Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
“Joining up Users for Maximising the Profile, the Innovation and the Necessary Globalisation of JIVE” (JUMPING JIVE) aims to prepare and position European Very Long Baseline Interferometry (VLBI) for the SKA era, and to secure the role of JIV-ERIC in the European and global landscape of Research Infrastructures. On a European scale, the proposed activities will raise the profile of JIVE among scie ...
Voir le projet

 13

 TERMINÉ 

Advanced Radio Astronomy in Europe (RadioNet)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

RadioNet is a consortium of 28 institutions in Europe, Republic of Korea and South Africa, integrating at European level world-class infrastructures for research in radio astronomy. These include radio telescopes, telescope arrays, data archives and the globally operating European Network for Very Long Baseline Interferometry (EVN). RadioNet is de facto widely regarded to represent the interests o ...
Voir le projet

 29

 TERMINÉ 

Advanced European Network of E-infrastructuresfor Astronomy with the SKA (AENEAS)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The objective of the AENEAS project is to develop a concept and design for a distributed, federated European Science Data Centre (ESDC) to support the astronomical community in achieving the scientific goals of the Square Kilometre Array (SKA). The scientific potential of the SKA radio telescope is unprecedented and represents one of the highest priorities for the international scientific communit ...
Voir le projet

 31

 TERMINÉ 
Development of fuel injection equipment (FIE) able to reduce pollutant emissions from liquid-fueled transportation and power generation systems is a top industrial priority in order to meet the forthcoming EU 2020 emission legislations. However, design of new FIE is currently constrained by the incomplete physical understanding of complex micro-scale processes, such as in-nozzle cavitation, primar ...
Voir le projet

 10

 TERMINÉ 
ROLINCAP will search, identify and test novel phase-change solvents, including aqueous and non-aqueous options, as well as phase-change packed bed and Rotating Packed Bed processes for post-combustion CO2 capture. These are high-potential technologies, still in their infancy, with initial evidence pointing to regeneration energy requirements below 2.0 GJ/ton CO2 and considerable reduction of the e ...
Voir le projet

 12

 TERMINÉ 

Genomic diagnostics beyond the sequence (BeyondSeq)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

Cytogenetic diagnostic approaches provide information on the single-chromosome level but suffer from low resolution and throughput. In contrast, next generation sequencing (NGS) based diagnostics provides single base resolution and high throughput but suffer from short reads that prevent analysis of large genomic aberrations as well as being prone to PCR-amplification bias and erasure of epigeneti ...
Voir le projet

 8

 TERMINÉ 

Drag Reduction in Turbulent Boundary Layer via Flow Control (DRAGY)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

The proposed project “Drag Reduction via Turbulent Boundary Layer Flow Control” (DRAGY) will approach the problem of turbulent drag reduction through the investigation of active/passive flow-control techniques to manipulate the drag produced by the flow structures in turbulent boundary layers. In addition, the project aims to improve the understanding of the underlying physics behind the control t ...
Voir le projet

 13

 TERMINÉ 

PROactive Safety for PEdestrians and CyclisTs (PROSPECT)

Date du début: 1 mai 2015, Date de fin: 31 oct. 2018,

...idered by UoN and IFSTTAR. Euro NCAP test labs (IDIADA, BAST, TNO) will define and validate test procedures and propose standardization to Euro NCAP and UN-ECE. Accident research will be performed by Chalmers, VTI and BME, based on major in-depth accident databases (GIDAS and IGLAD) and complemented by East Europe data. The work will be done in cooperation with experts in Japan (JARI, NTSEL) and t ...
Voir le projet

 18

 TERMINÉ 

Coordination of Automated Road Transport Deployment for Europe (CARTRE)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2018,

Automated Road Transport (ART) is seen as one of the key technologies and major technological advancements influencing and shaping our future mobility and quality of life. The ART technology encompasses passenger cars, public transport vehicles, and urban and interurban freight transport and also extends to the road, IT and telecommunication infrastructure needed to guarantee safe and efficient op ...
Voir le projet

