Rechercher des projets européens

39 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Simulation Supported Real Time Energy Management in Building Blocks (Sim4Blocks)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

The growing share of variable renewable energy necessitates flexibility in the electricity system, which flexible energy generation, demand side participation and energy storage systems can provide. SIMBLOCK will develop innovative demand response (DR) services for smaller residential and commercial customers, implement and test these services in three pilot sites and transfer successful DR models ...
Voir le projet

 17

 TERMINÉ 

Analysis System for Gathered Raw Data (ASGARD)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Voir le projet

 34

 TERMINÉ 

Renewables in a Stable Electric Grid (RE-SERVE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

Future energy systems will use renewable energy sources to minimise CO2 emissions. Currently large generators powered by fossil fuel turbines maintain the stability and quality of energy supplies through their inertia. The inertia of these generator-turbine groups gives providers a significant time window in which to react to network events. We urgently need to find ways to stabilise energy sys ...
Voir le projet

 11

 TERMINÉ 

Integrated Technology Ecosystem for ProACTive Patient Centred Care (ProACT)

Date du début: 1 janv. 2016, Date de fin: 30 juin 2019,

ProACT targets Europe’s 50 million multimorbid patients to proactively self-manage and offset the EU’s annual €700billion cost of chronic disease management. ProACT aims at providing and evaluating an open application programming interface to integrate a variety of new and existing technologies to advance ‘home based’ integrated care (IC). Cloud based data analytics will determine correlations bet ...
Voir le projet

 14

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 
The TBVAC2020 proposal builds on the highly successful and long-standing collaborations in subsequent EC-FP5-, FP6- and FP7-funded TB vaccine and biomarker projects, but also brings in a large number of new key partners from excellent laboratories from Europe, USA, Asia, Africa and Australia, many of which are global leaders in the TB field. This was initiated by launching an open call for Express ...
Voir le projet

 49

 TERMINÉ 

Variety, Veracity, VaLue: Handling the Multiplicity of Urban Sensors (VaVeL)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

Urban environments are awash with data from fixed and mobile sensors and monitoring infrastructures from public, private, or industry sources. Making such data useful would enable developing novel big data applications to benefit the citizens of Europe in areas such as transportation, infrastructures, and crime prevention. Urban data is heterogeneous, noisy, and unlabeled, which severely reduces ...
Voir le projet

 10

 TERMINÉ 

Models of Child Health Appraised (MOCHA)

Date du début: 1 juin 2015, Date de fin: 30 nov. 2018,

Children’s health affects the future of Europe – children are citizens, future workers, parents and carers. Children are dependent on society to provide effective health services (UN Convention on the Rights of the Child). Models of child primary health care vary widely across Europe based on two broad alternatives (primary care paediatricians or generic family doctors), and a variety of models of ...
Voir le projet

 20

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
Rapidly developing markets such as green construction, energy harvesting and storage, advanced materials for aerospace, electronics, medical implants and environmental remediation are potential key application targets for nanomaterials. There, nanotechnology has the potential to make qualitative improvements or indeed even to enable the technology. Impacts range from increased efficiency of energy ...
Voir le projet

 26

 TERMINÉ 

Sustainable Innovative Mobilisation of Wood (SIMWOOD)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2017,

"SIMWOOD presents a novel idea for an innovative, integrated approach to multifunctional forestry and enhanced wood mobilisation across European forest regions. The project targets a multitude of forest owners and stakeholders to spread integrated, transferable solutions and viable policies to unlock immobile forest resources and ensure sustainable forest functions. A novel pan-European Informatio ...
Voir le projet

 29

 TERMINÉ 

CI-NERGY Smart cities with sustainable energy systems (CI-NERGY)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The CI-NERGY Marie Curie Initial Training Network (ITN) aims to train young scientists to develop urban decision making and operational optimisation software tools to minimise non-renewable energy use in cities. The training will be carried out by a close collaboration of six of the best academic research centres and four leading industrial companies from the energy and software technology sector ...
Voir le projet

 11

 TERMINÉ 

Transitioning towards Urban Resilience and Sustainability (TURAS)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2016,

The “TURaS” project aims to bring together urban communities, researchers, local authorities and SMEs to research, develop, demonstrate and disseminate transition strategies and scenarios to enable European cities and their rural interfaces to build vitally-needed resilience in the face of significant sustainability challenges. To ensure maximum impact, the TURaS project has developed an innovati ...
Voir le projet

 34

 TERMINÉ 
NutriTech will build on the foundations of traditional human nutrition research using cutting-edge analytical technologies and methods to comprehensively evaluate the diet-health relationship and critically assess their usefulness for the future of nutrition research and human well-being. Technologies include genomics, transcriptomics, proteomics, metabolomics, laser scanning cytometry, NMR based ...
Voir le projet

