Rechercher des projets européens

4 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Engine Representative Internal Cooling Knowledge and Applications (ERICKA)

Date du début: 1 juil. 2009, Date de fin: 30 juin 2014,

"The goal of ERICKA is to directly contribute to reductions in aircraft engine fuel consumption with a targeted contribution of 1% reduction in SFC relative to engines currently in service. The fuel efficiency of a jet engine used for aircraft propulsion is dependent on the performance of many key engine components. One of the most important is the turbine whose efficiency has a large influence ...
Voir le projet

 20

 TERMINÉ 

Long-Term Advanced Propulsion Concepts and Technologies II (LAPCAT-II)

Date du début: 1 oct. 2008, Date de fin: 31 déc. 2013,

"Lacpat II is a logical follow-up of the previous EC-project which has as objective to reduce antipodal flights to less than 2 to 4 hours. Among the several studied vehicles, only two novel aircraft for a Mach 5 and 8 flight are retained in the present proposal. Starting from the available Mach 5 vehicle and its related precooled turboramjet, assumed performance figures of different components ...
Voir le projet

 16

 TERMINÉ 

European Robotic Pedestrian Assistant (EUROPA)

Date du début: 2 mars 2009, Date de fin: 29 févr. 2012,

In the field of robotics, there has recently been a tremendous progress in the development of autonomous robots that offer various services to their users. Typical services include support of elderly people, cleaning, transportation, and delivery tasks, exploration of unaccessible hazardous environments, or surveillance. Most of the systems developed so far, however, are restricted to indoor sce ...
Voir le projet

 6

 TERMINÉ 

Biaxial Nematic Devices (BIND)

Date du début: 7 févr. 2008, Date de fin: 6 févr. 2012,

The recent experimental discovery of novel biaxial liquid crystal (LC) phases is a major breakthrough in functional materials and presents a challenge to develop the technology for a new generation of faster biaxial LC displays. These expectations are based on the existence of a secondary director that can be controlled by external fields. However, to be put in practice, this new possibility requi ...
Voir le projet

 7