Rechercher des projets européens

6 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

HYDROGEN MEETING FUTURE NEEDS OF LOW CARBON MANUFACTURING VALUE CHAINS (H2Future)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2021,

Under the coordination of VERBUND, VOESTALPINE, a steel manufacturer, and SIEMENS, a PEM electrolyser manufacturer, propose a 26 month demonstration of the 6MW electrolysis power plant installed at the VOESTALPINE LINZ plant (Austria). After pilot plant commissioning, the electrolyser is prequalified with the support of APG, the transmission operator of Austria, in order to provide grid-balancing ...
Voir le projet

 6

 TERMINÉ 
...th power lines. A 2005 LIFE project aimed to address these problems and successfully created undivided open spaces in the Westliches Weinviertel SPA. These habitat improvements have stabilised the Austrian great bustard population and could play a key role in establishing a breeding population in the Czech Republic, where the bustard is found but is not breeding. ...
Voir le projet

 7

 TERMINÉ 
The growing share of electricity generation from intermittent renewable energy sources as well as increasing market-based cross border flows and related physical flows are leading to rising uncertainties in transmission network operation. In the mainland central Europe synchronous area due to large installations of renewable energy generation such as wind and photovoltaic, the difference between a ...
Voir le projet

 16

 TERMINÉ 
The 3rd Energy Package clearly boosts the development of an Integrated European balancing mechanism. In this context, ACER has in 2011 started the development of the Framework Guidelines on Electricity Balancing.It is expected from the ACER statements that Demand Response will play significant role in the future integrated balancing market allowing Virtual Power Plants, comprising Demand Response ...
Voir le projet

 13

 TERMINÉ 
The European electricity system is facing major challenges to implement a strategy for a reliable, competitive and sustainable electricity supply. The development and the renewal of the transmission infrastructure are central and recognised issues in this strategy. Indeed the transmission system is a complex and strongly interconnected infrastructure that offers a wide range of benefits like relia ...
Voir le projet

 20

 TERMINÉ 

Cross-border Protection of the Great Bustard in Austria (Grosstrappe)

Date du début: 1 août 2005, Date de fin: 31 juil. 2010,

Background Great bustards (Otis tarda) are protected by the Birds Directive and the Austrian breeding population of this bird forms part of the West Pannonian great bustard population. A significant proportion of the West Pannonian great bustards spends the winter in Austria, where power lines have caused high mortality levels. Collision with power lines ...
Voir le projet

 7