Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
DESTINATE aims to develop tools and methodologies for railway noise simulation and cost-benefit analysis of mitigation actions of interior and exterior noise. For accurate noise prediction it is essential to characterize the structure-borne and airborne sound sources accurately in order to create valid input for sound prediction simulation models. The calculated interior and exterior noise can be ...
Voir le projet

 8

 TERMINÉ 
...0% of patients achieve long term survival with current treatment but there has been no improvement in this proportion for 25 years. Treatment is unsuccessful because chemotherapy fails to prevent the development of, or to effectively treat established, metastases. In addition, of the 600 new cases of ES occurring in the EU each year, less than half will receive treatment ‘appropriate’ to deliver t ...
Voir le projet

 21

 TERMINÉ 
...tions on wing trailing edges thereby improving the performance and loads situation in the whole operational domain.(5) Technologies to mitigate airframe noise during landing generated on flap and undercarriage and through mutual interaction.(6) Technologies to mitigate/control vibrations in the undercarriage area during take-off and landing.AFLoNext aims to prove the engineering feasibility of the ...
Voir le projet

 41

 TERMINÉ 
"Dry, wet and multiphase particulate materials constitute over 75% of raw material feedstock to industry. Despite their significance, many industrial particulate processes display unpredictable behaviour due to both their multiscale nature and the coexistence of different phases: this leads to undesirable losses in resources, energy, money and time. Considerable progress can be achieved using mult ...
Voir le projet

 11

 TERMINÉ 

Complex wetting phenomena (COWET)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2017,

...of numerous theoretical, computational and experimental investigations. Most of the research and training activities are focused on the wetting of simple solids by one-component liquids. However, a wide variety of industrial processes mostly include wetting/spreading of complex multiphase liquids over heterogeneous, structured or (nano)porous solids. The latter include deposition of active substan ...
Voir le projet

 13

 TERMINÉ 

Pour une pratique pédagogique des droits de l'enfant

Date du début: 1 mai 2016, Date de fin: 31 oct. 2017,

...f children's rights is still a topical issue. While in theory the child rights enjoy relative recognition, the passage from intentions to achievements stil difficult. But the children's rights is not decreed, they apply. But acting for the realization of the rights of the Child in non-formal education in Europe means to think or rethink teaching practices in leisure centres. Consequently, the Depa ...
Voir le projet

 5

 TERMINÉ 

Human Factors of Automated Driving (HFAuto)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

Road transport is an essential part of society but the burden of traffic crashes, congestion, and pollution is enormous. Highly automated driving (HAD) has the potential to resolve these problems and major car makers foresee that HAD will be technically ready for commercialisation within one decade from now. However, industry is ill-prepared to deal with imminent human-error and legal consequences ...
Voir le projet

 7

 TERMINÉ 
Our proposal is based on the idea that real-time functional neuroimaging can be used to train patients to regulate their own brain activity via neurofeedback training and thus modulate the brain networks of mental disorder, restore function, improve symptoms and promote resilience. We have brought together the core groups that have been instrumental in the development of methods for real-time func ...
Voir le projet

 12

 TERMINÉ 
SYMBITRON targets a major technological leap for symbiotic man-machine interactions. In particular, the project results will markedly improve the lives of (partially) paralyzed persons through the development of a superior wearable exoskeleton. Such systems are designed to offer Spinal Cord Injured (SCI) patients the ability to walk and overcome obstacles in their daily life. To date, wearable exo ...
Voir le projet

 6

 TERMINÉ 

Advanced Immunization Technologies (ADITEC)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2017,

Vaccines so far have been developed mostly by following an empiric approach. To prevent and possibly cure unresolved and emerging infectious diseases we need to fully exploit the potential of the human immune system. Progress in science and technology makes it possible to achieve what was previously deemed impossible. The scope of this project is to produce knowledge necessary to develop novel and ...
Voir le projet

 53

 TERMINÉ 

Internationalisering en Vaardigheidsvergroting in het Engels

Date du début: 1 août 2016, Date de fin: 31 juil. 2017,

...6 teachers, working in difefrent agegroups in our organisation, we want to participate in the course LAnguage Learning Fun and Games - Methodology for primary schools.We want to :To enable a better understanding of Primary Language Teaching and expand & build on previous knowledge, using a range of practical methodologies.To introduce new areas of teaching methodologies and accompanying techniques ...
Voir le projet

