Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Coding for Optical communications In the Nonlinear regime (COIN)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

The rapid increase in data traffic in the past years and traffic forecasts will lead to capacity exhaust in the optical fibre communications infrastructure which carries over 95% of all data services. The optical fibre channel is nonlinear, that is, its properties, namely its refractive index, is dependent on optical intensity, and at high power densities, the combination of nonlinear effects and ...
Voir le projet

 3

 TERMINÉ 

Anticipatory Networking Techniques in 5G and Beyond (ACT5G)

Date du début: 1 mai 2015, Date de fin: 30 avr. 2019,

The rapid growth in mobile network data traffic contributed to the unprecedented speed of 4G LTE adoption, creating the need of sustainable capacity growth in next generation of wireless systems, namely 5G. A key success factor of 5G is network and management system design for flexibility by prediction and adaptation. To this end, anticipation is a promising new approach. By predicting and adaptin ...
Voir le projet

 3

 TERMINÉ 

Graphene-based disruptive technologies (GrapheneCore1)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Voir le projet

 158

 TERMINÉ 
The demand for broadband content and services has been growing at tremendous rates, and predictions indicate that wireless data-rates of multiple tens of Gbps will be required by the year 2020, essentially for short-range connectivity. Currently available wireless technology cannot support these future demands, and so there is an urgent need to develop new technology platforms that are cost and en ...
Voir le projet

 11

 TERMINÉ 

5G NOvel Radio Multiservice adaptive network Architecture (5G NORMA)

Date du début: 1 juil. 2015, Date de fin: 31 déc. 2017,

"The key objective of 5G NORMA is to develop a conceptually novel, adaptive and future-proof 5G mobile network architecture. The architecture is enabling unprecedented levels of network customisability, ensuring stringent performance, security, cost and energy requirements to be met; as well as providing an API-driven architectural openness, fuelling economic growth through over-the-top innovation ...
Voir le projet

 15

 TERMINÉ 
The overall objective of Flex5Gware is to deliver highly reconfigurable hardware (HW) platforms together with HW-agnostic software (SW) platforms targeting both network elements and devices and taking into account increased capacity, reduced energy footprint, as well as scalability and modularity, to enable a smooth transition from 4G mobile wireless systems to 5G.As it will be argued in the propo ...
Voir le projet

 19

 TERMINÉ 
5G will have to cope with a high degree of heterogeneity in terms of: (a) services (mobile broadband, massive machine and mission critical communications, broad-/multicast services and vehicular communications); (b) device classes (low-end sensors to high-end tablets); (c) deployment types (macro and small cells); (d) environments (low-density to ultra-dense urban); (e) mobility levels (static to ...
Voir le projet

 18

 TERMINÉ 
Key objectives of METIS-II are to develop the overall 5G radio access network design and to provide the technical enablers needed for an efficient integration and use of the various 5G technologies and components currently developed. The innovation pillars that will allow METIS-II to achieve this goal are • a holistic spectrum management architecture addressing the spectrum crunch, • an air interf ...
Voir le projet

 24

 TERMINÉ 
...band services for mobile users, supporting UHD/3D streaming, immersive applications and ultra-responsive cloud services.The consortium brings together major infrastructure vendors (Samsung, Ericsson, Alcatel-Lucent, Huawei, Intel, Nokia), major European operators (Orange, Telefonica), leading research institutes and universities (Fraunhofer HHI Institute, CEA-LETI, IMDEA Networks, Universities Aal ...
Voir le projet

 19

 TERMINÉ 
The proposed pilot line project WAYTOGO FAST objective is to leverage Europe leadership in Fully Depleted Silicon on Insulator technology (FDSOI) so as to compete in leading edge technology at node 14nm and beyond preparing as well the following node transistor architecture. Europe is at the root of this breakthrough technology in More Moore law. The project aims at establishing a distributed pilo ...
Voir le projet

 32

 TERMINÉ 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Date du début: 1 oct. 2013, Date de fin: 31 mars 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Voir le projet

