Rechercher des projets européens

7 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Technology Advances and Key Enablers for 5 nm (TAKE5)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

The TAKE5 project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 10nm technology node and the ECSEL JU project SeNaTe aiming at the 7nm technology node. The main objective of the TAKE5 project is the demonstration of 5nm patterning in line with the industry needs and the ITRS roadmap in the Advanced Patter ...
Voir le projet

 13

 TERMINÉ 

Seven Nanometer Technology (SeNaTe)

Date du début: 1 avr. 2015, Date de fin: 31 mars 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Voir le projet

 41

 TERMINÉ 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Voir le projet

 13

 TERMINÉ 

Semiconductor Equipment Assessment for Key Enabling Technologies (SEA4KET)

Date du début: 1 nov. 2013, Date de fin: 31 oct. 2016,

SEA4KET (Semiconductor Equipment Assessment for Key Enabling Technologies) is an IP proposal taking the consequent step from equipment R&D to equipment assessment experiments. The strategic objective is to effectively combine resources and expertise in a joint assessment of novel equipment for key enabling technologies to foster and accelerate the successful transfer of novel European equipment in ...
Voir le projet

 26

 TERMINÉ 
Five major global semiconductor companies are working in the G450C consortium based in Albany N.Y. to introduce 450mm wafer semiconductor processing and are now installing the first wave of 450mm prototype systems. Intel and TSMC lead this effort with published roadmaps showing pilot lines in 2016, production in 2018. Samsung will soon follow which will force GlobalFoundries, SK Hynix, Toshiba, UM ...
Voir le projet

 12

 TERMINÉ 

European 450mm Equipment Demo Line (E450EDL)

Date du début: 1 oct. 2013, Date de fin: 30 sept. 2016,

The aim of the E450EDL project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative and proceeded with subsequent projects funded with public money, amongst others NGC450, SOI450, EEM450PR. The demo line resulting from this project will be such that it will enable first crit ...
Voir le projet

 44

 TERMINÉ 
The ERG project focus on the solar energy supply chain, starting form photovoltaic cells (PV) and proceeding with energy extraction (harvesting) techniques, high efficiency power conversion and finally managing the energy distribution inside a smart grid, with the target of different classes of applications, from house to small area, as well as application specific “local grid” (healthcare, automo ...
Voir le projet

 27