Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Federation for FIRE Plus (Fed4FIREplus)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2021,

The Fed4FIRE+ project has the objective to run and further improve Fed4FIRE’s “best-in-town” federation of experimentation facilities for the Future Internet Research and Experimentation initiative. Federating a heterogeneous set of facilities covering technologies ranging from wireless, wired, cloud services and open flow, and making them accessible through common frameworks and tools suddenly op ...
Voir le projet

 24

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 

Big Data Value ecosystem (BDVe)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The mission of BDVe is to support the Big Data Value PPP in realizing a vibrant data-driven EU economy or said in other words, BDVe will support the implementation of the PPP to be a SUCCESS.Behind that mission, there are multiple goals to achieve, which should be taken into full consideration when defining the directions of the PPP. Some of the most challenging ones are: (1) achieving a more comp ...
Voir le projet

 11

 TERMINÉ 
HarmonicSS vision is to create an International Network and Alliance of partners and cohorts, entrusted with the mission of addressing the unmet needs in primary Sjogren Syndrome; working together to create and maintain a platform with open standards and tools, designed to enable secure storage, governance, analytics, access control and controlled sharing of information at multiple levels along wi ...
Voir le projet

 39

 TERMINÉ 
The main objective of the ANASTACIA is to address the constant discovery of vulnerabilities in ICT components providing assurance that ICT systems are secure and trustworthy by design. To this end, ANASTACIA will research and develop a holistic security framework, which will address all the phases of the ICT Systems Development Lifecycle and will be able to take autonomous decisions using new netw ...
Voir le projet

 14

 TERMINÉ 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The last decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned ...
Voir le projet

 9

 TERMINÉ 

Data-Driven Bioeconomy (DataBio)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The data intensive target sector selected for the DataBio project is the Data-Driven Bioeconomy, focusing in production of best possible raw materials from agriculture, forestry and fishery/aquaculture for the bioeconomy industry to produce food, energy and biomaterials taking into account also various responsibility and sustainability issues. DataBio proposes to deploy a state of the art, big dat ...
Voir le projet

 49

 TERMINÉ 
The demand for larger and more interconnected software systems is constantly increasing, but the ability of developers to satisfy it is not evolving accordingly. The most limiting factor is software validation, which typically requires very costly and complex testing processes. This project aims at significantly improving the efficiency and effectiveness of the testing process and, with it, the ov ...
Voir le projet

 11

 TERMINÉ 

Facility for Large-scale Adaptive Media Experimentation (FLAME)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

The Future Media Internet (FMI) will be driven by evolving existing over-the-top (OTT) solutions towards a stronger integration with emerging programmable communication and computing infrastructures to address consumer demand for personalised, interactive, mobile and localised media experiences. Creating a trusted platform that brings together technology, creative sectors and consumers in the deve ...
Voir le projet

 11

 TERMINÉ 
There is an increasing need to develop data intensive applications able to manage more and more amounts of data coming from distributed and heterogeneous sources effectively, quickly, correctly, and securely. However, the current adoption of Cloud Computing paradigm is not fully appropriate to store and analyse such data: latency, security, and compliance are still significant barriers. At the sa ...
Voir le projet

 9

 TERMINÉ 
CREATE-IoT’s aim is to stimulate collaboration between IoT initiatives, foster the take up of IoT in Europe and support the development and growth of IoT ecosystems based on open technologies and platforms. This requires synchronisation and alignment on strategic and operational terms through frequent, multi-directional exchanges between the various activities under the IoT Focus Areas (FAs). It a ...
Voir le projet

 20

 TERMINÉ 
The lack of interoperability is considered as the most important barrier to achieve the global integration of IoT ecosystems across borders of different disciplines, vendors and standards. Indeed, the current IoT landscape consists of a large set of isolated islands that do not constitute a real internet, preventing the exploitation of the huge potential expected by ICT visionaries.To overcome thi ...
Voir le projet

 15

 TERMINÉ 
Fog computing brings cloud computing capabilities closer to the end-device and users, while enabling location-dependent resource allocation, low latency services, and extending significantly the IoT services portfolio as well as market and business opportunities in the cloud sector. With the number of devices exponentially growing globally, new cloud and fog models are expected to emerge, paving ...
Voir le projet

 10

 TERMINÉ 

QROWD - Because Big Data Integration is Humanly Possible (QROWD)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

Big Data integration in European cities is of utmost importance for municipalities and companies to offer effective information services, enable efficient data-driven transportation and mobility, reduce CO2 emissions, assess the efficiency of infrastructure, as well as enhance the quality of life of citizens. At present this integration is substantially limited due to the following factors: 1) Urb ...
Voir le projet

 8

 TERMINÉ 

Software Testing AMPlification (STAMP)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

Release early, release often. Such is the mantra of IT giants like Twitter or Netflix. Pioneers in the engineering of applications that run in the cloud now routinely perform hundreds of code updates per day in what has become a thrust of continuous delivery around the clock. This stunning agility is a decisive competitive edge. It cuts time-to-market and hikes revenue. Behind the feat lies DevOps ...
Voir le projet

