Date de fin: 1 oct. 2013,

"The LEADER proposal deals with the development to a conceptual level of a Lead Fast Reactor Industrial size plant and of a scaled demonstrator of the LFR technology. The proposal is based on previous achievements obtained during the 6th FP of the EU in the ELSY project but takes into account the indications emerged from the European Strategic Research Agenda as well as the main goals of the Europ ...
Voir le projet

 17

 TERMINÉ 

European Gas Cooled Fast Reactor (GoFastR)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Voir le projet

 22

 TERMINÉ 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Voir le projet

 59

 TERMINÉ 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Voir le projet

 20

 TERMINÉ 
HycycleS aims at the qualification and enhancement of materials and components for key steps of thermochemical cycles for solar or nuclear hydrogen generation. The focus of HycycleS is the decomposition of sulphuric acid which is the central step of the sulphur based family of those processes, especially the hybrid sulphur cycle and the sulphur-iodine cycle. Breakthrough developments are targeted ...
Voir le projet

 9