Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 

Water - Sustainable Point-Of-Use Treatment Technologies (WATERSPOUTT)

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

The WHO estimates that in 2015 in Africa ~156 million people relied on untreated sources for their drinking water. WATERSPOUTT will design, develop, pilot and field-test a range of, sustainable point-of-use solar disinfection (SODIS) technologies that will provide affordable access to safe water to remote and vulnerable communities in Africa and elsewhere. These novel large-volume water treatment ...
Voir le projet

 18

 TERMINÉ 

Marine Ecosystem Restoration in Changing European Seas (MERCES)

Date du début: 1 juin 2016, Date de fin: 31 mai 2020,

The project MERCES is focused on the restoration of different degraded marine habitats, with the aim of: 1) assessing the potential of different technologies and approaches; 2) quantifying the returns in terms of ecosystems services and their socio-economic impacts; 3) defining the legal-policy and governance frameworks needed to optimize the effectiveness of the different restoration approaches. ...
Voir le projet

 28

 TERMINÉ 
INNOQUA will accelerate the path to market of a modular set of innovative, patent protected, award winning and scalable fully ecological sanitation solutions that address wide market needs in rural communities, for agricultural industries, for sustainable home-builders or collective housing owners and for developing countries worldwide. The modular system is based on the purification capacity of b ...
Voir le projet

 20

 TERMINÉ 
...d public/private organisations, the saving of CO2, and the increase of of RES, among other impacts.The achievement of these strategic goals will involve the four aspects addressed by LCE-02-2016: (a) Demand Response, (b) Smartening the Distribution Grid, (c) Demonstrating Energy Storage Technologies and (d) the Smart Integration of Grid Users from Transport. WiseGRID technologies and solutions wil ...
Voir le projet

 21

 TERMINÉ 
The goal of GenTree is to provide the European forestry sector with better knowledge, methods and tools for optimising the management and sustainable use of forest genetic resources (FGR) in Europe in the context of climate change and continuously evolving demands for forest products and services. To reach its goal, GenTree will make scientific, technological and implementation breakthroughs in: ( ...
Voir le projet

 22

 TERMINÉ 

Environmentally Friendly, Efficient Electric Motion (3EMOTION)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2019,

The 3EMOTION project will provide policymakers and financing institutions with the necessary arguments to invest in Fuel Cell Buses (FCB) as a cost effective strategy to accelerate the reduction of harmful local emissions while offering attractive co-modality options for commuters. By leveraging the experiences of earlier FCB demonstrations in overcoming the last technical and economic barriers, a ...
Voir le projet

 15

 TERMINÉ 

REsources from URban BIo-waSte (RES URBIS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

...cal issues (both process- and product-related), by using the appropriate combination of innovative and catalogue-proven technologies.- market analysis whitin several economic scenarios and business models for full exploitation of bio-based products (including a path forward to fill regulatory gaps).Urban bio-waste include the organic fraction of municipal solid waste (from households, restaurants, ...
Voir le projet

 22

 TERMINÉ 
...e Risk Governance framework for assessment and management of human and environmental risks of MN and MN-enabled products. The framework will be a web-based “system-of-systems” linking different models and methods for: 1) screening of apparent and perceived risks and trends in nanotechnology, 2) control banding, qualitative and fully integrated predictive quantitative risk assessment operational at ...
Voir le projet

 26

 TERMINÉ 
The MONSOON vision is to provide Process Industries with dependable tools to help achieving improvements in the efficient use and re-use of raw resources and energy.MONSOON aims at establishing a data-driven methodology supporting the exploitation of optimization potentials by applying multi-scale model based predictive controls in production processes.MONSOON features harmonized site-wide dynamic ...
Voir le projet

 11

 TERMINÉ 
KRAKEN will develop a disruptive hybrid manufacturing concept to equip SME and large industries with affordable All-in-one machine for the customised design, production/reparation and quality control of functional parts (made in aluminium, thermoset or both materials combined from 0,1m till 20m) through subtractive and novel additive technologies in vast working areas without floor space requireme ...
Voir le projet