 25

 TERMINÉ 

ASSET: Analysing and Striking the Sensitivities of Embryonal Tumours (ASSET)

Date du début: 1 nov. 2010, Date de fin: 30 avr. 2016,

Cancer is hallmarked by multiple genetic aberrations that lead to a functional derangement of cellular signalling networks. Embryonal tumours (ETs) comprising neuroblastoma, medulloblastoma and Ewing sarcoma, occur early in life, and thus may reveal pathogenetically relevant lesions clearer than adulthood tumours which carry passenger mutations accumulated during life. ASSET will exploit this fact ...
Voir le projet

 20

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
The central goal of our proposal is to develop physically justified models and computational tools to quantitatively describe and understand the molecular mechanisms of nanoparticle-cell membrane interactions, which we consider to be a crucial point in any predictive model of nanoparticle toxicity. We consider mechanisms of nanoparticle protein corona formation, the protective function of the memb ...
Voir le projet

 4

 TERMINÉ 

TRANSLATIONAL RESEARCH AND PATIENT SAFETY IN EUROPE (TRANSFoRm)

Date du début: 1 mars 2010, Date de fin: 30 nov. 2015,

TRANSFoRm will develop rigorous, generic methods for the integration of Primary Care clinical and research activities, to support patient safety and clinical research via:1.\tRich capture of clinical data, including symptoms and signs rather than just a single diagnosis. A generic, dynamic interface, integrated with electronic health records (EHR), will facilitate both diagnostic decision support ...
Voir le projet

 25

 TERMINÉ 

Managing Risks of Nanoparticles (MARINA)

Date du début: 1 nov. 2011, Date de fin: 31 oct. 2015,

While there are standard procedures for product life cycle analysis, exposure, hazard, and risk assessment for traditional chemicals, is not yet clear how these procedures need to be modified to address all the novel properties of nanomaterials. There is a need to develop specific reference methods for all the main steps in managing the potential risk of ENM. The aim of MARINA is to develop such ...
Voir le projet

 54

 TERMINÉ 

Optimization of Perennial Grasses for Biomass Production (OPTIMA)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2015,

OPTIMA will integrate an ambitious biology system approach for perennial grasses such as switchgrass, miscanthus and giant reed in the Mediterranean environment. Moreover the perennial species cardoon, which has been proven to be particularly adapted to the Mediterranean climate, will be used as a control species.The main objective of the OPTIMA project is to identify high-yielding perennial grass ...
Voir le projet

 21

 TERMINÉ 
...agement, and emergency response. A large collection of data sets of different types ranging from Twitter to Traffic Flow Sensing and Mobile Phone Data are available and in use by the project partners Dublin City Council, German Federal Office of Disaster Assistance BBK, Fraunhofer, University of Athens and Technion. Their value will be enhanced by data analysis and data fusion. Geographically and ...
Voir le projet

 8

 TERMINÉ 

Energetic Algae (EnAlgae)

Date du début: 31 oct. 2009, Date de fin: 29 juin 2015,

Aim Energetic Algae aims to reduce CO2 emissions and dependency on unsustainable energy sources in NWE. by accelerating the development of sustainable technologies for algal biomass production. bioenergy and greenhouse gas (GHG) mitigation from pilot phase to application and marketable products. processes and services. This is achieved by bundling know-how. finance and political support. The plan ...
Voir le projet

 21

 TERMINÉ 

Nanotechnology: Training Of Experts in Safety (NANOTOES)

Date du début: 1 nov. 2010, Date de fin: 28 févr. 2015,

Life Sciences and Nano Sciences interact today mainly in two areas: in the evaluation of accidental health and environmental effects derived from engineered nanomaterials, and in development and biological/clinical evaluation of nanoparticles with intended biological effects for application in medicine and biotechnology. It is essential for producers, distributors, consumers and regulators that th ...
Voir le projet

 12

 TERMINÉ 
eGovPoliNet sets up an international community in ICT solutions for governance and policy modelling. The international community of researchers and practitioners will share and advance research and insights from practical cases around the world. To achieve this, eGovPoliNet will build on experiences accumulated by leading actors bringing together the innovative knowledge of the field. Capabilities ...
Voir le projet

 20

 TERMINÉ 
NAMDIATREAM will develop a cutting edge nanotechnology-based toolkit for multi-modal detection of biomarkers of most common cancer types and cancer metastases, permitting identification of cells indicative of early disease onset in a high-specificity and throughput format in clinical, laboratory and point-of-care devices. The project is built on the innovative concepts of super-sensitive and highl ...
Voir le projet

 24

 TERMINÉ 
Description Digital heritage and semantic web technologies hold out the promise of nearly unlimited access to cultural knowledge. The problem is that cultural meaning does not reside in individual objects but in the patterns of knowledge and events, belief and thought that link them to each other and to the observer. This is why story is so ...
Voir le projet