 154

 TERMINÉ 
DISCUS will analyse, design, and demonstrate a complete end-to-end architecture and technologies for an economically viable, energy efficient and environmentally sustainable future-proof optical network. It will provide a revolution in communications networks applicable across Europe and the wider world exploiting to the full the opportunity offered by LR-PONS and flat optical core networks to pro ...
Voir le projet

 12

 TERMINÉ 

5G: A LeadershIp Vision for Europe (5-Alive)

Date du début: 1 nov. 2014, Date de fin: 31 oct. 2015,

The approach of the 5-Alive project will be to use an innovative mix of community and industrial support to produce the essential material and to perform an intensive communications programme. The project proposes to establish effective processes to capture, synopsise and present frequent news updates on the activities of the European 5G initiative and ensure their widespread dissemination. The ...
Voir le projet

 11

 TERMINÉ 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Voir le projet

 16

 TERMINÉ 

Future INternEt Smart Utility ServiCEs (Finesce)

Date du début: 1 mars 2013, Date de fin: 30 sept. 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Voir le projet

 34

 TERMINÉ 

5th Generation Non-Orthogonal Waveforms for Asynchronous Signalling (5GNOW)

Date du début: 1 sept. 2012, Date de fin: 31 mars 2015,

LTE and LTE-Advanced have been optimized to deliver high bandwidth pipes to wireless users. The transport mechanisms have been tailored to maximize single cell performance by enforcing strict synchronism and orthogonality within a single cell and within a single contiguous frequency band. Various emerging trends reveal major shortcomings of those design criteria:•The fraction of machine-type-commu ...
Voir le projet

 6

 TERMINÉ 

FI-WARE: Future Internet Core Platform (FI-WARE)

Date du début: 1 mai 2011, Date de fin: 31 déc. 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Voir le projet

 92

 TERMINÉ 

Networked Society (NetSoc)

Date du début: 1 juil. 2012, Date de fin: 30 juin 2014,

The strategic objective of the Networked Society project is to define the requirements for future networks that can seamlessly support the Networked Society of 2020. This will be achieved by enabling an informed dialogue and policy debate between the terrestrial, satellite and content delivery communities and the industrial and social application sectors. This project will create new and lasting r ...
Voir le projet

 10

 TERMINÉ 

UniverSelf

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2013,

The internet of today is fragmented into loosely interacting domains. Future Networks will be pervasive: people, machines and the surrounding spaces will form decentralized and dynamic networks of networks of as-yet unseen scales. Future Networks will challenge Service and Network Operators to find the right ways to embed intelligence into networks in order to ensure their autonomic management an ...
Voir le projet

 22

 TERMINÉ 
ACCORDANCE introduces a novel ultra high capacity (even reaching the 100Gbps regime) extended reach optical access network architecture based on OFDMA (Orthogonal Frequency Division Multiple Access) technology/protocols, implemented through the proper mix of state-of-the-art photonics and electronics. Such architecture is not only intended to offer improved performance compared to evolving TDMA-PO ...
Voir le projet

 10

 TERMINÉ 

Future INternet for Smart ENergY (FINSENY)

Date du début: 1 avr. 2011, Date de fin: 30 avr. 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Voir le projet

 41

 TERMINÉ 

Quality of Service and MObility driven cognitive radio Systems (QoSMOS)

Date du début: 1 janv. 2010, Date de fin: 31 mars 2013,

QoSMOS is a 3-year Integrated Project that aims at researching, developing and integrating a Cognitive Radio (CR) framework to enable mobile broadband systems to improve utilisation of licensed and/or unlicensed bands, by adding dynamic exploitation of under-utilised spectrum. The technical focus is on opportunistic use of spectrum combined with managed Quality of Service (QoS) and seamless mobili ...
Voir le projet

 15

 TERMINÉ 

EXpAnding LTE for Devices (EXALTED)