 10

 TERMINÉ 

Storage capacity sharing over virtual neighbourhoods of energy ecosystems (SHAR-Q)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

Storages are unavoidable components of the future smart grid with large share of variable renewable generation. However, the unit-cost of energy, that is retrieved from storages, is several times higher than the cost of energy consumed upon its output from RES. Therefore, there is a strong requirement on the optimisation of storage capacities deployed in the grid. This is especially true for the s ...
Voir le projet

 11

 TERMINÉ 
SynchroniCity represents the first attempt to deliver a Single Digital City Market for Europe by piloting its foundations at scale in 11 reference zones - 8 European cities & 3 more worldwide cities - connecting 34 partners from 11 countries over 4 continents. Building upon a mature European knowledge base derived from initiatives such as OASC, FIWARE, FIRE, EIP-SCC, and including partners with le ...
Voir le projet

 35

 TERMINÉ 
The seven specific objectives of TOXI-triage address the operational; technological; ethical and societal dimensions of CBRN response and recovery, and importantly the economic base from which sustainable CBRN and multi-use systems are derived.19 partners in 4 Task forces will deliver 9 Work Packages (WPs) that address: end user specifications; Design and delivery; Test and Validation; and, Impact ...
Voir le projet

 19

 TERMINÉ 
Data and services have become the key factor in manufacturing processes. The need to react on dynamically changing market demands is dramatically rising. One of the most imperative problems so far is to connect supply chain data and services between enterprises and to connect value chain data within a factory, so that it can meaningfully support decision-making. COMPOSITION will create a digital a ...
Voir le projet

 12

 TERMINÉ 

European Network for Cyber-security (NeCS)

Date du début: 1 sept. 2015, Date de fin: 31 août 2019,

The European Network for Cybersecurity (NECS) was formed in response to the increased need of highly qualified experts able to cope with all the aspects of the European cybersecurity strategy that is currently under implementation.There is indeed an evident need and opportunity to grow a new generation of young researchers able to answer this demand for expertize, trained to the changing nature o ...
Voir le projet

 8

 TERMINÉ 
The objective of LIGHTest is to create a global cross-domain trust infrastructure that renders it transparent and easy for verifiers to evaluate electronic transactions. By querying different trust authorities world-wide and combining trust aspects related to identity, business, reputation etc. it will become possible to conduct domain-specific trust decisions. This is achieved by reusing existing ...
Voir le projet

 14

 TERMINÉ 

Architecture for EurOpean Logistics Information eXchange (AEOLIX)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Supply chain visibility supported by easy access to, and exchange and use of relevant and abundant logistics-related information is an important prerequisite for the deployment of pan-European logistics solutions that are needed to increase efficiency and productivity, and to reduce environmental impact. Although there is a proliferative development of logistics-related data stores, information ch ...
Voir le projet

 34

 TERMINÉ 

Diversity Enhancements for SIEMs (DiSIEM)

Date du début: 1 sept. 2016, Date de fin: 31 août 2019,

Security Information and Event Management (SIEM) systems are a fundamental component of the ubiquitous ICT infrastructures that form the backbone of our digital society. These systems are mostly used to monitor infrastructures using many types of sensors and tools and correlate the obtained events to discover possible threats (attacks, vulnerabilities, etc.) to the organization. The DiSIEM project ...
Voir le projet

 8

 TERMINÉ 

Transforming Transport (TT)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2019,

Big Data will have a profound economic and societal impact in the mobility and logistics sector, which is one of the most-used industries in the world contributing to approximately 15% of GDP. Big Data is expected to lead to 500 billion USD in value worldwide in the form of time and fuel savings, and savings of 380 megatons CO2 in mobility and logistics. With freight transport activities projected ...
Voir le projet

 48

 TERMINÉ 
In recent years, the majority of the world's Critical Infrastructures CIs evolved to become more flexible, cost efficient and able to offer better services and conditions for business opportunities. Towards this evolution, CIs and companies offering CI services had to adopt many of the recent advances of the Information and Communication Technologies (ICT) field. This adaptation however, was rathe ...
Voir le projet

 14

 TERMINÉ 

NEW Business models for ITS (NEWBITS)

Date du début: 1 oct. 2016, Date de fin: 31 mars 2019,

The overall objective of the NEWBITS project is to provide with a deep understanding of the changing conditions and dynamics that affect and/or influence C-ITS innovations. New KPIs will be designed to feed reactive and network oriented value creation propositions that improve the collaborative decision-making process across the various stakeholders. This improved value definition must minimize th ...
Voir le projet

 9

 TERMINÉ 

reliAble euRopean Identity EcoSystem (ARIES)

Date du début: 1 sept. 2016, Date de fin: 28 févr. 2019,

ARIES main goal is to deliver a comprehensive framework for reliable e-identity ecosystem comprising new technologies, processes and security features that ensure highest levels of quality in eID based on trustworthy security documents and biometrics for highly secure and privacy-respecting physical and virtual identity management, with the specific aim to tangibly achieve a reduction in levels of ...
Voir le projet

