Rechercher des projets européens

11 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Intel-CERN European Doctorate Industrial Program (ICE-DIP)

Date du début: 1 févr. 2013, Date de fin: 31 janv. 2017,

"ICE-DIP, the Intel-CERN European Doctorate Industrial Program, is an EID scheme hosted by CERN and Intel Labs Europe. ICE-DIP offers research training to 5 Early Stage Researchers (ESRs) in advanced Information and Communication Technologies (ICT). The technical goal of this program is to research and develop, through a public-private partnership, unparalleled capabilities in the domain of high t ...
Voir le projet

 2

 TERMINÉ 
LeanBigData aims at addressing three open challenges in big data analytics: 1) The cost, in terms of resources, of scaling big data analytics for streaming and static data sources; 2) The lack of integration of existing big data management technologies and their high response time; 3) The insufficient end-user support leading to extremely lengthy big data analysis cycles. LeanBigData will address ...
Voir le projet

 11

 TERMINÉ 

Water analytics and Intelligent Sensing for Demand Optimised Management (WISDOM)

Date du début: 1 févr. 2014, Date de fin: 31 janv. 2017,

Growing water demand caused by climate change, urbanization and population growth requires new business and technology platforms to manage the increased level of diversity and complexity of urban water resources management. The increasing variability of both supply and consumption will also require more sophisticated and optimized decision making.To achieve a step change in water and energy saving ...
Voir le projet

 13

 TERMINÉ 

An integrated development environment for portable network applications (NetIDE)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

While most of programmable network gear vendors support OpenFlow nowadays, a number of fragmented control plane solutions exist for proprietary software-defined networks. Thus, network applications developers need to re-code their solutions every time they target a network infrastructure based on a different controller. Moreover, different network developers adopt different solutions as abstract c ...
Voir le projet

 10

 TERMINÉ 

Network Functions as-a-Service over Virtualised Infrastructures (T-NOVA)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

Network Functions Virtualisation (NFV) is an emerging concept, which refers to the migration of certain network functionalities, traditionally performed by hardware elements, to virtualized IT infrastructures, where they are deployed as software components. NFV leverages commodity servers and storage, including cloud platforms, to enable rapid deployment, reconfiguration and elastic scaling of net ...
Voir le projet

 19

 TERMINÉ 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Voir le projet

 13

 TERMINÉ 

European Schools enhancing creativity, exploration and science (we.learn.it)

Date du début: 1 nov. 2012, Date de fin: 28 févr. 2015,

we.learn.it will launch the European Living Learning Network by schools and for schools.we.learn.it is a facilitated grassroots initiative initially formed from school networks in 6 European countries and partnerships abroad including schools in developing countries. Linked to a facilitators network of higher education institutions, thematic organizations, experts, learning content and technology ...
Voir le projet

 9

 TERMINÉ 

Digital Preservation for Timeless Business Processes and Services (TIMBUS)

Date du début: 1 avr. 2011, Date de fin: 31 déc. 2014,

Description TIMBUS extends traditional digital preservation approaches by introducing the need to analyse and preserve services, and by aligning preservation actions with business continuity management.A primary motivation for TIMBUS is the declining use of centralised in-house business processes. Based on the concept of software as a ser ...
Voir le projet

 12

 TERMINÉ 

Production Logistics and Sustainability Cockpit (PLANTCockpit)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2013,

Today, numerous methods, systems, and tools exist to facilitate production management, optimize resource utilization, and process efficiency. However, current ERP (Enterprise Resource Planning) systems, MES (Manufacturing Execution Systems), SCADA, and special-purpose solutions are rarely integrated with each other and typically provide no more than point-to-point interfaces between selected funct ...
Voir le projet

 13

 TERMINÉ 
Manufacturing is the driving force of Europe's economy, providing over €6,553 billion in GDP. However against a background of climate change legislation, volatile energy prices and increased environmental awareness, modern manufacturing must encompass a focus on eco-efficiency. Given the current economic situation, this must be achieved without the need for large capital expenditure. Adding inform ...
Voir le projet

 15

 TERMINÉ 
Data storage technology today faces many challenges, including performance inefficiencies, inadequate dependability and integrity guarantees, limited scalability, loss of confidentiality, poor resource sharing, and increased ownership and management costs. Given the importance of both direct-attached and networked storage systems for modern applications, it becomes imperative to address these issu ...
Voir le projet

 7