 TERMINÉ 
The project proposes to increase the labour safety of Hungarian-Romanian common Felfogó-channel Frontier drainage system which covers 426 sqkm areas by the efficient importing (in the shortest way) to Hungarian area the 12,6 cm/s quantity water which is ruled by Excess Water Control Regulation which Regulation frames the attachment of the Treaty. On the Hungarian area was studied possibility for w ...
Voir le projet

 2

 TERMINÉ 
The aim of the project is to develop the inland flood prevention safety of the area lying on the two sides of the Hungarian-Romanian border. The general objective is to increase safety against inland flooding in the Mures river basin area and the effectiveness of protection against harmful inland waters. The specific objectives are to develop the working conditions of the staff by renovating the g ...
Voir le projet

 2

 TERMINÉ 

Lakes and parklands along the border, revitalization of Szamos dead channels (BODEN1)

Date du début: 30 avr. 2011, Date de fin: 27 févr. 2013,

The aim of the project is the rehabilitation of an area of 4000 ha - having scarce waters, or by contrary water in excess - located between the Romanian collecting canals and the Hungarian closing dam, creation of such an infrastructure which makes possible the widespread utilisation of the area. The formed “natural park” would ensure intensive development possibility in the surroundings; it would ...
Voir le projet

 2

 TERMINÉ 

Lakes and parks along the border, revitalization and tourism (BODEN)

Date du début: 28 févr. 2010, Date de fin: 30 août 2011,

Within the frames of Hungary - Romania Cross-Border Co-operation Programme in the project "Lakes and parklands along the border, revitalization of Szamos dead channels" the following were completed: geodetic survey of channels and linear utilities on Hungarian side and geodetic survey of channels on Romanian side; geodetic survey of areas under water; spatial model of the planned area; ecological ...
Voir le projet

 2

 TERMINÉ 
The common Regulations on Inland Water relating to watercourses constituting andintersecting the border is outdated. Therefore it was decided on a meeting of the WaterConservancy Technical Joint Committee in 2002 that the Regulation be updated by makinguse of IT developments, and technical knowledge and working practices be shared to improveco-operation. As a result of the surveys, places which re ...