Rechercher des projets européens

Plus de 40 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Towards Smart Zero CO2 Cities across Europe (SmartEnCity)

Date du début: 1 févr. 2016, Date de fin: 31 juil. 2021,

SmartEnCity’s main Objective is to develop a highly adaptable and replicable systemic approach towards urban transformation into sustainable, smart and resource-efficient urban environments in Europe through the integrated planning and implementation of measures aimed at improving energy efficiency in main consuming sectors in cities, while increasing their supply of renewable energy, and demonstr ...
Voir le projet

 35

 TERMINÉ 
The BIOSKOH project will pave the way for a Second Generation European Circular Bioeconomy by showcasing how a number Innovation Stepping Stones can realise a breakthrough in techno-economic viability of lignocellulosic biorefineries. It will do so through a two stage investment process and development path to realise the largest (110 kton) second generation (2G) biorefinery in Europe. It starts f ...
Voir le projet

 12

 TERMINÉ 

REnaissance of Places with Innovative Citizenship and TEchnolgy (REPLICATE)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2021,

The objective of REPLICATE is to demonstrate Smart City technologies in energy, transport and ICT in districts in San Sebastia, Florence and Bristol addressing urban complexity and generate replication plans in other districts and in follower cities of Essen,Nilufer and Lausanne.Main challenges for cities are to increase the overall energy efficiency, to exploit better local resources in terms of ...
Voir le projet

 37

 TERMINÉ 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Voir le projet

 31

 TERMINÉ 

AcceLerate Innovation in urban wastewater management for Climate changE (ALICE)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

The challenges facing society in urban wastewater management cannot be solved by any one sector alone. ALICE (AcceLerate Innovation in urban wastewater management for Climate changE) will accelerate innovation by bringing together and exchanging knowledge between the key players who can, together, address the future techno-economic, governance and societal challenges arising from climate change. I ...
Voir le projet

 13

 TERMINÉ 

Blood Biomarker-based Diagnostic Tools for Early Stage Alzheimer’s Disease (BBDiag)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

Alzheimer’s disease (AD) affects more than 7 million people in Europe and this figure is expected to double every 20 years. Despite intensive efforts, no disease-modifying treatments or preventive strategies are available. The lack of specific, sensitive and minimally invasive diagnostics to identify people with early-stage AD to be included in clinical drug intervention trials is among the main r ...
Voir le projet

 13

 TERMINÉ 

Sharing Cities (SHAR-LLM)

Date du début: 1 janv. 2016, Date de fin: 31 déc. 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Voir le projet

 36

 TERMINÉ 

Composable Models and Software for Robotics Systems (RobMoSys)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2020,

RobMoSys will coordinate the whole community’s best and consorted effort to build an open and sustainable, agile and multi-domain European robotics software ecosystem.RobMoSys envisions an integration approach built on-top-of, or rather around, the current code-centric robotic platforms, by means of the systematic application of model-driven methods and tools that explicitly focus on (system-of-) ...
Voir le projet

 9

 TERMINÉ 
In the GRIDABLE project we will introduce novel thermoplastic polymer composite materials to enhance performance of essential components of smart grid infrastructure. We have proven in laboratory scale that the polypropylene-silica nanocomposite brings considerable improvements especially in dielectric breakdown strength.When applied as insulator in high-voltage direct current (HVDC) cable and in ...
Voir le projet

 9

 TERMINÉ 
Based on a detailed mapping of urban challenges and relevant nature-based solutions (NBS), Nature4Cities aims at developing complementary and interactive modules to engage urban stakeholders in a collective-learning process about re-naturing cities, develop and circulate new business, financial and governance models for NBS projects, as well as provide tools for the impacts assessment, valorisatio ...
Voir le projet

 26

 TERMINÉ 
Background The little bustard (Tetrax tetrax), is a flagship species associated with semi-natural steppe habitats and traditional, low-input agricultural systems. With its overall distribution in rapid decline, the species is considered as globally threatened by BirdLife International (2004) and is also listed in the EU Birds Directive. The promontory of ...
Voir le projet

 7

 TERMINÉ 
Around 461 million ton/year of C&DW are generated in EU28. Recent studies on the characterization of C&DW samples at European level revealed a predominant fraction of concrete (52% average). Over the last years, novel technology has been developed aiming to guarantee high quality recycled concrete aggregates for use in new concrete, thereby closing the concrete loop. The most advanced concrete re ...
Voir le projet

 15

 TERMINÉ 
The ORCA Project proposal addresses topic GV-03-2016, of the Transport Work Programme. The work proposed will, in a single coordinated project, address all the aspects of the domain 2 “For pure and plug-in hybrids, power-train system integration and optimisation through the re-use of waste heat, advanced control, downsizing of ICEs, innovative transmissions and the integration of electronic compon ...
Voir le projet