 36

 TERMINÉ 

Innovative Intelligent Rail (IN2RAIL)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Voir le projet

 56

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 janv. 2016, Date de fin: 28 févr. 2018,

HiPEAC is a support action that aims to structure and strengthen the European academic and industrial communities in computing systems: (i) by increasing innovation awareness and by encouraging researchers to engage in innovation activities; (ii) by professionally disseminating program achievements beyond the traditional scientific venues; (iii) by producing a vision document including recommendat ...
Voir le projet

 12

 TERMINÉ 

Engine Module Validators (ENOVAL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre ...
Voir le projet

 37

 TERMINÉ 
Europe has built momentum in becoming a leader in large parts of the HPC ecosystem. It has brought together technical and business stakeholders from application developers via system software to exascale systems. Despite such gains, excellence in high performance computing systems is often fragmented and opportunities for synergy missed.To compete internationally, Europe must bring together the be ...
Voir le projet

 17

 TERMINÉ 
...t, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Universities Aalto, Bristol, Chalmers and Dresden), measurement equipment vendors (Keysight Technologies, Rohde & Schwarz) and one SME (Qamcom). To complement its strong industry leadership and academic excellence, the project ha ...
Voir le projet

 19

 TERMINÉ 

Automated Driving Applications and Technologies for Intelligent Vehicles (AdaptIVe)

Date du début: 1 janv. 2014, Date de fin: 30 juin 2017,

AdaptIVe will enhance the performance and improve the acceptance of automated driving of cars and trucks. The project develops new and integrated automated functions to improve traffic safety by minimizing the effects of human errors and to enhance traffic efficiency by smoother flows and reduced congestion.The approach is based on a shared control concept, assuring proper collaboration between th ...
Voir le projet

 32

 TERMINÉ 
Road transport is indispensable for the exchange of goods and persons, but at the same time has severe negative consequences, among others related to road safety and environment. In order to meet EU targets, both the number of road crashes and vehicle emission levels need to be reduced substantially. For identifying the next generation of measures that will enable us to actually reach these target ...
Voir le projet

 21

 TERMINÉ 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Voir le projet

 101

 TERMINÉ 

A common European approach to the regulatory testing of nanomaterials (NANOREG)

Date du début: 1 mars 2013, Date de fin: 28 févr. 2017,

The innovative and economic potential of Manufactured Nano Materials (MNMs) is threatened by a limited understanding of the related EHS issues. While toxicity data is continuously becoming available, the relevance to regulators is often unclear or unproven. The shrinking time to market of new MNM drives the need for urgent action by regulators. NANoREG is the first FP7 project to deliver the answe ...
Voir le projet

 73

 TERMINÉ 

Biomarkers For Enhanced Vaccine Safety (BIOVACSAFE)

Date du début: 1 mars 2012, Date de fin: 31 déc. 2016,

BioVacSafe is a concise consortium of selected academic, public, and SME participants used to co-working in industry-led projects, organised into focused Activity Cores to generate knowledge and tools to benchmark licensed vaccine reactogenicity, and create practical and generalizable guidelines and techniques to enhance immunosafety of novel vaccines from pre-development to post-marketing surveil ...
Voir le projet

 24

 TERMINÉ 

Field Operational Test Networking and Data Sharing Support (FOT-Net Data)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

FOT-Net Data is a Support Action for international co-operation that targets efficient sharing and re-use of global data sets. It continues European and international networking activities in the domain of Field Operational Tests (FOT).During the lifetime of the different FOTs carried out both at national and European levels, there is a crucial need for a networking platform allowing individual FO ...
Voir le projet

 11

 TERMINÉ 

Innovative continuous upgrades of high investment product-services (USE-IT-WISELY)

Date du début: 1 sept. 2013, Date de fin: 30 nov. 2016,

In the past, customers invested in high cost, long service-life products. Today, they demand complex product-services capable of adapting to new customer goals and rapidly changing markets. The Use-it-wisely project will enable European manufacturers to operate successfully within this new paradigm.The project will investigate a new business model that implements continuous product-service adaptat ...
Voir le projet

