Rechercher des projets européens

12 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

Arrowhead (ARROWHEAD)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Voir le projet

 87

 TERMINÉ 

SCUBA - Self-organising, Cooperative, and robUst\n Building Automation (SCUBA)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

Large scale embedded Monitoring and Control (M&C) systems in energy management, transporta-tion, security and safety often co-exist alongside each other with little cooperation within and among heterogeneous systems which hampers the increasing demand to operate the whole system optimally. A good example is building management, a market worth in excess of $36 billion annually by 2015, where a wide ...
Voir le projet

 9

 TERMINÉ 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2014,

...s is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of these embedded systems is steadily growing.One of the most important enablers to assure the quality of embedded systems is the ...
Voir le projet

 42

 TERMINÉ 

Time Domain Electromagnetic Characterisation and Simulation for EMC (TECS)

Date du début: 30 sept. 2008, Date de fin: 30 juil. 2013,

Objectif général :Les systèmes électroniques intègrent aujourdhui de plus en plus de fonctionnalités dans un espace confiné, ce qui augmente les phénomènes d'interférences électromagnétiques (IEM) entre les composants. De nombreux travaux ont été menés sur des mesures fréquentielles (perturbations à différents niveaux de fréquence) beaucoup moins dans le domaine temporel (sur un intervalle de temp ...
Voir le projet

 2

 TERMINÉ 

Nomad Biometric Authentification (NOBA)

Date du début: 31 oct. 2007, Date de fin: 13 juil. 2013,

...igent feature evaluation and selection for iris recognition- Integration in a dematerialization workflow- System evaluation- Feasibility study on embedded system- Added-value of other biometric techniques Achievements: Principales réalisations / résultats :- Etat de lar ...
Voir le projet

 2

 TERMINÉ 

SPACEWIRE RT (SpWRT)

Date du début: 1 juin 2011, Date de fin: 31 mai 2013,

The trend towards “Operationally Responsive Space”, where spacecraft can be rapidly assembled, configured and deployed, to meet specific mission needs, e.g. disaster support, requires flexible on board communication networks with plug-and-play capability. The growing autonomy of scientific missions to remote planets requires networks that are robust and durable, able to recover from transitory err ...
Voir le projet

 5

 TERMINÉ 
The focus of the project MULTIFORM is on the integration and the interoperation of tools and methods based on different modelling formalisms in order to make a significant step towards integrated coherent tool support for the design of large complex controlled systems from the first concept to the implementation and further on over their entire life cycle.By addressing the issue of multi-level mul ...
Voir le projet

 10

 TERMINÉ 

ArtistDesign – Design for Embedded Systems (ArtistDesign)

Date du début: 1 janv. 2008, Date de fin: 31 mars 2012,

...e and that was organised through the Artist2 FP6 NoE.The central objective for ArtistDesign is to build on existing structures and links forged in Artist2, to become a virtual Center of Excellence in Embedded Systems Design. This will be mainly achieved through tight integration between the central players of the European research community. Also, the consortium is smaller, and integrates several ...
Voir le projet

 38

 TERMINÉ 

Low-Carbon Hybrid Advanced Motive Power (CHAMP)

Date du début: 27 janv. 2008, Date de fin: 30 mai 2011,

Objectif général :Le projet CHAMP proposé par l’IRSEEM et les Universités de Picardie Jules Verne (UPJV) et de Brigthon (UoB) a pour but de développer une motorisation hybride de puissance relativement faible mais à haute efficacité et sa stratégie de commande avancée. Le projet vise ainsi à concevoir un système de propulsion à très faible niveau d’émissions polluantes et à consommation de carbura ...
Voir le projet

 3

 TERMINÉ 
Characteristic for embedded systems is that they have to meet a multitude of quantitative constraints.These constraints involve the resources that a system may use (computation resources, power consumption, memory usage, communication bandwidth, costs, etc.), assumptions about the environment in which it operates (arrival rates, hybrid behaviour), and requirements on the services that the system h ...
Voir le projet

 10

 TERMINÉ 

Generic Embedded System Platform (GENESYS)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2009,

The objective of the GENESYS project is to develop a cross-domain reference architecture for embedded systems that can be instantiated for different application domains to meet the requirements and constraints documented in the ARTEMIS strategic research agenda. These requirements are composability, networking, security, robustness, diagnosis, integrated resource management and evolvability. The r ...
Voir le projet

 25