Rechercher des projets européens

18 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Semantic Data Management (SemData)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

Semantic data management refers to a range of techniques for the manipulation and usage of data basedon its meaning. Semantically enabled linked and open data have been published at an increasing pace inrecent years, and this technology has been adopted by major industrial players, including Google, Yahoo,Oracle, Talis and IBM. But to reach their full potential of becoming a transformative technol ...
Voir le projet

 5

 TERMINÉ 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Voir le projet

 48

 TERMINÉ 

Enhanced European Coordination for Accelerator Research & Development (EUCARD-2)

Date du début: 1 mai 2013, Date de fin: 30 avr. 2017,

Research accelerators are facing important challenges that must be addressed in the years to come: existing infrastructures are stretched to all performance frontiers, new world-class facilities on the ESFRI roadmap are starting or nearing completion, and strategic decisions are needed for future accelerators and major upgrades in Europe.While current projects concentrate on their specific objecti ...
Voir le projet

 40

 TERMINÉ 
The current maintenance policies, including e.g. RCM (Reliability Centred Maintenance) and TPM (Total Productive Maintenance), can be generally useful in answering questions such as “how much maintenance should be done on this machine?” “How frequently should this part be replaced?” “How many spare parts should be kept in stock?” “How should the shutdown be scheduled?” It is generally accepted tha ...
Voir le projet

 14

 TERMINÉ 
Proposal Full title: Biomimetic Approaches of Natural Functional Surfaces with hierarchical micro & nano structure and the extreme Wettability (Acronym: BioApproNFS Wett)Abstract:In the natural world, plants and animals have evolved over time to best adapt to the environment. They interact very effectively with the surrounding environment by exchanging energies and mass flow across their cuticles ...
Voir le projet

 6

 TERMINÉ 

FP7 High Luminosity Large Hadron Collider Design Study (HILUMI LHC)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2015,

The Large Hadron Collider (LHC) is the largest scientific instrument ever built. It has been exploring the new energy frontier since 2009, gathering a global user community of 7,000 scientists. It will remain the most powerful accelerator in the world for at least two decades, and its full exploitation is the highest priority in the European Strategy for Particle Physics, adopted by the CERN Counc ...
Voir le projet

 16

 TERMINÉ 
"A sustainable and efficient freight transport in Europe plays a vital role in having a successful and competitive economy. Freight transport is expected to grow by some 50 % (in tonne-kilometres) by 2020. However rail has, in many areas, been displaced from a dominant position as road transport services have grown and developed in capability and levels of sophistication that have not been matche ...
Voir le projet

 31

 TERMINÉ 
Modern manufacturing techniques and logistics require reliable, time sensitive delivery of lower density and higher value goods. This presents a market opportunity for rail freight to grow, partly due to increasing congestion on roads, and mainly due to the need for reliable and environment friendly transport of goods. At the same time, to meet customer requirements, rail freight has to rise to th ...
Voir le projet

 24

 TERMINÉ 
CASCADE aims to provide the foundation for a future INCONET programme targeting South Asian Countries, which will promote bi-regional coordination of Science &Technology (S&T) cooperation, including priority setting and definition of S&T cooperation policies. The objectives of CASCADE, as an 18-month supporting action, are to: compile a regional position paper that identifies global challenges and ...
Voir le projet

 18

 TERMINÉ 
This proposed project explores fundaments and principles for surface measurement and characterization for ultra/nano-precision non-Euclidean geometry and deterministic surfaces, which are vital for making possible key areas of 21st century science - pure and applied, engineering and bio-engineering. The research will explore an original integrated measurement and characterization system with two ...
Voir le projet

 1

 TERMINÉ 

Preserving Linked Data (Prelida)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2014,

PRELIDA will target the particular stakeholders of the Linked Data community, including data providers, service providers, technology providers and end user communities. These stakeholders have not been traditionally targeted by the Digital Preservation community, and are typically not aware of the digital preservation solutions already available. So an important task of PRELIDA is to raise awaren ...
Voir le projet

 5

 TERMINÉ 
D-RAIL will focus on freight traffic, identifying root causes of derailment of particular significance to freight vehicles, which have a wider range of operating parameters (as a result of the huge range in loads, speeds and maintenance quality) than passenger vehicles. One key question that will be studied is how independent minor faults (e.g., a slight track twist and a failing bearing) could co ...
Voir le projet

 22

 TERMINÉ 
The certification of a rail vehicle according to European regulations, Technical Specifications for Interoperability, European Standards and national safety rules represents a significant element of both vehicle cost and time to market. Indeed, a large part of vehicle certification mandates testing for safety, performance and infrastructure compatibility. The new EN standards together with the CR/ ...
Voir le projet

 23

 TERMINÉ 

European Coordination for Accelerator Research and Development (EuCARD)

Date du début: 1 avr. 2009, Date de fin: 31 juil. 2013,

Particle physics stands at the threshold of a new era of discovery and insight. Results from the much awaited LHC are expected to shed light on the origin of mass, supersymmetry, new space dimensions and forces. In July 2006 the European Strategy Group for Particle Physics defined accelerator priorities for the next 15 years in order to consolidate the potential for discovery and conduct the requi ...
Voir le projet

 39

 TERMINÉ 
The primary goal of HARCO project is to achieve cost-effective structural solutions consisting of a new class of Smart Components (belonging to machine tools applications) based on plug-and-produce “Modular Adaptronic devices” which integrate smart and multifunctional actuators/sensors capable of performing a wide array of multiple functions, ranging from high and adaptable damping and stiffness c ...
Voir le projet

 10

 TERMINÉ 

SELF OPTIMISING MEASURING MACHINE TOOLS (SOMMACT)

Date du début: 1 sept. 2009, Date de fin: 31 août 2012,

SOMMACT develops and validates an innovative production hardware and control system founded on understanding, evaluating and controlling production system performances. This approach is based on detection (in-process traceable measurement embedded capabilities) and compensation (adaptive control and self-learning capabilities) of geometrical effects of varying external and internal quantities, suc ...
Voir le projet

 12

 TERMINÉ 
Ever increasing competition in international markets drives manufacturers to shorten design cycles and reduce manufacturing times and costs for their products. This trend generates a demand for smart, flexible and faster machining systems, which are easy to set up and configure and able to drastically increase productivity, while improving final accuracy. Therefore the primary goal is to achieve c ...
Voir le projet

 9

 TERMINÉ 

The European Spallation Neutron Source (ESS) (NeutronSourceESS)

Date du début: 1 avr. 2008, Date de fin: 31 mars 2010,

The European Spallation neutron Source (ESS) will be the world’s most powerful source of neutrons. Its design parameters makes it the most cost-effective top tier source for 40 years or more. A genuine pan‑European facility, it will serve a user community of 5,000 users annually across many areas of science and technology. Neutron beams produced by reactors are inherently intensity-limited. The ES ...
Voir le projet

 11