 15

 TERMINÉ 
...oducts account for our standard of living. However, this convenience contributes in a significant way to environmental pollution, as packaging is mainly achieved by plastic materials in this case. Biodegradable packaging materials have been on the market for many decades. However, there are severe restrictions preventing their broad application in food packaging, as these materials do not provide ...
Voir le projet

 12

 TERMINÉ 
Measurement campaigns have shown major discrepancies in buildings energy performance between planned energy demand and real energy consumption, while nowadays most of the newly constructed offices buildings are equipped with BMS systems, integrating a more or less extended measurement layer providing large amounts of data. Their integration in the building management sector offers an improvement c ...
Voir le projet

 23

 TERMINÉ 

Architecture for EurOpean Logistics Information eXchange (AEOLIX)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Supply chain visibility supported by easy access to, and exchange and use of relevant and abundant logistics-related information is an important prerequisite for the deployment of pan-European logistics solutions that are needed to increase efficiency and productivity, and to reduce environmental impact. Although there is a proliferative development of logistics-related data stores, information ch ...
Voir le projet

 34

 TERMINÉ 

Breakthrough solutions for adaptable envelopes for building refurbishment (BRESAER)

Date du début: 1 févr. 2015, Date de fin: 31 juil. 2019,

The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Voir le projet

 17

 TERMINÉ 
...with at least 50% less test effort than required in classical testing. 2. Promotion of a new technique for testing of automated systems with physical sensor signal stimuli generators, which will be demonstrated for at least 3 physical stimuli generators. 3. Raising significantly the level of dependability of automated systems due to provision of a holistic test and validation platform and systemat ...
Voir le projet

 76

 TERMINÉ 

Low Energy And Near to zero emissions Ships (LeanShips)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

The specific challenge for waterborne transport call MG4.1 is, “To support developments that make new and existing vessels…more efficient and less polluting”. A sound way to support developments is, to demonstrate solutions that are sufficiently close to market so that ship owners will consider these in their future investment plans. Following this reasoning LeanShips will execute 8 demonstration ...
Voir le projet

 49

 TERMINÉ 
...nced innovation-friendly ecosystem in the Southern Mediterranean Neighborhood (SMN) based on quintuple helix and NEXUS approach. The project will enhance and support regional smart specialization and development by increasing research capacity, effective mobility of young innovators/researchers and shared knowledge to improve their participation in the EU research area. It will contribute to the e ...
Voir le projet

 25

 TERMINÉ 
Internationalization is becoming critical for an increasing number of European academic spin offs. Managers of these organizations are in a key position to effectively and strategically deal with the new challenges of the globalization of markets. The GLOBAL-SPIN project aims to develop an innovative and inclusive training tool for managers of academic spin offs on transnational entrepreneurship, ...
Voir le projet

 7

 TERMINÉ 

Ensuring the Integrity of the European food chain (FOODINTEGRITY)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2018,

Food Integrity “the state of being whole, entire, or undiminished or in perfect condition”.Providing assurance to consumers and other stakeholders about the safety, authenticity and quality of European food (integrity) is of prime importance in adding value to the European Agri-food economy. The integrity of European foods is under constant threat from fraudulently labelled imitations that try to ...
Voir le projet

 64

 TERMINÉ 
Crisis incidents result in difficult working conditions for Urban Search-and-Rescue (USaR) crews. INACHUS aims to achieve a significant time reduction and increase efficiency in USaR operations by providing:1.Simulation tools for estimating the locations of survival spaces (after a structural collapse) and identify the location of survivors for different construction types and building materials2. ...
Voir le projet