Date du début: 1 sept. 2010, Date de fin: 28 févr. 2013,

The number of networked humans will reach saturation by the middle of the next decade, while the number of networked devices will continue to increase dramatically for some time to come. The Wireless World Research Forum (WWRF) has set out a vision of the future where 7 trillion wireless devices will be serving 7 billion people by 2017. The vast majority of wireless traffic will be between machine ...
Voir le projet

 16

 TERMINÉ 

SAIL: Scalable & Adaptive Internet soLutions (SAIL)

Date du début: 1 août 2010, Date de fin: 28 févr. 2013,

SAIL's objective is the research and development of novel networking technologies using proof-of-concept prototypes to lead the way from current networks to the Network of the Future.SAIL leverages state of the art architectures and technologies, extends them as needed, and integrates them using experimentally-driven research, producing interoperable prototypes to demonstrate utility for a set of ...
Voir le projet

 26

 TERMINÉ 
Internet traffic has been growing quickly for many years, despite adverse economic conditions and this growth will continue in the future. To cope with this evolution, the cost of today's network solutions is still too high.In addition, in line with the EC goal of reducing the overall emissions, energy efficiency should be widely improved, using whenever possible optics instead of electronics wher ...
Voir le projet

 19

 TERMINÉ 

Enriched Network-aware Video Services over Internet Overlay Networks (ENVISION)

Date du début: 1 janv. 2010, Date de fin: 31 déc. 2012,

Future networked media applications will be multi-sourced, highly interactive distributed meshes of HD and 3D multi-sensory channels. While high-quality user-centric applications such as these offer tremendous advantages to their participants and to society at large, they present a major headache to ISPs as they demand unprecedented quantities of network resources in unpredictable locations. The t ...
Voir le projet

 7

 TERMINÉ 
In current wireless communications, radio spectrum and infrastructure are typically used such that interference is avoided by exclusive allocation of frequency bands and employment of base stations. SAPHYRE will demonstrate how equal-priority resource sharing in wireless networks improves spectral efficiency, enhances coverage, increases user satisfaction, leads to increased revenue for operators, ...
Voir le projet

 12

 TERMINÉ 
Due to the need of supporting diversified services with vastly expanded use of wireless access, the Future Internet will set the networks under stress for resources. This motivates the quest for efficiency, through technologies that achieve: (i) higher utilization of resources; (ii) lower transmission powers and energy consumption (decisions with "green" footprint); (iii) reductions in the total c ...
Voir le projet

 12

 TERMINÉ 

Internet of Things Initiative (IoT-i)

Date du début: 1 sept. 2010, Date de fin: 30 nov. 2012,

Internet of Things (IoT) is one of the most important areas of a Future Internet with significant potential to positively impact European economy and society. The current IoT research community is however highly fragmented, featuring diverging approaches and technologies. This inevitably leads to a lack of coherency that hinders the realisation of an interoperable IoT, preventing the IoT to achiev ...
Voir le projet

 17

 TERMINÉ 

eMobility NetWorld

Date du début: 1 juil. 2010, Date de fin: 31 juil. 2012,

Society is becoming confident that it can address the Grand Challenges of the 21st century: It can address global warming by taking decisive action, can invent and deploy innovative transport systems to reduce traffic problems and will be able to solve the issues associated with the ageing population. Smart applications enabled by advanced communication networks will be a centrepiece of many solu ...
Voir le projet

 10

 TERMINÉ 

Advanced Radio Interface Technologies for 4G Systems (ARTIST4G)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

The first 3GPP Long Term Evolution standard version is complete and ready to be deployed. Although it increases peak data rate and spectral efficiency compared to legacy techniques, cell-edge and average user throughputs are still significantly lower than the peak rates. In the LTE-Advanced Study Item, ways to extend LTE are being explored. However, some of the considered techniques are complex an ...
Voir le projet

 18

 TERMINÉ 

Energy Aware Radio and neTwork tecHnologies (EARTH)

