Rechercher des projets européens

12 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

European Prevention of Alzheimer’s Dementia Consortium (EPAD)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

Background:The secondary prevention of Alzheimer’s dementia (AD) is achievable if we can identify individuals at risk of disease progression defined by biomarker evidence of AD pathology and no or only minimal clinical symptoms and engage them in a standing adaptive clinical trial, of the highest quality, testing multiple interventions. To achieve this, EPAD will also provide the analytical infras ...
Voir le projet

 40

 TERMINÉ 

Development of advanced catalysts for PEMFC automotive applications (NANO-CAT)

Date du début: 1 mai 2013, Date de fin: 31 janv. 2017,

Many efforts have been put on the reduction of the Pt loading but nowadays a threshold seems to be obtained. Because the kinetics of the Hydrogen Oxidation Reaction is very fast on Pt, it is possible to use MEA with a Pt loading as low as 35 µgPt/cm-2 without any effect on the voltage loss when such an anode is used in front of a well working cathode. But, the Oxygen Reduction Reaction kinetics is ...
Voir le projet

 8

 TERMINÉ 
Environmental wellbeing backed by increasingly severe legislation dictates that pollution and energy consumption by automobiles must be reduced significantly. The outcomes of this project will enable both these imperatives to be achieved simultaneously. The project aim is to establish production lines in Europe that manufacture components for lightweight complex-shaped automobile body structures ...
Voir le projet

 16

 TERMINÉ 

Cobalt and lanthanide recovery from batteries (COLABATS)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

"The COLABATS project will provide new industrial processes for the recycling of the critical metals Cobalt and Lanthanides and key economic metals Nickel and Lithium, from waste batteries, significantly improving recycling efficiencies and metal purity from existing recovery routes. Primarily Li-ion and NiMH will be targeted using novel task specific ionic liquids (TSILs) to selectively extract t ...
Voir le projet

 10

 TERMINÉ 
The aim of the project is the development of a prototype of a water treatment system -based on the sequential combination of three technologies: electrocoagulation, electrooxidation and a technology for the recovery of generated hydrogen for energy saving and the reutilization of the resulting regenerated water for different applications - more efficient in terms of wastewater treatment and self-s ...
Voir le projet

 11

 TERMINÉ 

Development of NEXT GENeration cost efficient automotive CATalysts (NEXT-GEN-CAT)

Date du début: 1 févr. 2012, Date de fin: 31 janv. 2016,

The main objective of NEXTGENCAT proposal is the development of novel eco-friendly nano-structured automotive catalysts utilizing transition metal nanoparticles (Cu, Ni, Co Zn, Fe etc) that can partially or completely replace the PGMs. Based on nanotechnology, low cost nanoparticles will be incorporated into different substrates, including advanced ceramics (SiO2, perovskite etc) and silicon carbi ...
Voir le projet

 11

 TERMINÉ 
Anthocyanins are health promoting dietary polyphenols that protect against cardiovascular disease, caner and obesity in preclinical studies with animals. The ATHENA project will address how good dietary anthocyanins are in protecting against chronic disease, by addressing the following questions: • Benefits and risks: What is the dose response to anthocyanin phytonutrients? Are anthocyanins from d ...
Voir le projet

 14

 TERMINÉ 

NOUVELLE DONNE POUR L'INNOVATION - NEW DEAL FOR INNOVATION (N.D.I)

Date du début: 31 janv. 2010, Date de fin: 29 juin 2015,

The NDI project, which brings together seven partners, will develop support tools in order to facilitate innovation and development amongst SMEs and micro-businesses.In order to understand innovation mechanisms in small businesses, it will draw up a status report and a comparative study of 550 businesses.An innovators kit including a set of practical and methodological tools will be put together a ...
Voir le projet

 6

 TERMINÉ 
Europe’s pine forests are a valuable economic, social and environmental resource under threat from the introduction of the pine wood nematode (PWN), Bursaphelenchus xylophilus. Although not a pest in its native North America, PWN has devastated forests in Asia. Since the arrival of PWN in Portugal, the native maritime pine, Pinus pinaster, has proved to be extremely susceptible, with PWN being s ...
Voir le projet

 13

 TERMINÉ 

Optimised storage integration for the electric car (OSTLER)

Date du début: 1 juin 2011, Date de fin: 30 nov. 2014,

Present-day electric vehicles are typically designed by starting from an existing vehicle platform and designing a storage device (battery pack) to fit the constraints of the existing vehicle. OSTLER is based on the concept of modular storage devices around which an electric vehicle (EV) can be designed. The vehicle designer can select storage capacity to give range in EV mode (e.g. 20 km, 50 km, ...
Voir le projet

 9

 TERMINÉ 
Africa is probably the most vulnerable continent to climate change and climate variability and shows diverse range of agro-ecological and geographical features. Thus the impacts of climate change can be very high and will greatly differ across the continent, and even within countries. There is a urgent need for the most appropriate and up-to-date tools to better understand and predict climate chan ...
Voir le projet

 20

 TERMINÉ 

Investigation of Si wafer damage in manufacturing processes (SIDAM)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2011,

Wafer handling in semiconductor manufacturing introduces microcracks at the wafer edge. During thermal processing, some of these grow into slip bands; on rapid thermal processing some of these grow into cracks, shattering the wafer and disrupting manufacture. Dense slip bands also lead to yield loss by locally increasing diffusion rates. Breakage losses alone were of the order of €2.5M p.a. for a ...
Voir le projet

 8