Rechercher des projets européens

5 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The establishment of good governance will effectively secure the confidence of the industry to use the Interoperability Framework (IF) semantic technologies that will be established under the IP4 Shift2Rail program. The objective of the Governance of the IF for Rail and Intermodal Mobility (GoF4R) project is to define sustainable governance for the IF that will create the right conditions to intro ...
Voir le projet

 16

 TERMINÉ 

Semantic Transformations for Rail Transportation (ST4RT)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

The objective of the proposal is research in semantic, ontology based automation of transformations between heterogeneous data formats, and its application to a complex ‘after-sales’ process use case in an actual run-time demonstration scenario. The technology will leverage Shift2Rail Interoperability Framework (IF) components developed in the IT2Rail “lighthouse” project, extending it for use in ...
Voir le projet

 8

 TERMINÉ 

Satellite Technology for Advanced Railway Signalling (STARS)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2018,

The STARS project paves the way for the future EGNSS deployment in safety relevant railway applications. By evolving the highly developed and deployed ERTMS standard through the implementation of the satellite positioning functionality, it will be possible to reduce the cost of the future railway signalling systems, especially for lines with lower traffic density. The project deals with three main ...
Voir le projet

 18

 TERMINÉ 

INFORMATION TECHNOLOGIES FOR SHIFT TO RAIL (IT2RAIL)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2017,

The IT²RAIL -“Information Technologies for Shift to rail” proposal, first step towards the long term IP4 -“IT for an Attractive Railway” SHIFT²RAIL Innovation Programme, aims at providing a new seamless travel experience, giving access to a complete multimodal travel offer which connects the first and last mile to long distance journeys.This is achieved through the introduction of a ground breakin ...
Voir le projet

 33

 TERMINÉ 

Next Generation Train Control (NGTC)

Date du début: 1 sept. 2013, Date de fin: 28 févr. 2017,

The main scope of this Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both ETCS and CBTC systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ...
Voir le projet

 21