Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 
Reliability and radiation damage issues have a long and important history in the domain of satellites and space missions. Qualification standards were established and expertise was built up in space agencies (ESA), supporting institutes and organizations (CNES, DLR, etc.) as well as universities and specialized companies. During recent years, radiation concerns are gaining attention also in aviati ...
Voir le projet

 9

 TERMINÉ 

Laser Lightning Rod (LLR)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Controlling lightning is a long time dream of mankind. The goal of the present project is to investigate and develop a new type of lightning protection based on the use of upward lightning discharges initiated through a high repetition rate multi terawatt laser. The feasibility of the novel technique and the project’s prospect of success are based on recent research providing new insights into the ...
Voir le projet

 9

 TERMINÉ 
The mission of COMPOSELECTOR is to develop a Business Decision Support System (BDSS), which integrates materials modelling, business tools and databases into a single workflow to support the complex decision process involved in the selection and design of polymer-matrix composites (PMCs). This will be achieved by means of an open integration platform which enables interoperability and information ...
Voir le projet

 11

 TERMINÉ 
...t, the four partners have intimate knowledge in space technology and will bring expertise to the project. E2V (F), coordinator, will be in charge of design, manufacturing and test activities. AIRBUS Defence & Space (UK) and THALES ALENIA SPACE (F), the two major European space companies, will make a key contribution as end-users of space data converters – guiding initial requirements and evaluatin ...
Voir le projet

 4

 TERMINÉ 

Consortium for Hall Effect Orbital Propulsion System (CHEOPS)

Date du début: 1 nov. 2016, Date de fin: 30 avr. 2020,

CHEOPS proposes to develop three different Hall Effect Thruster electric propulsion systems: a dual mode EPS for GEO applications, a low power for LEO applications and a >20 kW high thrust EPS for exploration applications. Each of these will be developed according to market needs and drivers applying incremental technology changes to existing EPS products. The development approach will follow the ...
Voir le projet

 14

 TERMINÉ 
TurboNoiseBB aims to deliver reliable prediction methodologies and noise reduction technologies in order to allow European Aerospace industries:• to design low-noise aircraft to meet society’s needs for more environmentally friendly air transport• to win global leadership for European aeronautics with a competitive supply chain.The project is focusing on fan broadband (BB) noise sources and will o ...
Voir le projet

 15

 TERMINÉ 

Integrated Surface Management (PJ03a SUMO)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Voir le projet

 37

 TERMINÉ 

Increased Runway and Airport Throughput (PJ02 EARTH)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Voir le projet

 35

 TERMINÉ 

Airport Safety Nets (PJ03b SAFE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety bareers to mitigate the risks of runway incursion, runway excursion and more generally the risk of incidents and accidents involving aircraft at the airport. They will be declined into four Solutions:Solution ‘Enhanced airport safety support tools for control ...
Voir le projet

 28

 TERMINÉ 

Energy for Smart Objects (EnSO)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Voir le projet

 36

 TERMINÉ 

Master Plan Maintenance (PJ20 AMPLE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Within the Single European Sky technological pillar, the European ATM Master Plan (ATM MP) is the roadmap to the horizon 2035+ to guide and connect ATM Research and Innovation and Deployment in building the future European ATM System. The European ATM Master Plan Edition 2015 approved by the SESAR Joint Undertaking (SJU) Administrative Board and the European Commission and recently published, set ...
Voir le projet

 29

 TERMINÉ 

Initial Trajectory Information Sharing (PJ31 DIGITS)

Date du début: 1 sept. 2016, Date de fin: 31 déc. 2019,

"DIGITS will contribute to reinforce the “Enabling Aviation infrastructure” key feature of SESAR 2020 by demonstrating the ATM benefits that can be realized through the use of downlinked 4D trajectory data in ground systems.The project proposes, in a close to operational environment and in fully representative operational conditions, a set of tightly coordinated development and demonstration actio ...
Voir le projet

 18

 TERMINÉ 

Content Integration (PJ19 CI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – t ...
Voir le projet

 28

 TERMINÉ 

Enhanced Air and Ground Safety Nets (PJ11 CAPITO)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Safety is at the core of ATC. However, safety is interrelated with efficiency. Air and Ground Safety Nets have been developed to increase the achieved level of safety. Necessarily, Ground and Air Safety Nets have to evolve to keep up with the challenges originating from ever increasing traffic density and complexity.ATM evolutions necessary to safely handle increasing traffic demand or to improve ...
Voir le projet