Date du début: 1 janv. 2010, Date de fin: 30 juin 2012,

Telecommunication networks and in particular mobile communications are increasingly contributing to global energy consumption. The EARTH proposal tackles the important issue of energy saving by enhancing the energy efficiency of mobile broadband systems thereby reducing CO2 emissions. It is a highly ambitious and unique proposal, applying an integrated approach to investigate the energy efficiency ...
Voir le projet

 15

 TERMINÉ 
"Positioning applications (especially in Europe) are based on positioning data mainly provided by GPS (and in the medium-term GALILEO), which in many cases may become problematic due to the low accuracy provided (thus preventing the take-up of services with high accuracy constraints), the low availability of satellite positioning signals particularly in urban areas and the reliability of the posit ...
Voir le projet

 10

 TERMINÉ 

Unobtrusive Authentication Using Activity Related and Soft Biometrics (ACTIBIO)

Date du début: 1 mars 2008, Date de fin: 31 mars 2011,

ACTIBIO will research and develop a completely new concept in biometric authentication: the extraction of multimodal biometric signatures based on the response of the user to specific stimuli, while performing specific but natural work-related activities. The novelty of the approach lies in the fact that the biometric measurements will correspond to the response of the person to specific events be ...
Voir le projet

 12

 TERMINÉ 
Description The overriding objective of IRMOS is to enable 'real-time' interaction between people and applications over a Service Oriented Infrastructure...The primary objective of IRMOS is to enable 'real-time' interaction between people and applications by developing, integrating and validating an adequate Service Oriented Infrastructur ...
Voir le projet

 13

 TERMINÉ 

CARrier grade MEsh Networks (CARMEN)

Date du début: 1 janv. 2008, Date de fin: 31 déc. 2010,

CARMEN, CARrier grade MEsh Networks, will study and specify a wireless mesh network supporting carrier grade triple-play services for mobile/fixed network operators. Future operator networks will be comprised of a common core network and several access networks, and the CARMEN access network will complement other access technologies by providing a low cost and fast deployment mesh network access t ...
Voir le projet

 9

 TERMINÉ 
...testing and validation of these algorithms.The project is led by SEQUANS Communications, industry leader in fixed and mobile WiMAX system-on-chip solutions, and the list of partners includes RINICOM, Alcatel-Lucent, Thales Communications, TURKCELL, Ultra Electronics, Bilkent University, Politecnico di Torino, SUPELEC, Institute of Accelerating Systems & Applications, University of Leeds, Kadir Has ...
Voir le projet

 13

 TERMINÉ 

Physical layer for dynamic spectrum access and cognitive radio (PHYDYAS)

Date du début: 1 janv. 2008, Date de fin: 31 oct. 2010,

PHYDYAS proposes an advanced physical layer, using filter bank-based multicarrier (FBMC) transmission, for the new concepts in radiocommunications: dynamic access spectrum management (DASM) and cognitive radio. It shows that the performance and operational flexibility of systems are enhanced by exploiting the spectral efficiency of filter banks and the independence of sub-channels. Combining wit ...
Voir le projet

 13

 TERMINÉ 

eMobility Coordination Action (eMobility CA)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Telecommunications is experiencing major change. Sector actors are searching for new strategies as globalisation, mergers, convergence and new and disruptive technologies happen. The eMobility Technology Platform was formed to address this challenge and has almost 650 members. It has a track record of success in facilitating consensus building. The strategic objective of the eMobility CA proj ...
Voir le projet

 8

 TERMINÉ 

4WARD - Architecture and Design for the Future Internet (4WARD)

Date du début: 1 janv. 2008, Date de fin: 30 juin 2010,

Today's network architectures are stifling innovation, restricting it mostly to the application level while the need for structural change is increasingly evident. The absence of adequate facilities to design, optimize and interoperate new networks currently forces a convergence to an architecture that is suboptimal for many applications and that cannot support innovations within itself, the Inter ...
Voir le projet

 39