 21

 TERMINÉ 

AGROVEGA+

Date du début: 7 nov. 2016, Date de fin: 6 nov. 2018,

In line with the objectives of the Europe2020 Strategy and ET2020, through "AGROVEGA+", the consortium, led by the Lora del Rio Council, aims to improve the quality of education and vocational training, giving a European dimension to the educational paths and thus providing the young participants the opportunity to test and improve their skills: professionalism in the specific areas of vocational ...
Voir le projet

 38

 TERMINÉ 

European Clearing House for Open Robotics Development Plus Plus (ECHORD Plus Plus)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2018,

Description ECHORD++ will create new opportunities for European robotics researchers to work directly with SME/start-ups and new users/customers to create innovative products. ECHORD++ will continue ECHORD’s two pillars, “experiments” and “structured dialogue”, taking advantage of experience and investment in the infrastructure. In addition, ...
Voir le projet

 68

 TERMINÉ 

LA CIUDAD DE LOS 100 PALACIOS

Date du début: 1 sept. 2016, Date de fin: 31 août 2018,

It is the 10th project of mobility that the city of El Puerto de Santa María presents in consecutive calls (previously LLP, now ERASMUS +). This time, like last year, the City Council is supported by a group of first-rate schools, having the quality of sending partners and that are going to participate in all phases of project implementation. These sending partners are the Institute of Secondary E ...
Voir le projet

 19

 TERMINÉ 
Taking into account the fact that buildings constitute the largest end-use energy consuming sector, the design and development of solutions targeted at reducing their energy consumption based on the adoption of energy efficient techniques and the active engagement of citizens/occupants is considered crucial. Innovative solutions have to be implemented upon properly understanding the main energy co ...
Voir le projet

 9

 TERMINÉ 
Underwater operations (e.g. oil industry) are demanding and costly activities for which ROV based setups are often deployed in addition to deep divers – contributing to operations risks and costs cutting.However the operation of a ROV requires significant off-shore dedicated manpower – such a setup typically requires a crew consisting of: (1) an intendant, (2) an operator, and (3) a navigator. Thi ...
Voir le projet

 7

 TERMINÉ 

Smart and Networking UnderWAter Robots in Cooperation Meshes (SWARMs)

Date du début: 1 juil. 2015, Date de fin: 30 juin 2018,

Nowadays, the major part of offshore operations is done by divers in dangerous missions. Since their number is limited, the dependency on their work represents a real threat to the offshore industry. The extended use of unmanned underwater vehicles (AUVs/ROVs) could solve this problem but since they are usually tailor-made for a specific task and difficult to operate their deployment is very expen ...
Voir le projet

 31

 TERMINÉ 

PROYECTO EUROPA "JULIAN SANZ DEL RÍO" II

Date du début: 20 déc. 2016, Date de fin: 19 juin 2018,

PROYECTO EUROPA II is the project driven by the City Council of Soria as project coordinator. The City Council, aware of the importance of young people in the life and future of the city, has determined the need to focus on them. For this reason the city believes that it is essential to provide young people with quality training that is complemented with a formative stay in another EU country, and ...
Voir le projet

 17

 TERMINÉ 

Take Control (TaCo)

Date du début: 20 juin 2016, Date de fin: 19 juin 2018,

TACO aims to define an automated system sufficiently powerful to both accomplish complex tasks involved in the management of surface movements in a major airport and self-assess its own ability to deal with non-nominal conditions. When needed, such system should be sensitive enough to transfer responsibilities for traffic management back to the controller, in a timely and graceful manner and in wa ...
Voir le projet

 3

 TERMINÉ 

MOINHOS III – FORMAR PARA INOVAR

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

...d in 2014 by the Municipality of Torres Vedras and several vocational schools in the municipality, following the unofficial collaboration that already existed in the programme Leonardo da Vinci, in order to participate in the programme Erasmus +. In 2015, given the success and acceptance by the community of MOINHOS I, the Consortium has been extended by integrating two schools of regular teaching ...
Voir le projet

 24

 TERMINÉ 

Opening the cycling and walking tracking potential (TRACE)

