Rechercher des projets européens

4 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Objective is to develop and to demonstrate technologies and components for prefabricated modular renovation elements in five geo-clusters in Europe. This includes prefabricated durable, innovative, modular composed building envelope elements for the total building envelop for the renovation market, including the prefab integration of multifunctional components for climate control, energy saving, ...
Voir le projet

 18

 TERMINÉ 
The aim of the “School of the Future” project is to design, demonstrate, evaluate and communicate shining examples of how to reach the future high performance building level. School buildings and their primary users pupils - the next generations - are in the focus of the project. Both, the energy and indoor environment performance of 4 demo buildings in 4 European countries and climates will be gr ...
Voir le projet

 14

 TERMINÉ 

SSL for illumination of city centres and exposition buildings (ILLUMINATE)

Date du début: 1 janv. 2012, Date de fin: 30 juin 2014,

The ILLUMINATE project will assess SSL applicability and benefit as in high quality urban areas and in buildings hosting expositions and museums when light quality is un uncompromising requirement and SSL use is still problematic. By exploiting innovative lighting solutions and their integration with intelligent control systems and different innovative use of lighting as permitted by SSL (colour, ...
Voir le projet

 14

 TERMINÉ 

Cost-effective low-energy advanced sustainable so1utions (CLASS1)

Date du début: 1 nov. 2007, Date de fin: 31 oct. 2012,

The Municipality of Stenloese has decided to strengthen the energy requirements for a new settlement to be erected in the municipality. In this new settlement 650 dwellings will be constructed in the years 2007-2008 to a low-energy standard referred to as "low-energy class 1" in the Danish Building Regulations. This requirement means that the energy consumption will be 50 % below the new energy re ...
Voir le projet

 19