Rechercher des projets européens

5 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

POWERtrain for FUture Light-duty vehicles (POWERFUL)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2014,

"The Project aims to develop new powertrain concepts able to give a substantial contribution to the achievement of a 50% CO2 reduction (based on 2005 figures) for passenger cars and light-duty vehicles for the new vehicle fleet in 2020. In particular, the research target on spark ignited (SI) engines powered vehicles is to achieve 40% lower CO2 emissions with respect to the 2005 values and 20% low ...
Voir le projet

 18

 TERMINÉ 
The competitive edge of the European industry in the embedded systems domain is an enabler to achieve a leading position in the growing global market of safety-relevant embedded systems. The main success factors in this context will be the ability to understand the key reasons for the huge increase in cost and development time, and to adopt efficient methods and processes for development of these ...
Voir le projet

 24

 TERMINÉ 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Date du début: 1 avr. 2010, Date de fin: 31 mars 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Voir le projet

 40

 TERMINÉ 

Cost-Efficient Methods and Processes for Safety Relevant Embedded Systems (CESAR)

Date du début: 1 mars 2009, Date de fin: 30 juin 2012,

"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Voir le projet

 54

 TERMINÉ 

Field opErational teSts supporT Action (FESTA)

Date du début: 5 nov. 2007, Date de fin: 4 juin 2008,

The FESTA Support Action is a vital step in the realisation of scientifically robust and efficiently run Field Operational Tests which aim to evaluate key ICT functions. A consortium of European experts with a wide range of skills has been formed to allow the development of a "best-practise" handbook which will guide the design and implementation of an FOT. The consortium involves the participatio ...
Voir le projet

 21