 1

 TERMINÉ 
The Regional Federation (FR) MFR is an association of 18 MFR training institutions forming young adults in alternation in the following fields: agriculture, environment, personal services, businesses and crafts. This association is managed by a Board of Directors (BO) whose 15 members come from departmental Federations (FD), which is composed of directors of MFR institutions. They are elected and ...
Voir le projet

 46

 TERMINÉ 

Multipurpose hemp for industrial bioproducts and biomass (MULTIHEMP)

Date du début: 1 sept. 2012, Date de fin: 28 févr. 2017,

...p well adapted to most European conditions, with advantageous environmental and agronomical characteristics. Traditionally cultivated for the fibres, seeds and psychoactive substances, it is now considered an ideal crop to produce innovative biomaterials. Once a key industrial crop for fibre, hemp production declined in the last century and was displaced by cotton and synthetic fibres. This explai ...
Voir le projet

 25

 TERMINÉ 
...irtual service hubs that aggregate, harmonise and visualise open transport-related data to drive the rapid creation of innovative new applications and services. OTN has chosen Transport as a cross border focus-area because it touches upon almost every facet of 21st century living, making it an ideal target for the creation of solutions that can be enhanced by location based services such as Global ...
Voir le projet

 14

 TERMINÉ 

Glioma Actively Personalized Vaccine Consortium (GAPVAC)

Date du début: 1 nov. 2012, Date de fin: 31 janv. 2017,

"Glioblastoma (GBM) is a rare (2-3 incidences in 100,000) and fatal disease. Each year, approximately 13,000 new cases of GBM are diagnosed in Europe. The 5-year survival rate of this highly aggressive tumor entity under conventional therapy is less than 6%. Currently available therapeutic options neglect the individuality of each patients’ disease and only temporarily influence tumor progression ...
Voir le projet

 13

 TERMINÉ 

Managing Impacts of Deep-seA reSource exploitation (MIDAS)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

The MIDAS project addresses fundamental environmental issues relating to the exploitation of deep-sea mineral and energy resources; specifically polymetallic sulphides, manganese nodules, cobalt-rich ferromanganese crusts, methane hydrates and the potential mining of rare earth elements. These new industries will have significant impacts on deep-sea ecosystems, in some cases extending over hundre ...
Voir le projet

 34

 TERMINÉ 
The objective of the FIGARO project is to significantly reduce the use of fresh water on farm level through developing a cost-effective, precision irrigation management platform. The platform will be structured for data acquisition from monitoring devices and forecasting tools, data interpretation, system control, and evaluation mechanisms enabling full decision support for end users at farm scale ...
Voir le projet

 18

 TERMINÉ 
...ment of FI-PPP activities to ensure the relevance, rigor and robustness of the emerging Future Internet (FI) concepts, visions and roadmaps. The co-creative CONCORD methodology is based on the SECI model (Socialisation, Externalisation, Combination,Internalisation) in a spiral development process.CONCORD implements fair, neutral, open and inclusive procedures to assist FI-PPP stakeholders to achie ...
Voir le projet

 10

 TERMINÉ 
Each year more than 63,000 new cases of kidney cancer are diagnosed in the European Union. Approx. 50% of all patients have metastasized renal cell cancer (mRCC) at presentation or develop metastases during follow-up. 5-year relative survival of mRCC has been extremely poor: between 5 and 10%. In the past few years, so-called targeted therapies that suppress angiogenesis have changed the clinical ...
Voir le projet

 15

 TERMINÉ 

Europeana Cloud: Unlocking Europe's Research via The Cloud (eCloud)

Date du début: 1 févr. 2013, Date de fin: 30 avr. 2016,

Europeana Cloud is a Best Practice Network, submitted under Objective 2.1.a and coordinated by the Europeana Foundation, designed to establish a cloud-based system for Europeana and its aggregators. Europeana Cloud will provide new content, new metadata, a new linked storage system, new tools and services for researchers and a new platform - Europeana Research. Content providers and aggregators, a ...
Voir le projet

 36

 TERMINÉ 

Integrated Components for Assisted Rescue and Unmanned Search operations (ICARUS)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

"Recent dramatic events such as the earthquakes in Haiti and L’Aquila or the flooding in Pakistan have shown that local civil authorities and emergency services have difficulties with adequately managing crises. The result is that these crises lead to major disruption of the whole local society. The goal of ICARUS is to decrease the total cost (both in human lives and in €) of a major crisis. In o ...
Voir le projet