 14

 TERMINÉ 

Deep sub-micron microprocessor for spAce rad-Hard appLIcation Asic (DAHLIA)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

...ng cost and mass and boosting competitiveness of future European space equipments.With the highest cumulative number of European satellites and electronics equipments successfully operating in orbit, Airbus and TAS represent together the indisputable best positioned companies in Europe to ensure the maximum relevance of the DAHLIA SoC for its future use by the whole European Space community. Beyon ...
Voir le projet

 7

 TERMINÉ 

4D Trajectory Management (PJ18 4DTM)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

One of the main obstacles of reaching Single European Sky’s objectives is management of flight trajectories. Inaccuracies are difficult to spot and information given to stakeholders about the trajectory is limited, arriving late, and full of inconsistencies and wrong assumptions. Military Flights are currently not integrated in the ATM-system, so demanding special treatment.Additionally, there is ...
Voir le projet

 29

 TERMINÉ 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Voir le projet

 29

 TERMINÉ 
The PJ 14 CNS aims to specify and develop the future Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holist ...
Voir le projet

 30

 TERMINÉ 
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situa ...
Voir le projet

 30

 TERMINÉ 

Enhanced Arrivals and Departures (PJ01 EAD)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

In order to meet forecast traffic growth, PJ01 will develop concepts, tools and procedures to increase the capacity of Terminal Manoeuvring Areas (TMAs) in a safe, cost-effective and environmentally sustainable manner. This will be achieved by taking advantage of the latest technological developments from both an airborne and a ground-system perspective and through the secure sharing of data. The ...
Voir le projet

 25

 TERMINÉ 
Effective EU support to a large external crisis requires new approaches. In response to this challenge and to identified user and market needs from previous projects, Reaching Out proposes an innovative multi-disciplinary approach that will optimize the efforts, address a wide spectrum of users and maximize market innovation success.This approach results in five main objectives: to1. Develop a Col ...
Voir le projet

 29

 TERMINÉ 

Integrated Airport Operations (PJ28 IAO)

Date du début: 1 déc. 2016, Date de fin: 30 nov. 2019,

"This project PJ28 which is part of the SESAR 2020 Multi annual Program (S2020 MAWP) for the period 2016-2019, will demonstrate the benefits that specific promising SESAR solutions will bring in a large and two mid-size airports, where traffic congestion daily takes place during the peak season and where new SESAR solutions are expected to assist controllers in their duty. PJ28 proposal addresses ...
Voir le projet

 15

 TERMINÉ 

PJ22:Validation and Demonstration Engineering (PJ22 SEabird)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The aim of SESAR2020.PJ22 is to address one of the Transversal Activities, specifically Validation & Demonstration Engineering. In SESAR 1, the application of an engineering methodology defining the process for development of verification and validation platforms, was optionally mandated to the primary projects, leading to a different level of information available across the Programme. The delive ...
Voir le projet

 12

 TERMINÉ 

Advanced Airspace Management (PJ08 AAM)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

According to EUROCONTROL’s 2013 Challenges of Growth Report, Air traffic in the ECAC region is forecast to increase by 50% between 2012-2035 (most-likely scenario).Air traffic diversity is expected to become even more complex with the emergence of Remotely Piloted aircraft Systems (RPAS) and the multi-task nature of military aerial missions. The extension of free route operations will also imply m ...
Voir le projet

 20

 TERMINÉ 

PJ07 Optimised Airspace Users Operations (PJ07 OAUO)

Date du début: 1 oct. 2016, Date de fin: 30 sept. 2019,

The SES Performance Scheme established the principles of performance-driven ATM and Network-wide Collaborative decision making including Civil and State Airspace Users. Hence, it is critical that Flight and Wings Operation Centres processes and tools be enriched for more efficient interaction with ATM Network stakeholders including Airports. Improved performance of ATM depends on a higher certaint ...
Voir le projet

 14

 TERMINÉ 
Sectors such as aerospace, automotive, wind power, capital goods are characterised, on the one hand, by complex products and small scale production that require high flexibility and on the other hand by an increasing pressure to raise productivity rates. Furthermore manufacturing systems need to deal with an ever-changing environment due to short term changes caused by human or production related ...
Voir le projet

 9

 TERMINÉ 
The ultimate purpose of ANYWHERE is to empower exposed responder institutions and citizens to enhance their anticipation and pro-active capacity of response to face extreme and high-impact weather and climate events. This will be achieved through the operational implementation of cutting-edge innovative technology as the best way to enhance citizen's protection and saving lives.ANYWHERE proposes t ...
Voir le projet

