Rechercher des projets européens

5 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Security and quality of life in industrialized countries depend on continuous and coordinate performance of a set of infrastructures (energy systems, ICT systems, transportation etc) which can be therefore defined “critical infrastructures” (CI).“STRUCTURES - Strategies for The impRovement of critical infrastrUCTUre Resilience to Electromagnetic attackS” aims at analyzing possible effects of elect ...
Voir le projet

 13

 TERMINÉ 

in flight Trajectory optimizAtion through advanCed simulation TechnICs (TACTIC)

Date du début: 1 nov. 2013, Date de fin: 31 juil. 2015,

The Commercial and Airline Pilots are skilled to deal with their aircraft emergencies. On the contrary, when the occurrence of unusual situations, requires trajectory change during IFR navigation, pilot in command, involved in a short time analysis and synthesis, could be not able to consider all those aspects affecting the new flight trajectory negotiation.In such situations the pilot may have gr ...
Voir le projet

 2

 TERMINÉ 

Aircraft lightning thtRreat Reduction thrOugh Wiring optimization (ARROW)

Date du début: 6 mai 2013, Date de fin: 5 mars 2015,

ARROW project aims at developing a numerical methodology and a SW tool to model indirect effects of lightning on cable-harness configurations installed aboard aircrafts made of composite materials and equipped with a “current return network” (ALEEN, ALmost Equipotential Electrical Network). The Tool shall be able to:• input geometry and material properties of the aircraft and of ALEEN from CAD (C ...
Voir le projet

 4

 TERMINÉ 

optimizinG Electrical Network In AirpLane composite structures (GENIAL)

Date du début: 1 oct. 2011, Date de fin: 30 sept. 2013,

"GENIAL project aims at developing a numerical methodology and a SW tool to model the current return networks (called ALEEN, ALmost Equipotential Electrical Network) installed aboard composite aircrafts. It will be able to:- input geometry and material properties of ALEEN (including also metallic structural parts of the aircraft if any) from CAD;- accept measured data as partial characterization ...
Voir le projet

 2

 TERMINÉ 

CLEaner OPerations Attained Through Radars' Advance (CLEOPATRA)

Date du début: 11 avr. 2011, Date de fin: 10 juil. 2013,

"CLEOPATRA project aims at developing a SW procedure able to simulate relevant weather phenomena as they appear to airborne weather radars, starting from a high level description of the weather phenomenon (scenario), up to obtain the polarimetric I/Q signals at radar output. Such data have to be used as input to processing system simulation software (outside the scope of the present work) to be de ...
Voir le projet

 4