Rechercher des projets européens

11 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
TREASURE will provide specialist training in the strategic and emerging area of European GNSS. Collectively, GNSS (Global Navigation Satellite Systems) includes systems such as the US Global Positioning System (GPS) and the Russian GLONASS, as well as the new, under development systems like China’s Beidou and most importantly Europe’s Galileo. Galileo is what we call the European GNSS (EGNSS) and ...
Voir le projet

 9

 TERMINÉ 

Next Generation GEOSS for Innovation Business (NextGEOSS)

Date du début: 1 déc. 2016, Date de fin: 31 mai 2020,

The NextGEOSS project will implement a federated data hub for access and exploitation of Earth Observation data, including user-friendly tools for data mining, discovery, access and exploitation. This data hub will be supported by a strong commitment to the engagement of Earth Observation and related communities, with the view of supporting the creation of innovative and business oriented applicat ...
Voir le projet

 27

 TERMINÉ 

Coastal Waters Research Synergy Framework (Co-ReSyF)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

The Co-ReSyF project will implement a dedicated data access and processing infrastructure, with automated tools, methods and standards to support research applications using Earth Observation (EO) data for monitoring of Coastal Waters, leveraging on the components deployed SenSyF. The main objective is to facilitate the access to Earth Observation data and pre-processing tools to the research comm ...
Voir le projet

 8

 TERMINÉ 

Operational Network of Individual Observation Nodes (ONION)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2017,

Two trends have recently emerged in space systems and could even further strengthen in the future: small satellites, with the development of key modularisation and miniaturisation technologies, and the deployment of constellations and distributed networks of satellites. It is of primordial importance for Europe to properly analyse those trends and determine whether or not they could provide a comp ...
Voir le projet

 8

 TERMINÉ 

EGNOS-GPS/GALILEO-based high-resolution terrestrial-aerial sensing system. (mapKITE)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2017,

The first objective is to build a mature prototype of a novel tandem terrestrial-aerial mapping system based on a terrestrial vehicle (TV) and on an unmanned aircraft (UA), both equipped with remote sensing payloads. The UA will follow the TV at a constant flying height above ground while geodata are acquired simultaneously from the TV and the UA. The final product is high resolution, oriented, ca ...
Voir le projet

 10

 TERMINÉ 
Biomass mapping has gained increased interest for bioenergy, climate research and mitigation activities, such as reducing emissions from deforestation and forest degradation, sustainable management of forests and enhancement of forest carbon stocks (e.g. REDD initiative).However, continuous deforestation activity and forest management requires frequent and accurate monitoring which can be expensiv ...
Voir le projet

 11

 TERMINÉ 

European GNSS-R Environmental Monitoring (E-GEM)

Date du début: 11 nov. 2013, Date de fin: 1 déc. 2016,

The E-GEM project proposes to evolve the current status of GNSS Reflectometry (GNSS-R) methods for the purpose of Earth monitoring, paving the way for operational applications in the domains of ocean altimetry and scaterometry (mainly wave height and surface winds, but also soil moisture, and biomass, monitoring of ice layers). The approach of the E-GEM project is to bring together lead experts in ...
Voir le projet

 10

 TERMINÉ 

Improving Low Earth Orbit Security With Enhanced Electric Propulsion (LEOSWEEP)

Date du début: 21 oct. 2013, Date de fin: 1 nov. 2016,

The total mass of space debris in the low Earth orbit region is estimated to be close to 2,500 tons. About half of this mass is composed by rocket upper stages clustered in high inclination orbital regions. Because they are grouped in a relatively small number of families, acquiring the capability to deorbit just a few upper stage types would lead the way towards the elimination of hundreds of ton ...
Voir le projet

 11

 TERMINÉ 

Sentinels Synergy Framework (SenSyF)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

The SenSyF project proposes a complete system for fully automated data acquisition and processing. This project will allow for the development and testing of new processing chains and methods for Sentinel and GMES contributing mission data on a continuous basis, and the delivery of higher-level products and services complementing the information provided by the (pre-)operational services.This syst ...
Voir le projet

 9

 TERMINÉ 

Advanced Techniques for Navigation Receivers and Applications (ATENEA)

Date du début: 15 janv. 2010, Date de fin: 14 janv. 2012,

"The ATENEA project aims to integrate the deeply integrated GNSS/INS receiver architectures and LIDAR techniques to provide an advanced navigation solution for a wide range of surveying applications in difficult environments. LIDAR devices geolocation and reference for the scanned observables is provided nowadays by loosely coupled GPS receivers and INS, leading to lack of performance in urban sce ...
Voir le projet

 6

 TERMINÉ 

AEROcapture for Future spAce tranSporTation (AEROFAST)

Date du début: 1 janv. 2009, Date de fin: 30 sept. 2011,

"AEROFAST main goal is to invest and improve the AEROCAPTURE transportation mean. An important step to allow for human expansion into the solar system is to develop advanced transportation systems to move humans and cargo between GEO and LEO, and also returning them from the Moon or from Mars. Typically such vehicle must rely on aerocapture to be mass effective: using atmospheric drag to slow spac ...
Voir le projet

 13