Date du début: 1 juin 2015, Date de fin: 31 mai 2018,

...s and their potential to bring new features in the fields of awareness raising, financial/tax incentives, infrastructure planning and service concepts. A common, flexible and open access tool will be developed to provide an ICT input and output platform that addresses the related ICT challenges. Over this platform it will be easy for anyone to build products based on tracking services tailored to ...
Voir le projet

 12

 TERMINÉ 
...allenges for freight transport and service trips, both in terms of goods distribution and service allocation performance, and environmental impacts (air emission, traffic congestion, road safety, accidents and noise). The salient scope of the proposal is the enabling of knowledge and understanding of freight distribution and service trips by providing guidance for implementing effective and sustai ...
Voir le projet

 28

 TERMINÉ 
Maritime disasters in recent years are a stark reminder of the imperative need for timely and effective evacuation of large passenger ships during emergency. The Lynceus2Market project addresses this challenge through delivering a revolutionary operational system for safe evacuation based on innovative people localisation technologies.The system consists of: 1) Localisable life jackets that can pr ...
Voir le projet

 16

 TERMINÉ 

European Bus System of the Future 2 (EBSF_2)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

...lidation before their introduction in the market, avoiding pure simulations or large use of prototypes. Following the System Approach, and with the participation of representatives of all key stakeholders categories, these activities will be introduced by the identification of innovation requirements (that will drive the impact assessment), the update of the Bus System Definition (as defined in EB ...
Voir le projet

 43

 TERMINÉ 

City Logistics in Living Laboratories (CITYLAB)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

...e and service trips in urban areas impose negative traffic and environmental impacts, and there is a need for further roll-out of cost-effective and sustainable solutions. The CITYLAB objective is to develop knowledge and solutions that result in roll-out, up-scaling and further implementation of cost effective strategies, measures and tools for emission free city logistics in urban centres by 203 ...
Voir le projet

 25

 TERMINÉ 

5G Exchange (5GEx)

Date du début: 1 oct. 2015, Date de fin: 31 mars 2018,

...ngle administrations. This will allow end-to-end network and service elements to mix in multi-vendor, heterogeneous technology and resource environments. Market fragmentation has resulted in a multitude of network operators each focused on different countries and regions. This makes it difficult to create infrastructure services spanning multiple countries, such as virtual connectivity or compute ...
Voir le projet

 20

 TERMINÉ 

Energy Performance Contracting Plus (EPC_PLUS)

Date du début: 1 mars 2015, Date de fin: 28 févr. 2018,

...is generally looked upon favourably, but its implementation can be complicated and lengthy. The reason lies mainly in the procurement law provisions and the long-term and complex contracts, which impede a real breakthrough in the spread of the EPC methodology. The other main barriers for the implementation of EPC in SMEs are:• The transaction costs for procuring energy services are too high• Inves ...
Voir le projet

 13

 TERMINÉ 
... of electric vehicles in the mobility and transportation system, focusing primarily on dynamic wireless charging which would allow practically all of the drawbacks of on-board battery packs to be avoided. On-road charging would also enable the direct link to renewable energy sources: Ultimately this is the only way to fully decarbonise road transport and hence provide true sustainability from the ...
Voir le projet

 27

 TERMINÉ 
The ehcoBUTLER Idea:Nowadays, it is a fact that Europe is ageing. A common characteristic of elders is the frequent occurrence of either physical or mild cognitive impairments. This situation brings new challenges in how to improve the independence and quality of life of elderly people and promote their good health in different ways. The ehcoBUTLER project addresses this challenge by developing an ...
Voir le projet

 14

 TERMINÉ 
In European Union approximately 5 million people suffer from psychotic disorders. Between 30-50% can be considered resistant to treatment, and 10-20% ultra-resistant. These patients present persistent positive symptomatology, require extensive periods of hospital care, and have a greater risk of excess mortality and multi-morbidity. In addition, a high proportion of the total cost for treating sch ...
Voir le projet

 15