WaveBoost aims at providing a step-change improvement to the reliability and performance of PTOs (Power-Take-Offs), by developing and validating an innovative braking module with a Cyclic Energy Recovery System (CERS). While built and tested on the platform of the existing CorPower technology, the CERS braking module can be integrated in many types of Wave Energy Converters (WECs). Especially for ...
Voir le projet

 8

 TERMINÉ 
The recent experience with ocean wave energy have revealed issues with reliability of technical components, survivability, high development costs and risks, long time to market, as well as industrial scalability of proposed and tested technologies. However the potential of wave energy is vast, and also positive conclusions have been drawn, in particular that wave energy is generally technically fe ...
Voir le projet

 12

 TERMINÉ 
Unlike the control and observability put in service in HV/MV, LV networks are still being substantially managed as usual: no visibility of power and voltage or grid components status, poor knowledge of connectivity, manual operation of switches or few tools for worker support. The LV grid characteristics (radial topology, exposition to local disturbances, local accumulation of distributed generati ...
Voir le projet

 20

 TERMINÉ 
A new EU 7th Framework Programme project, “LEANWIND” (Logistic Efficiencies And Naval architecture for Wind Installations with Novel Developments) seeks to apply lean principles to the offshore wind farm project lifecycle. The primary LEANWIND objective is to provide cost reductions across the offshore wind farm lifecycle and supply chain through the application of lean principles and the developm ...
Voir le projet

 32

 TERMINÉ 
...o-economical requirements with necessary adaptation.The proposed energy management platform will be evaluated in realistic scenarios using real world set-ups in Alliander microgrid in Bronsbergen and EDP Smart Grid in Portugal, as well as in emulation.In order to stimulate the exploitation of the results we will provide a guide book and tools for parties interested in using our solution, to help t ...
Voir le projet

 12

 TERMINÉ 

High Altitude Wind Energy (HAWE)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2014,

The quest for clean and renewable energy sources found tremendous potential in wind power. So far, it has been harvested mostly by wind towers, which use only wind currents close to the ground (bellow 200m of height). Since low altitude wind currents are slow and intermittent, most wind farms operate, on average, 25-35% of their capacity. This represents a severe limitation to current state-of-art ...
Voir le projet

 7

 TERMINÉ 

Demonstration of the WindFloat Technology (DEMOWFLOAT)

Date du début: 15 juil. 2011, Date de fin: 14 juil. 2014,

Consistent with industrial initiative of the SET Plan this project addresses the objective of a grid-connected multi-megawatt fully integrated offshore wind turbine hosted on a floating support structure. The Proposed Project is in the unique position to leverage significant pre-existing financial and intellectual capital invested by the project coordinator, WindPlus in a PILOT unit installation ...
Voir le projet

 12

 TERMINÉ 
COMET aims at identifying and assessing the most cost effective CO2 transport and storage infrastructure able to serve the West Mediterranean area, namely Portugal, Spain and Morocco. This is achieved considering the time and spatial aspects of the development of the energy sector and other industrial activities in those countries as well as the location, capacity and availability of potential CO2 ...
Voir le projet

 18

 TERMINÉ 

Open Architecture for Secondary Nodes of the Electricity SmartGrid (OpenNode)

Date du début: 1 janv. 2010, Date de fin: 30 sept. 2012,

European energy industry is facing three major challenges:a) the increased integration of renewable, fluctuating power resources to achieve the climate goals,b) increased "smartness" especially in the electrical distribution grid to cope with increasing capacity requirements and finallyc) the stakeholder diversification separating grid operation, power provisioning, metering services, auxiliary se ...
Voir le projet

 9

 TERMINÉ 

Wireless Sensor Networks for the Protection of Critical Infrastructures (WSAN4CIP)

Date du début: 1 janv. 2009, Date de fin: 31 déc. 2011,

The goal of WSAN4CIP is to substantially advance the technology of Wireless Sensor and Actuator Networks (WSANs) beyond the current state of the art and to apply this technology to the Protection of Critical Infrastructures. In particular, the WSAN4CIP project will apply these advanced wireless and sensor network developments to the management of power generation and distribution infrastructure ma ...
Voir le projet

 12

 TERMINÉ 
"Electric and plug-in hybrid vehicles (EV, PHEV) have the potential to contribute significantly to solving contemporary and future environmental and economic challenges of mobility. Various projects in different EU member states are currently addressing the subject in an isolated manner. The G4V consortium consisting of major European electric utilities and distinguished academic institutions are ...
Voir le projet

 14