 32

 TERMINÉ 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Voir le projet

 76

 TERMINÉ 
This proposal is in response to the call for International Cooperation in Aeronautics with China, MG-1.10-2015 under Horizon 2020 “Enhanced Additive Manufacturing of Metal Components and Resource Efficient Manufacturing Processes for Aerospace Applications”. The objectives are to develop the manufacturing processes identified in the call: (i) Additive manufacturing (AM); (ii) Near Net Shape Hot I ...
Voir le projet

 12

 TERMINÉ 
Composites are important materials used in aircrafts due to their excellent mechanical properties combined with relatively low weight enabling the reduction of fuel consumption. Expensive carbon fibre reinforced plastics (CFRP) are used in fuselage and wing structures and increasingly replace classic metals. Glass fibre reinforced plastics (GFRP) are mainly used for the interior panels. All these ...
Voir le projet

 9

 TERMINÉ 

Efficient Composite parts manufacturing (EFFICOMP)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2019,

...tion of composite parts for structural application on aerospace products. These objectives are fully in line with objectives of the call MG1.8. European partners consortium is composed with end user (AIRBUS Group) and research laboratories (DLR, Stuttgart University, Delft University) and a dissemination expert partner (EASN). All selected partners have a strong experience with aerospace research ...
Voir le projet

 6

 TERMINÉ 
SIMUTOOL will develop a simulation platform for the manufacturing of composites through microwave MW heating. The simulation will include the electromagnetic field coupled with heat transfer mechanisms that take place during the production process. It will also include the process control loop which will enable the optimum design of the manufacturing process.One of the major outputs of the simulat ...
Voir le projet

 9

 TERMINÉ 

Multi-contact Collaborative Humanoids in Aircraft Manufacturing (COMANOID)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

COMANOID investigates the deployment of robotic solutions in well-identified Airbus airliner assembly operations that are laborious or tedious for human workers and for which access is impossible for wheeled or rail-ported robotic platforms. As a solution to these constraints a humanoid robot is proposed to achieve the described tasks in real-use cases provided by Airbus Group. At a first glance, ...
Voir le projet

 7

 TERMINÉ 

Future Sky Safety

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Voir le projet

 32

 TERMINÉ 

Validation of European high capacity rad-hard FPGA and software tools (VEGAS)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2018,

VEGAS proposes to address the key challenge of European non-dependence and competitivness regarding rad-hard FPGA for space applications. VEGAS will evaluate (following ESCC rules) and validate the first rad-hard FPGA in 65nm to directly compete with the US offering and reach TRL 7. The VEGAS project sets clear and measurable main objectives to reach a TRL 7 from TRL 5 (end of BRAVE project) as fo ...
Voir le projet

 11

 TERMINÉ 

AErial RObotic System for In-Depth Bridge Inspection by Contact (AEROBI)

Date du début: 1 déc. 2015, Date de fin: 30 nov. 2018,

The latest developments in low flying unmanned robots with arms and the associated fields of intelligent control, computer vision and sensors open the floor for robotic solutions, exploitable in the near term, in the field of inspection of difficult-toaccess areas of the civil infrastructure in general and bridges in particular. The latter infrastructure is ageing requiring inspection and assessme ...
Voir le projet

 11

 TERMINÉ 

Towards Demonstration of Photonic Payload For Telecom Satellites (OPTIMA)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2018,

...bre based equipment.However, great efforts are required to bring these benefits to the world of telecoms payloads as all the photonics equipment used on ground need to be adapted for space.In OPTIMA, Airbus Defence and Space (UK, FR), a world-leading satellite prime manufacturer, will define, assemble and a test photonic payload demonstrator based on building blocks developed, adapted for space an ...
Voir le projet

 9

 TERMINÉ 

PROJET PILOTE FRANCO ALLEMAND POUR UN ERASMUS DES APPRENTIS

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

Par manque de temps, le résumé n'a pas été traduit.
Voir le projet

 2

 TERMINÉ 

PROJET PILOTE FRANCO ALLEMAND POUR UN ERASMUS DES APPRENTIS

Date du début: 1 juin 2016, Date de fin: 31 mai 2018,

Par manque de temps le résumé n'a pas été traduit
Voir le projet

 2

 TERMINÉ 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Voir le projet

 41