 9

 TERMINÉ 
Science2Society creates, pilots and shares good practices, guidelines and training materials that improve awareness and practical performance in seven concrete university-industry-society interfacing schemes especially affected by Science 2.0 and open innovation. It covers a very wide range of interfacing / co-creation approaches (and the synergy between them) and advances far beyond the tradition ...
Voir le projet

 19

 TERMINÉ 
NEWTON is a large scale initiative to develop, integrate and disseminate innovative technology-enhanced learning (TEL) methods and tools, to create new or inter-connect existing state-of-the art teaching labs and to build a pan-European learning network platform that supports fast dissemination of learning content to a wide audience in a ubiquitous manner. NEWTON focuses on employing novel technol ...
Voir le projet

 14

 TERMINÉ 
The MaTHiSiS learning vision is to provide a product-system for vocational training and mainstream education for both individuals with an intellectual disablity and non-diagnosed ones. This product-system consists of an integrated platform, along with a set of re-usable learning components (educational material, digital educational artefacts etc.), which will respond to the needs of a future educa ...
Voir le projet

 19

 TERMINÉ 

Symbiosis of smart objects across IoT environments (symbIoTe)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

Connected smart objects have invaded our everyday life across multiple domains, e.g. home withautomation solutions, assisted living with sensors and wearables to monitor personal activities, smart transportation and environmental monitoring. IoT is evolving around a plethora of vertically isolated platforms, each specifically suited to given scenarios and often adopting non-standard, sometimes ful ...
Voir le projet

 14

 TERMINÉ 

Platform for wildlife monitoring integrating Copernicus and ARGOS data (EO4wildlife)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

EO4wildlife main objective is to bring large number of multidisciplinary scientists such as biologists, ecologists and ornithologists around the world to collaborate closely together while using European Sentinel Copernicus Earth Observation more heavily and efficiently.In order to reach such important objective, an open service platform and interoperable toolbox will be designed and developed. It ...
Voir le projet

 7

 TERMINÉ 
Computer systems have faced significant power challenges over the past 20 years; these challenges have shifted from the devices and circuits level, to their current position as first-order constraints for system architects and software developers. TANGO’s goal is to characterise factors which affect power consumption in software development and operation for heterogeneous parallel hardware environ ...
Voir le projet

 6

 TERMINÉ 

Adoptive Gateways for dIverse muLtiple Environments (AGILE)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

AGILE project aims to create an open, flexible and widely usable IoT solution at disposal of industries (startups, SMEs, tech companies) and individuals (researchers, makers, entrepreneurs) as a framework that consists of:• A modular IoT gateway enabling various types of devices (wearables, home appliances, sensors, actuators, etc.) to be connected with each other and to the Internet;• Data manage ...
Voir le projet

 20

 TERMINÉ 

TrustwOrthy model-awaRE Analytics Data platfORm (TOREADOR)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

The TOREADOR project is aimed at overcoming some major hurdles that until now have prevented many European companies from reaping the full benefits of Big Data analytics (BDA). Companies and organisations in Europe have become aware of the potential competitive advantage they could get by timely and accurate Big Data analytics, but lack the IT expertise and budget to fully exploit BDA. To overcom ...
Voir le projet

 10

 TERMINÉ 

Personal Decision Support System For Heart Failure Management (HeartMan)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

1–2% of the developed world suffers from congestive heart failure (CHF), which is the most frequent cause of hospitalization in people aged over 65. CHF management involves medications, monitoring of fluid intake and weight, exercise and lifestyle modifications. Since most patients are elderly and suffer from co-morbidities, they have difficulty adhering to the management guidelines, which often l ...
Voir le projet

 9

 TERMINÉ 

Bringing FIWARE to the NEXT step (FI-NEXT)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2018,

Digital technologies underpin innovation and competitiveness across a broad range of market sectors. A key technology to boost such innovation and competitiveness is represented by the full and wide adoption of Open Service Platforms. In fact, they will allow increased competition and market penetration because they should be built on top of royalty-free open specifications, adopting open source r ...
Voir le projet

 16

 TERMINÉ 

Towards a EU framework for the security of Widezones (ZONESEC)

Date du début: 1 déc. 2014, Date de fin: 30 nov. 2018,

The advancement of 24/7 surveillance systems for the security of WideZones with multiple assets at localized scales is of extreme strategic relevance to European economies, industries, authorities and Citizens. Nevertheless, the cost for large deployments and maintenance of ground sensing networks for local surveillance across these WideZones is extremely high. Hence, large areas of high economic ...
Voir le projet

 19

 TERMINÉ 

DRiving InnoVation in crisis management for European Resilience (DRIVER)

Date du début: 1 mai 2014, Date de fin: 31 oct. 2018,

DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Voir le projet

 38

 TERMINÉ 
The aim of JOSPEL project is the development of a novel energy efficient climate system for the optimization of interior temperature control management in electrical vehicles through an integrated approach that combines the application of the thermoelectric Joule and Peltier effect, the development of an efficient insulation of the vehicle interior, the energy recovery from heat zones, battery li ...
Voir le projet

 15