Rechercher des projets européens

7 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Date du début: 1 sept. 2013, Date de fin: 31 août 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Voir le projet

 37

 TERMINÉ 

Access to Large Infrastructures in China and Europa (ALICE)

Date du début: 1 juin 2012, Date de fin: 31 mai 2016,

"The ALICE project is a co-ordination action between European and Chinese partners with the objective to develop transnational access to large material test infrastructures, with the emphasis on irradiation facilities. By collaboration and exchange between this European project and its Chinese counterpart, both technical as well as administrative and organizational issues, linked to transnational ...
Voir le projet

 5

 TERMINÉ 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Date du début: 1 janv. 2013, Date de fin: 31 déc. 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Voir le projet

 25

 TERMINÉ 

MATerials TEsting and Rules (MATTER)

Date du début: 1 janv. 2011, Date de fin: 31 déc. 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Voir le projet

 30

 TERMINÉ 

Structural integrity for lifetime management – non-RPV components (STYLE)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2013,

"The overall objective of the project is to assess, optimise and develop the use of advanced tools for the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management and to integrate the knowledge created in the project into mainstream nuclear industry assessment codes. Realistic failure models for some of the key components w ...
Voir le projet

 21

 TERMINÉ 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Voir le projet

 22

 TERMINÉ 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Date du début: 1 févr. 2010, Date de fin: 31 juil. 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Voir le projet

 15