 22

 TERMINÉ 

CARBON BASED SMART SYSTEMS FOR WIRELESS APPLICATIONS (NANO RF)

Date du début: 1 sept. 2012, Date de fin: 31 mai 2016,

Description New technologies and new wireless architectures identified as Beyond CMOS and More than Moore From the strategic agendas of ENIAC,EPoSS and ITRS it is evident that wireless applications are gaining more and more importance that results to new requirements in terms of miniaturization an ...
Voir le projet

 14

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 

High Performance and Embedded Architecture and Compilation (HiPEAC)

Date du début: 1 janv. 2012, Date de fin: 29 févr. 2016,

The proposed HiPEAC network of excellence is a follow-up of an existing network and wants (i) to steer and to increase the European research in computing systems; (ii) to improve the quality of the European computing systems research, and (iii) to create a visible and integrated pan-European community in computing systems. The network is structured along four programs. The membership program aims ...
Voir le projet

 14

 TERMINÉ 

Advanced Radio Astronomy in Europe (RADIONET3)

Date du début: 1 janv. 2012, Date de fin: 31 déc. 2015,

RadioNet is an I3 that coordinates all of Europe’s leading radio astronomy facilities in an integrated cooperation to achieve transformational improvement in the quality and quantity of the scientific research of European astronomers. RadioNet3 includes 27 partners operating world-class radio telescopes and/or performing cutting-edge R&D in a wide range of technology fields important for radio ast ...
Voir le projet

 29

 TERMINÉ 

Metal supported SOFC technology for stationary and mobile applications (METSAPP)

Date du début: 1 nov. 2011, Date de fin: 31 déc. 2015,

"State of the art SOFC technology for stationary as well as for transportation application is to date being demonstrated with either planar or tubular ceramic anode-supported or electrolyte-supported SOFC cells. However, the SOFC technology faces many challenges when it comes to commercialization, since cost reduction, reliability and extended lifetime is required. In order to improve durability a ...
Voir le projet

 10

 TERMINÉ 
Current digital manufacturing ICT platforms have provided a series of tools, including CAx, PDM and PLM systems, to support engineers in a series of collaborative activities, allowing them to communicate as well as to design and validate the manufacturing processes.However, they still have a long way to go for effectively addressing engineering knowledge management issues:- Today's ERP systems are ...
Voir le projet

 14

 TERMINÉ 

Resource Efficient Maritime Capacity (REMCAP)

Date du début: 1 nov. 2012, Date de fin: 31 oct. 2015,

The global maritime market is on a strong growth trajectory, and this project aims to harness that growth to create economic and employment benefits for Europe. On the one hand, growth is driven by commercial megatrends such as demand for marine/offshore renewable energy, fish products and emerging potential for ‘blue biotech’ products; on the other hand, there is high demand for efficient use an ...
Voir le projet

 15

 TERMINÉ 

Crew-centered Design and Operations of ships and ship systems (CYCLADES)

Date du début: 1 oct. 2012, Date de fin: 30 sept. 2015,

The CyClaDes project is designed to promote the increased impact of the human element in shipping across the design and operational lifecycle. The project brings together a multi-disciplinary team to focus on all the key steps in the lifecycle; the stakeholders; where the barriers to human element integration occur; and how to best locate, produce, disseminate, and apply human element knowledge wi ...
Voir le projet

 14

 TERMINÉ 

Infrastructure for Systems Biology - Europe (ISBE)

Date du début: 1 août 2012, Date de fin: 31 juil. 2015,

The Infrastructure for Systems Biology in Europe (ISBE) programme comprises an infrastructure that is designed to meet the needs of European systems biology, in terms of development, applications and training. In order to address this requirement, we are proposing a distributed, interconnected infrastructure which primarily comprises three types of centres: Data Integration Centres (DICs), and sys ...
Voir le projet

 24

 TERMINÉ 
The objective of PARADIGM is to effect a fundamental change in the way photonic integrated circuits (PICs) based on indium phosphide (InP) are designed and manufactured in Europe, with the aim of reducing the costs of design, development and manufacture by more than an order of magnitude and making more complex and capable designs possible than ever before.The key step is to develop a generic plat ...
Voir le projet

