Rechercher des projets européens

17 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Vision Inspired Driver Assistance Systems (VI-DAS)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Road accidents continue to be a major public safety concern. Human error is the main cause of accidents. Intelligent driver systems that can monitor the driver’s state and behaviour show promise for our collective safety. VI-DAS will progress the design of next-gen 720° connected ADAS (scene analysis, driver status). Advances in sensors, data fusion, machine learning and user feedback provide the ...
Voir le projet

 16

 TERMINÉ 

Integrated Technology Ecosystem for ProACTive Patient Centred Care (ProACT)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2019,

ProACT targets Europe’s 50 million multimorbid patients to proactively self-manage and offset the EU’s annual €700billion cost of chronic disease management. ProACT aims at providing and evaluating an open application programming interface to integrate a variety of new and existing technologies to advance ‘home based’ integrated care (IC). Cloud based data analytics will determine correlations bet ...
Voir le projet

 14

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 
A Roadmap to the realization of fusion energy was adopted by the EFDA system at the end of 2012. The roadmap aims at achieving all the necessary know-how to start the construction of a demonstration power plant (DEMO) by 2030, in order to reach the goal of fusion electricity in the grid by 2050. The roadmap has been articulated in eight different Missions. The present proposal has the goal of impl ...
Voir le projet

 31

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

Operational Potential of Ecosystem Research Applications (OPERAs)

Date du début: 1 déc. 2012, Date de fin: 30 nov. 2017,

Human use and exploitation of the biosphere is increasing at such a pace and scale that the sustainability of major ecosystems is threatened, and may not be able to continue to function in ways that are vital to the existence of humanity. Re-framing environmental resource use has led to the emergence of the concepts of ecosystem services (ES) and natural capital (NC). This discourse indicates not ...
Voir le projet

 27

 TERMINÉ 
The NanoMILE project is conceived and led by an international elite of scientists from the EU and US with the aim to establish a fundamental understanding of the mechanisms of nanomaterial interactions with living systems and the environment, and uniquely to do so across the entire life cycle of nanomaterials and in a wide range of target species. Identification of critical properties (physico-che ...
Voir le projet

 30

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

Future Internet Social and Technological Alignment Research (FI-STAR)

Date du début: 1 avr. 2013, Date de fin: 30 sept. 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Voir le projet

 44

 TERMINÉ 
Nanoscale objects interact with living organisms in a fundamentally new manner, ensuring that a fruitful marriage of nanotechnology and biology will long outlast short term imperatives. Therefore, investment in an infrastructure to drive scientific knowledge of the highest quality will have both immediate benefits of supporting the safety assessment of legacy nanomaterials, as well as pointing tow ...
Voir le projet

 33

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143

 TERMINÉ 

Public Engagement with Research and Research Engagement with Society (PERARES)

Date du début: 1 mai 2010, Date de fin: 31 oct. 2014,

PERARES strengthens public engagement in research (PER) by developing multi-annual action plans, involving researchers and Civil Society Organisations (CSOs) in the formulation of research agendas and the research process. It uses debates on science to actively articulate research requests of civil society. These are forwarded to research institutes, and results are used in a next phase of the deb ...
Voir le projet

 28

 TERMINÉ 

Intelligent Transportation for Dynamic Environment (InTraDE)

Date du début: 2 oct. 2007, Date de fin: 30 mars 2014,

... Achievements: An Intelligent Autonomous Vehicle (IAV) has been produced and tested in the ports of Radicatel (France), Dublin (Ireland), and Oostende (Belgium), A real-time Simulation and supervision platform has also been produced, and a recent design refinement undertaken. An improved version of the software has also b ...
Voir le projet

 7

 TERMINÉ 

ASSET Advanced Safety and Driver Support in Essential Road Transport (ASSET-ROAD)

Date du début: 1 juil. 2008, Date de fin: 31 déc. 2011,

"As the European objectives of integration and economic growth are achieved, there is a corresponding vigorous growth in road traffic volumes. This results in congestion and increased numbers of road fatalities. The objective of the ASSET project is to reverse these negative effects by developing a number of promising technologies and integrating them into a new holistic approach to road safety. ...
Voir le projet

 19

 TERMINÉ 

Enabling Grids for E-sciencE III (EGEE-III)

Date du début: 1 mai 2008, Date de fin: 30 avr. 2010,

A globally distributed computing Grid now plays an essential role for large-scale, data intensive science in many fields of research. The concept has been proven viable through the Enabling Grids for E-sciencE project (EGEE and EGEE-II, 2004-2008) and its related projects. EGEE-II is consolidating the operations and middleware of this Grid for use by a wide range of scientific communities, such as ...
Voir le projet

 167

 TERMINÉ 

Virtual Measurement Environment

Date du début: 1 oct. 2007,

In higher education as a whole and in the field of science and technology in particular, it is of vital importance to organize up-to-date laboratory practices for the students and to teach them how to acquire new skills and competences, which may involve problem based learning, and the use of the computer in the laboratory as a virtual measurement instrument. Therefore the existing knowledge relat ...
Voir le projet

 4

 TERMINÉ 
The project "Training for the technology of the future: Fuel cell-heaters in building services" has developed a blended learning programme which is exemplified by the bridging module "Fuel cell-heaters”.The bridging module "Fuel cell-heaters" is situated within the curriculum framework of the previously developed basic module and the soon to be developed application module in the new ZuHause 3 pro ...
Voir le projet

 9