 29

 TERMINÉ 
Brain disorders impose an increasing economical and social burden in the member states of the European Union (EU). For most neurodegenerative diseases and many neuropsychiatric disorders no efficient treatment is available and no cure exists. In the next coming years the number of particularly elderly people suffering from brain disorders will tremendously increase. Predictions from the turn of th ...
Voir le projet

 10

 TERMINÉ 

Coupled Parallel Simulation of Gas Turbines (COPA-GT)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

"The proposed project COPA-GT has been structured to provide training of a multi-disciplinary and intersectorial nature for young Fellows in Europe in the field of propulsion and electric power generation systems. The young researchers will obtain expertise in gas turbines engine (GT) design, based on fluid and structural mechanics, combustion, acoustics and heat transfer. They will become familia ...
Voir le projet

 8

 TERMINÉ 

Smart Platforms Enabling the Creative Industries for the Future Internet (SPECIFI)

Date du début: 1 janv. 2013, Date de fin: 30 nov. 2015,

Focal areas that Smart Cities try to overcome are the reduction of pollution, traffic, or crime, and the introduction of models for public data. However, it is SPECIFI's guiding principle that Smart Cities need to go beyond upgrades related to control tasks and public data. They can only become a success if they also become Smart Creative Cities, by employing open, Future Internet infrastructures ...
Voir le projet

 17

 TERMINÉ 

Innovative high efficiency phase change fluid based heat engine (UP-THERM)

Date du début: 1 sept. 2013, Date de fin: 31 oct. 2015,

A simple and economic engine concept is proposed as an alternative to the conventional heat engine.The main innovative character of the project is determined by the conceptual approach toward technological solution of the challenging problems of heat engines with external heat supply. This approach includes the use of working fluids changing phase, with crucial benefits in terms of:• liquid workin ...
Voir le projet

 8

 TERMINÉ 

InnoVative Flexible Electric Transport (V-FEATHER)

Date du début: 1 juil. 2012, Date de fin: 31 oct. 2015,

The V-FEATHER project presents a complete electric vehicle architecture vision on how urban light duty vehicles will be designed, built and run in the near future. This project is led by industrial partners with emphasis on energy efficiency, commercial viability, life cycle design and development of new technologies for LDVs steered by leading research institutes.The vehicle is built around an ac ...
Voir le projet

 11

 TERMINÉ 

Smart Intelligent Aircraft Structures (SARISTU)

Date du début: 1 sept. 2011, Date de fin: 31 août 2015,

... challenges arising from the structuralintegration on commercial aircraft. In particular the skin material and its bonding to the substructureis challenging. It is the aim of this project proposal to demonstrate the structuralrealizability of individual morphing concepts concerning the leading edge, the trailing edge and thewinglet on a full-size external wing by aerodynamic and structural testing ...
Voir le projet

 68

 TERMINÉ 
The aim of BioBuild is to use biocomposites to reduce the embodied energy in building facade, supporting structure and internal partition systems by at least 50% over current materials with no increase in cost. This will lead to a step change in the use of sustainable, low carbon construction materials, by replacing aluminium, steel, FRP, brick and concrete in buildings.Facades are widely used in ...
Voir le projet

 17

 TERMINÉ 

Development of a bioartificial liver therapy in acute liver failure (BALANCE)

Date du début: 1 juin 2012, Date de fin: 31 mai 2015,

In BALANCE, the companies Hep-Art, Pharmacell and BioPredic join forces with academic partners Amsterdam Medical Centre and University of Edinburgh to offer Acute Liver Failure (ALF) patients a bioartificial liver-support system for bridging the waiting period for liver transplantation or recovery of the diseased liver.ALF is a highly lethal disorder and liver transplantation is the only life-savi ...
Voir le projet

 5

 TERMINÉ 

Small-molecule Inhibitor Leads Versus emerging and neglected RNA viruses (SILVER)

Date du début: 1 oct. 2010, Date de fin: 31 mars 2015,

...m of Europe’s and Asia’s leading molecular virologists, structural biologists, medicinal chemists and bioinformaticians has been brought together to generate a state-of-the-art drug discovery and design programme. The project aims to identify Small molecule Inhibitor Leads Versus Emerging and neglected RNA viruses (SILVER). It will focus its activities on selected medically important RNA viruses f ...
Voir le projet

