Rechercher des projets européens

18 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

TEMPORARY VERSUS PERMANENT MIGRATION (TEMPER)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2018,

"The overall objective of the TEMPER project consists of providing a comprehensive assessment of the pros and cons of recent initiatives to promote circular migration as an alternative to more traditional forms of temporary and permanent migration, not only among prospective migrants but also among current residents in the EU. These initiatives usually rely on a poor understanding of the ultimate ...
Voir le projet

 8

 TERMINÉ 

Integrated Research Programme on Wind Energy (IRPWIND)

Date du début: 1 mars 2014, Date de fin: 28 févr. 2018,

...aps that IRPWIND now proposes to bridge, with a team that gathers 24 partners and the critical mass of research performers within wind energy across Europe. Besides the research needs identified, the analysis showed a current emphasis on short to medium term research and demonstration, whereas IRPWIND clearly focuses on the medium to long term research. Openness of the programme is achieved throug ...
Voir le projet

 26

 TERMINÉ 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Voir le projet

 42

 TERMINÉ 
...e. These forecasts hold the potential for being of great value for a wide range of decision-makers who are affected by the vagaries of the climate and who would benefit from understanding and better managing climate-related risks. However, such climate information is currently under-used, mis-used, or not used at all. Therefore there exists the opportunity to develop new technologies to properly ...
Voir le projet

 26

 TERMINÉ 

Re-design of the dairy industry for sustainable milk processing (SUSMILK)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

Industrial food production serves to satisfy basic human needs and the dairy industry accounts with 13% turnover for the total food and drink industry in Europe. The aim of the project SUSMILK is to initialise a system change within the whole process chain for market milk and milk products to minimise energy and water consumption and establish renewable energy resources. Milk processing is charact ...
Voir le projet

 22

 TERMINÉ 

INNOVATIVE CONFIGURATION FOR A FULLY RENEWABLE HYBRID CSP PLANT (HYSOL)

Date du début: 1 mai 2013, Date de fin: 31 juil. 2016,

Renewable energies have often problems in order to provide a stable and reliable power supply, as they often depend on meteorological circumstances that have a variable or stochastic component. This fact is often used by their detractors to favour the use of other alternatives such as fossil fuels.The main added value of the hybridisation concept will be the achievement of the Europe Strategic Ene ...
Voir le projet

 8

 TERMINÉ 

Tackling European Water Challenges (WATEUR)

Date du début: 1 janv. 2013, Date de fin: 30 juin 2016,

...ort the successful development and implementation of the Water JPI. WatEUr will permeate the structures of the Water JPI to impulse progress towards JPI objectives. Now that Water JPI Vision and Management Structure have been developed, actions are needed to sustain the current structures and to fasten progress in joint activities between national/regional programmes in Europe that will make the W ...
Voir le projet

 18

 TERMINÉ 
Energy use in buildings accounts for approximately 40% of EU energy consumption. Energy efficiency in new buildings is important, but existing building stock is the main target. Existing buildings, however, are characterised by particular requirements and constraints that are not present in new buildings and that requires new developments and adaptation of existing technologies.In order to fulfil ...
Voir le projet

 18

 TERMINÉ 

Sea For Society (SFS)

Date du début: 1 juin 2012, Date de fin: 30 nov. 2015,

Sea for Society (SFS) has brought together a multidisciplinary partnership of 21 partners from 11 countries representing marine research institutes, funding agencies, science museums and aquaria, CSO’s, NGO’s, higher education institutes, business networks, to implement a MMLAP to address Specific Challenge 3: Marine Resources, inland activities & sustainable development. SFS will mobilise researc ...
Voir le projet

 21

 TERMINÉ 
The SMARTBLIND project aims at developing an Energy Efficient Smart Window including a hybrid film constituted of an electrochromic LC film and a photovoltaic film both printed on the same long-lasting flexible substrate. The realization process will be implemented thanks to electrochromic and photovoltaic inks especially formulated to be ink-jet printed.A reduction of the windows U-value down to ...
Voir le projet

 13

 TERMINÉ 

European Nuclear Science and Applications Research (ENSAR)

Date du début: 1 sept. 2010, Date de fin: 31 déc. 2014,

ENSAR is the Integrating Activity of Nuclear Scientists from almost all European countries performing research in three of the major subfields of Nuclear Physics: Nuclear Structure, Nuclear Astrophysics and Applications of Nuclear Science. It proposes an optimised ensemble of Networking (NAs), Transnational Access and Joint Research Activities (JRAs), which will ensure qualitative and quantitative ...
Voir le projet

 32

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

... foundation for the Future Internet. From an architectural perspective, FI-WARE is based on the following main foundations: • Service Delivery Framework – the infrastructure to create, publish, manage and consume FI services across their life cycle, addressing all technical and business aspects. • Cloud Hosting – the fundamental layer which provides the computation, storage and network resources, ...
Voir le projet

 92

 TERMINÉ 

ROBOT FLEETS FOR HIGHLY EFFECTIVE AGRICULTURE AND FORESTRY MANAGEMENT (RHEA)

Date du début: 1 août 2010, Date de fin: 31 juil. 2014,

In the last two decades, a precise management of agricultural land has been made possible due to the availability of new technologies, including global positioning systems (GPS), geographic information systems (GIS), sensors, automation of agricultural machinery, and high resolution image sensing. As a result, the concept of Precision Agriculture has emerged as the management strategy that uses in ...
Voir le projet

 15

 TERMINÉ 
... to be developed. The RTD performers in collaboration with the SME associations will develop the set of OSH-related tools of the IMOSHION project. This will include (a) an OSH knowledge and learning management system, (b) a workplace simulation for experimenting and training on OSH issues, (c) an immersive training and learning tool for OSH procedures, and (d) a planning tool for OSH prevention at ...
Voir le projet

 12

 TERMINÉ 

Surfaces for molecular recognition at the atomic level (SMALL)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

"The overarching aim of the SMALL ITN project is to train Early Stage Researchers in the field of ‘molecular recognition at surfaces’ from fundamental science to novel applications. For this task, SMALL combines European experts from surface science, nanotechnology, theory, chemical synthesis, physics, biology and industry, and thus takes a highly integrated approach to the training. The researche ...
Voir le projet

 12

 TERMINÉ 

RESEARCHERS' NIGHT: PEOPLE FOR A BETTER FUTURE (ALLNIGHTS)

Date du début: 1 mai 2013, Date de fin: 30 nov. 2013,

...eers.The Events will be implemented using two different activities:1. Drawing Competition: Based on previous experiences of the Researchers’ Night edition, a drawing competition will be held. The analysis of drawings will be used to tackle the existing stereotypes about researchers.2. RN13: People for a Better Future: A Researchers’ fair will take place during the whole Event, where hands on exper ...
Voir le projet

 14

 TERMINÉ 
...curacy at the earliest instant in the design process. Several new modelling, exploration and simulation concepts will be developed and combined with well established ESL synthesis, cross-compilation, analysis and simulation tools into a seamless holistic design flow enabling performance & power aware virtual prototyping from a combined hardware-software perspective.
Voir le projet

 15

 TERMINÉ 

Researchers´ Night in Madrid 2010 (MADRIDRN)

Date du début: 1 mai 2010, Date de fin: 30 nov. 2010,

... with different scientific and technological areas.- Unity: given by the common objectives and the common messages to deliver.- Participation: reflected in the focus of the activities and in the management structure.- European dimension: present in the awareness campaign, in the content of the activities during the Night and in the dissemination.The project will contribute to confronting existing ...
Voir le projet

 11