 8

 TERMINÉ 

Holistic Platform Design for Smart Buildings of the Future Internet (HOBNET)

Date du début: 1 juin 2010, Date de fin: 30 juin 2013,

The main objective of HOBNET is to ease and maximize the use of FIRE platforms by multidisciplinary developers of Future Internet applications focused on automation and energy efficiency for smart/green buildings.The proposed research addresses algorithmic, networking and application development aspects of Future Internet systems of tiny embedded devices: a) an all IPv6/6LoWPAN infrastructure of b ...
Voir le projet

 7

 TERMINÉ 

Technology Transfer Research Results Atlantic Area (2XTRA)

Date du début: 30 sept. 2003, Date de fin: 29 sept. 2006,

De nos jours, l’innovation est vitale pour le développement socio-économique. Le paradoxe européen est que l’on observe des difficultés à mettre l’innovation sur le marché alors que le niveau scientifique et technologique est élevé. Le processus de transfert de technologie en Europe fonctionne par conséquent moins bien qu’aux Etats Unis ou au Japon. 2XTRA est une proposition ambitieuse résultant d ...
Voir le projet

 13

 TERMINÉ 
EMAIL III is an Erasmus Mundus Action II project for the cooperation of higher education institutions from the EU and Israel. The consortium consists of 18 full partners and 4 associated partners, from Israel 8 HEIs and 1 NGO in the role of associated partner, from the EU, 10 HEIs and 3 associated partners (2 university networks and 1 NGO).The main activity of EMAIL III is the mobility exchange be ...
Voir le projet

 22

 TERMINÉ 
EUPHRATES Project emerges as a proposal with a wide geographical scope, covering 9 states of Europe and 11 institutions from different parts of the Indian Country. This consortium will join efforts in order to enhance cooperation for fostering excellence in training and research, promoting exchange of students and researchers between India and the EU. The Universidade de Santiago de Compostela w ...
Voir le projet

 27

 TERMINÉ 

Chinese with Audio Technologies

Date du début: 1 nov. 2010,

ChAT aims to address a major obstacle faced by learners of Chinese - mastery of the tonal system, by the principled application of audio technologies developed in the Dublin Institute of Technology. This problem is not adequately addressed by current courses.The materials produced will be playable in a web-based Virtual Learning Environment. The technologies adopted will allow for the development ...
Voir le projet

 6

 TERMINÉ 
To strengthen capacity for higher education structural reform in Western Balkan countries and facilitate a coherent convergence of the Region towards EHEA, as a prerequisite for genuine implementation of Bologna agenda. Specific Project Objectives:- To enhance Regional cooperation in higher education issues and address questions concerning coherent convergence of the Region towards EHEA, (to be la ...
Voir le projet

 24

 TERMINÉ 

S1-L11- EM Europe Asia

Date du début: 15 juil. 2010,

The Consortium is composed of partners representing eight European countries (Sweden,Italy, Poland, UK, Ireland, France, Austria, and The Netherlands) and five Asian countries(India, China, Pakistan, Nepal, and Bangladesh). When choosing partners, excellence ineducation and research have been the main criteria, but we have also taken into account theheritage from existing EMECW China and India pro ...
Voir le projet

 20

 TERMINÉ 
Preamble The foundation of an academic ERASMUS network of HEI in Europe in the filed of career guidance degree and study programs can be seen as the implementation of the recommendations of the European Commission and the OECD made on the basis of their comprehensive studies carried out in the last eight years.» The planned ERASMUS network emphasises the unique wide-ranging scientific responsibili ...
Voir le projet

 39

 TERMINÉ 
The eArchi.doc is a Virtual University Campus resulting from the collaboration of 15 Schools of Architecture geographically spread across Europe, offering Post Masters and Doctorate studies in Architecture and belonging to different architectural research cultures. The project aims to develop e-learning in the field of Architecture in Post Master and doctoral studies.
Voir le projet

 15

 TERMINÉ 
The project addresses the wood sector and intends to create a modern multimedia version of the structural timber education programme with new material and a new presentation approach, using existing technology in e-learning and adapting it to the new context of the timber education programme. The internet based material will be available at www.innovawood.com, an Internet portal for the forest and ...
Voir le projet

 13

 TERMINÉ 
The Validation of Maintenance Technicians project will develop a validation tool to make it possible to measure knowledge and proficiency in the maintenance area. The group of maintenance technicians, which is the core force for maintaining the reliable function of advanced systems in industry, will in the years to come be in short supply. This, together with the fast technical development towards ...
Voir le projet

 15

 TERMINÉ 
The GEBP network will encourage education, businesses and the community to work together for mutual benefit and will foster closer links between these parties in order to develop long-term co-operation and provide the opportunity for young people to acquire the entrepreneurial skills required for employment.The involved organisations will work together to assemble and build work-related-learning m ...
Voir le projet

 29