Rechercher des projets européens

5 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
"NEEDS and CONCEPTS: Structural Health Monitoring (SHM) will be very important for Aeronautics. A study from Goodrich stated: "Structural Health Monitoring shows a great potential in terms of cost savings coming from the benefits it would have on inspections which are currently about 25% of the Life Cycle Cost of an airline". Some applications are intended to explore the “out-of-flight domain” con ...
Voir le projet

 16

 TERMINÉ 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Voir le projet

 59

 TERMINÉ 

EXTreme ICing Environement (EXTICE)

Date du début: 1 juin 2008, Date de fin: 31 mai 2012,

"More recent aircraft incidents and accidents have highlighted the existence of icing cloud characteristics beyond the actual certification envelope defined by the JAR/FAR Appendix C, which accounts for an icing envelope characterized by water droplet diameters up to 50 μm (so-called cloud droplet). The main concern is the presence of super-cooled large droplets (SLD) such as freezing drizzle, in ...
Voir le projet

 14

 TERMINÉ 

valiDation of Radical Engine Architecture systeMs (DREAM)

Date du début: 1 févr. 2008, Date de fin: 31 janv. 2012,

"Since the publication of the ACARE goals, the commercial and political pressure to reduce CO2 has increased considerably. DREAM is the response of the aero-engine community to this pressure. The first major DREAM objective is to design, integrate and validate new engine concepts based on open rotor contra-rotating architectures to reduce fuel consumption and CO2 emissions 7% beyond the ACARE 2020 ...
Voir le projet

 46

 TERMINÉ 

AIRCRAFT INTEGRATED STRUCTURAL HEALTH ASSESSMENT II (AISHA II)

Date du début: 1 mai 2008, Date de fin: 31 oct. 2011,

"The safe use of complex engineering structures such as aircrafts can only be guaranteed when efficient means of damage assessment are in place. Whereas the design of civil structures is nowadays based on a damage tolerance approach and time based inspection cycles, it is envisaged that the large cost associated with this approach can be drastically reduced by switching to a condition based mainte ...
Voir le projet

 14