 19

 TERMINÉ 

on-Demand System Reliability (DeSyRe)

Date du début: 1 oct. 2011, Date de fin: 31 janv. 2015,

DeSyRe will perform research on the design of future reliable Systems-on-Chip (SoCs). These are systems that guarantee continuous and correct operation in the existence of different types of faults. It is a well known fact that various systems are extremely sensitive to faults. Typical examples are medical (i.e. implantable cardiac pacemakers) or automotive systems (i.e. vehicle stability control) ...
Voir le projet

 8

 TERMINÉ 
Scientific research is no longer conducted within national boundaries and is becoming increasing dependent on the large-scale analysis of data, generated from instruments or computer simulations housed in trans-national facilities, by using e Infrastructure (distributed computing and storage resources linked by high-performance networks).The 48 month EGI-InSPIRE project will continue the transitio ...
Voir le projet

 143

 TERMINÉ 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Date du début: 1 avr. 2009, Date de fin: 30 sept. 2014,

Reducing noise from aircraft operations perceived by airport neighbouring communities is a major challenge facing the aircraft manufacturing industry, social society and the air transport business. By adopting a whole aircraft approach based on the latest developments in active / adaptive technologies, flow control techniques and advances in computational aero-acoustics applied to the major causes ...
Voir le projet

 51

 TERMINÉ 

PRACE - Second Implementation Phase Project (PRACE-2IP)

Date du début: 1 sept. 2011, Date de fin: 31 août 2014,

PRACE-2IP supports the accelerated implementation of the pan-European HPC Research Infrastructure created in April 2010 as the result of the preparatory phase PRACE project. It complements and extends the work of the PRACE-1IP project that was started in July 2010.PRACE-2IP addresses the computational and simulation needs of European scientific communities to keep them at the forefront of discover ...
Voir le projet

 50

 TERMINÉ 

Biocommodity refinery (BIOCORE)

Date du début: 1 mars 2010, Date de fin: 28 févr. 2014,

"BIOCORE will create and demonstrate create a lignocellulosic biorefinery for sustainable processing of agricultural residues (wheat and rice straws), SRC wood (poplar) and hardwood forestry residues, into 2G biofuels, bulk chemicals, polymers, speciality molecules, heat and power. To reach this overall objective, BIOCORE will: 1) Describe how a mixed lignocellulosic feedstock-based biorefinery ca ...
Voir le projet

 26

 TERMINÉ 

Clean European Rail - Diesel (CleanER-D)

Date du début: 1 juin 2009, Date de fin: 31 janv. 2014,

The study of CER, UNIFE, UIC and Euromot of the railway and engine manufacturing industries concluded on a risk of disruptive effect of the NRMM Directive application on the railway diesel vehicle supply market, leading to a possible risk of a partial modal shift from rail to road on regional passenger lines and freight transportation specialized routes, with even foreseeable consequences on the o ...
Voir le projet

 27

 TERMINÉ 

Suspended Graphene Nanostructures (RODIN)

Date du début: 1 oct. 2010, Date de fin: 30 sept. 2013,

The RODIN-project, which seamlessly integrates experimental, industrial and theoretical work, is organized around the concept of suspended single-and few-layer graphene nanostructures and annealed diamond-like carbon films. These structures are ideal for accessing and engineering the intrinsic material properties of graphene. In particular we will focus on engineering and measuring the mechanical ...
Voir le projet

 10

 TERMINÉ 

NEXPReS- Novel EXplorations Pushing Robust e-VLBI Services (NEXPReS)

Date du début: 1 juil. 2010, Date de fin: 30 juin 2013,

The objective of "Novel EXplorations Pushing Robust e-VLBI Services" (NEXPReS) is to offer enhanced scientific performance for all use of the European VLBI Network (EVN) and its partners. The proposed activities will allow the introduction of an e-VLBI component to every experiment, aiming for enhanced robustness, flexibility and sensitivity. This will boost the scientific capability of this distr ...
Voir le projet

 15