Rechercher des projets européens

5 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Integrated Spectrometers for Spectral Tissue Sensing (InSPECT)

Date du début: 1 janv. 2015, Date de fin: 31 déc. 2017,

Image-guided needle procedures - such as taking biopsies in screening cancerous tumours - are becoming increasingly important in clinical practice. Today, physicians are severely hampered by the lack of precision in positioning the needle tip. Real-time tissue-characterization feedback at the needle tip during these procedures can significantly improve the outcome of diagnosis and treatment, and r ...
Voir le projet

 9

 TERMINÉ 

Photonic Libraries And Technology for Manufacturing (PLAT4M)

Date du début: 1 oct. 2012, Date de fin: 31 mars 2017,

Description "PLAT4M will make silicon photonics ready for transition to industry"Silicon is now a mature integration platform that has brought CMOS microelectronics to mass-market application. The PLAT4M vision is that silicon photonics will lead to a similar revolution in the photonics sector.Over the past years silicon photonics has see ...
Voir le projet

 18

 TERMINÉ 

Photonic Hybrid ASsembly Through FLEXible waveguides (PHASTFlex)

Date du début: 1 janv. 2014, Date de fin: 31 déc. 2016,

PHASTFLEX proposes the development of a fully automated, high precision, cost-effective assembly technology for next generation hybrid photonic packages. In hybrid packages, multiple Photonic ICs (PICs) are assembled, combining the best of different material platforms for a wide range of applications and performance. In PHASTFlex, InP PICs with active functions are combined with passive TriPleX PI ...
Voir le projet

 10

 TERMINÉ 
ASTRON aims at the development of high-capacity, energy-efficient and bit-rate flexible optical transceivers capable of supporting rates from 10Gb/s to beyond 1Tb/s. The ASTRON concept is based on developing multi-functional and agile devices so as to achieve Terabit capacities on a single photonic integrated chip. ASTRON's transceiver can realize different techniques of flexible super-channel ge ...
Voir le projet

 14

 TERMINÉ 
The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10 Mbps while the capacity required only for watching one channel of HDTV is 20 Mbps.Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 mill ...
Voir le projet

 13