 25

 TERMINÉ 

Socio economic effects of management measures of the future CFP (SOCIOEC)

Date du début: 1 mars 2012, Date de fin: 28 févr. 2015,

SOCIOEC is an interdisciplinary, European wide project bringing together scientists from several fisheries sciences with industry partners and other key stakeholders to work in an integrated manner on solutions for future fisheries management, that can be implemented at a regional level. The central concept is to provide a mechanism for developing measures that are consistent with the overarching ...
Voir le projet

 26

 TERMINÉ 
Virus infections remain a major cause of disease, with dramatic costs in mortality, morbidity, and economic loss worldwide. There is an unmet need for potent antiviral drugs, in particular against viruses with a (+)RNA genome which include many important pathogens of humans and animals.Antiviral drug development requires a detailed understanding of virus replication and effective translation of th ...
Voir le projet

 12

 TERMINÉ 

Citadel...on the move (CITADEL)

Date du début: 1 nov. 2011, Date de fin: 31 janv. 2015,

Citadel on the Move will unite Europe's leading local government organizations with Living Lab experts, ICT specialists and expert SMEs in a common effort to harness the power of 'Open Data' and User-Driven Innovation Systems to develop 'high speed' Mobile Applications that can be shared by citizens across Europe.Nowadays, mobile phones are widely used and hold the key to ensure e-inclusion of eve ...
Voir le projet

 14

 TERMINÉ 

VISION ADVANCED INFRASTRUCTURE FOR RESEARCH (VISIONAIR)

Date du début: 1 févr. 2011, Date de fin: 31 janv. 2015,

... project of creation of a European infrastructure that should be a unique, visible and attractive entry towards high level visualisation facilities. These facilities must be open to the access of a wide set of research communities. By integrating existing facilities, it will create a world-class research infrastructure enabling to conduct frontier research. This integration will provide a signific ...
Voir le projet

 27

 TERMINÉ 

Cost Competitive Component integration for StatiOnary Fuel Cell power (C3SOFC)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2014,

"Solid oxide fuel cells for stationary power have been researched since the late 1980s as potentially high efficiency and environmentally friendly means to generate electricity. Since that time substantial progress has been made however obstacles remain to reach industrial exploitation.For end users, the cost of electricity not only the cost of the fuel cell is of primary concern. This cost is dri ...
Voir le projet

 6

 TERMINÉ 
... services in Europe in HYDRALAB IV. Over the course of 10 years our network has grown from 8 participants in 1997 to a total of 30 participants from 15 countries today.Research in our infrastructures deals with complex questions regarding the interaction of water with environmental elements, sediment, structures and ice and goes beyond just hydraulic research: hence we have adopted the theme More ...
Voir le projet

 22

 TERMINÉ 

Smart Maintenance and Analysis of Transport Infrastructure (SMART RAIL)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

...rkets in the East. This is central to European transport, economic and environmental policy. Many parts of Europe’s rail network were constructed in the mid 19th century long before the advent of modern construction standards. Historic levels of low investment, poor maintenance strategies and the deleterious effects of climate change (for example scour of bridge foundations due to flooding and rai ...
Voir le projet

 15

 TERMINÉ 

Cathode Subsystem Development and Optimisation (CATION)

Date du début: 1 janv. 2011, Date de fin: 30 juin 2014,

The main objectives of this proposal is to evaluate different process alternatives and find optimal process and mechanical solutions for the cathode and stack subsystems with the aim of having commercially feasible and technologically optimised subsystem solutions ready for future ~ 250 kWe atmospheric SOFC systems. The aspects taken into account in the development are mainly electrical efficiency ...
Voir le projet

 8

 TERMINÉ 
Fusepool develops an user-adaptive «Living Knowledge Pool» for product development and research. Compared to existing search and knowledge management solutions, Fusepool provides two core benefits: the automated transformation of content from web-harvesting and participating organizations into structured Linked Open Data format and the automated group-specific optimization of knowledge finding and ...
Voir le projet

 8

 TERMINÉ 
...National Research Programmes in the Area of Security at Major Events – THE HOUSE is aimed at strengthening the ERA on Major Events security by applying the research coordination tools/methodologies developed during seven years of activity within the projects EU-SEC and EU-SEC II. THE HOUSE builds on the assumption that Major Events are “windows of opportunity” to increase inter-agency/intra-agency ...
Voir le projet

 25