Rechercher des projets européens

6 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
The project GRAIL has been build with 15 partners from 9 different countries with the aim of finalising the solutions given previously to the valorization of glycerol and transform then in valuable products in a biorefinery approachThe overall concept of GRAIL project is the use, exploitation and further development of the state of the art in the field of bio-based products from glycerol and the d ...
Voir le projet

 16

 TERMINÉ 

Steel Coatings For Reducing Degradation in SOFC (SCORED 2:0)

Date du début: 1 juil. 2013, Date de fin: 30 juin 2017,

The economic viability and market place entry of SOFC power systems is directly dependent on their longevity and production costs. Adequate operational life spans can only be achieved, if the performance degradation of the SOFC stacks and Balance of Plant components over time can be considerably reduced. At the same time, manufacturing costs have to be lowered dramatically for the specifically nec ...
Voir le projet

 9

 TERMINÉ 

New all-European high-performance stack: design for mass production (NELLHI)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2017,

This project combines European know-how in single cells, coatings, sealing, and stack design to produce a novel 1 kW SOFC stack of unprecedented performance, together with the proof of concept of a 10 kWe SOFC stack. Improvements over the state of the art in cost, performance, efficiency, and reliability will be proven, covering all top-level objectives mentioned in the topic. The stacks will be d ...
Voir le projet

 10

 TERMINÉ 

"Solid Oxide Cell and Stack Testing, Safety and Quality Assurance" (SOCTESQA)

Date du début: 1 mai 2014, Date de fin: 30 avr. 2017,

"The main objective of the present project proposal is to develop uniform and industry wide test procedures for SOC cell/stack assembly. The proposal builds on experiences gained in the FCTESTNET, FCTESQA series of projects taking up the methodology developed there. This project proposal will address new application fields which are based on the operation of the SOFC cell/stack assembly in the fue ...
Voir le projet

 6

 TERMINÉ 

INNOVATIVE CONFIGURATION FOR A FULLY RENEWABLE HYBRID CSP PLANT (HYSOL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

Renewable energies have often problems in order to provide a stable and reliable power supply, as they often depend on meteorological circumstances that have a variable or stochastic component. This fact is often used by their detractors to favour the use of other alternatives such as fossil fuels.The main added value of the hybridisation concept will be the achievement of the Europe Strategic Ene ...
Voir le projet

 8

 TERMINÉ 
"In order to accelerate the implementation of the CSP technology, the electricity cost has to be reduced by increasing the plants’ efficiency. The HITECO Project aims at doing so by increasing the operating temperature of the heat transfer fluid (HTF) up to 600ºC and therefore raising the overall efficiency of the process. The current state-of-the-art designs are prevented to reach such temperatur ...
Voir le projet

 11