 11

 TERMINÉ 
"Manufacturing companies are continuously facing the challenge of operating their manufacturing processes and systems in order to deliver the required production rates of high quality products of increasing complexity, with limited use and waste of resources. "Zero Defect Manufacturing" (ZDM) is a recent paradigm aiming at going beyond traditional six-sigma approaches in highly technology intensiv ...
Voir le projet

 13

 TERMINÉ 
Approximately one third of all food produced globally is wasted every year throughout the whole value chain-from farmers to consumers. To extract the significant amounts of valuable compounds contained in these wastes, AgriMax will combine affordable and flexible processing technologies (ultrasound assisted and solvent extraction, filtration, thermal and enzymatic treatments) for the valorization ...
Voir le projet

 30

 TERMINÉ 

HOLIstic optimisation of SHIP design and operation for life cycle (HOLISHIP)

Date du début: 1 sept. 2016, Date de fin: 31 août 2020,

Most maritime products are typically associated with large investments and are seldom built in large series. Where other modes of transport benefit from the economy of series production, this is not the case for maritime products which are typically designed to refined customer requirements increasingly determined by the need for high efficiency, flexibility and low environmental impact at a compe ...
Voir le projet

 39

 TERMINÉ 

ACTivating InnoVative IoT smart living environments for AGEing well (ACTIVAGE)

Date du début: 1 janv. 2017, Date de fin: 30 juin 2020,

ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Voir le projet

 50

 TERMINÉ 
The proposal addresses novel concepts for introducing Robotics and Autonomous Systems in the Construction Sector where, at this moment, the presence is minor. Specifically, the Hephaestus project focuses on highly risked and critical construction tasks such as prefab wall installation. In that sense, the Hephaestus has been conceived as a solution for accomplishing multiple tasks on vertical or in ...
Voir le projet

 9

 TERMINÉ 

Consortium for Hall Effect Orbital Propulsion System (CHEOPS)

Date du début: 1 nov. 2016, Date de fin: 30 avr. 2020,

CHEOPS proposes to develop three different Hall Effect Thruster electric propulsion systems: a dual mode EPS for GEO applications, a low power for LEO applications and a >20 kW high thrust EPS for exploration applications. Each of these will be developed according to market needs and drivers applying incremental technology changes to existing EPS products. The development approach will follow the ...
Voir le projet

 14

 TERMINÉ 
Renewable energy sources are key enablers to decrease greenhouse gas emissions and to cope with the anthropogenic global warming. The intermittent behaviour of them and their limited storage capabilities present new challenges to power system operators in maintaining power quality and reliability. However, the increased availability of advanced automation and communication technologies has also pr ...
Voir le projet

 19

 TERMINÉ 

LOW valued energy sources UPgrading for buildings and industry uses (LOWUP)

Date du début: 1 nov. 2016, Date de fin: 30 avr. 2020,

In the “secure, clean and efficient energy” initiative, it is stated that the most important milestones for such a transformation are the EU's energy and climate targets for 2030, which are: (i) at least 40% reduction in greenhouse gas emissions compared to 1990, (ii) at least 27% for the share of renewable energy consumed in the EU, and (iii) at least 27% improvement of energy efficiency and an e ...
Voir le projet

 13

 TERMINÉ 
MycoKey aims to generate innovative and integrated solutions that will support stakeholders in effective and sustainable mycotoxin management along food and feed chains. The project will contribute to reduce mycotoxin contamination mainly in Europe and China, where frequent and severe mycotoxin contaminations occur in crops, and where international trade of commodities and contaminated batches are ...
Voir le projet

 32

 TERMINÉ 

1D Nanofibre Electro-Optic Networks (1D-Neon)

Date du début: 1 avr. 2016, Date de fin: 31 mars 2020,

The vision of 1D-NEON proposal is to develop fibre-based smart materials along with an integrated technology platform for the manufacturing in Europe of new products with multi-sectorial applications in consumer electronics, energy, healthcare and fitness, smart buildings, sensors and e-skin for soft robotics.The overall objective of 1D-NEON is to build a modular platform for manufacturing fibre-b ...
Voir le projet

 14

 TERMINÉ 
Future manufacturing will be characterized by the complementarity between humans and automation, especially regarding the production of highly customizable products. This requires new methods and tools for the design and operation of optimized manufacturing workplaces in terms of ergonomics, safety, efficiency, complexity management and work satisfaction. MANUWORK aims to focus on the development ...
Voir le projet

 13

 TERMINÉ 
Manufacturing represents approximately 21 % of the EU’s GDP and 20 % of its employment, providing more than 30 million jobs in 230 000 enterprises, mostly SMEs. Moreover, each job in industry is considered to be linked to two more in related services. European manufacturing is also a dominant element in international trade, leading the world in areas such as automotive, machinery and agricultural ...
Voir le projet

 13

 TERMINÉ 
European aquaculture production provides direct employment to 80,000 people and a 3-billion € annual turnover. Parasites cause severe disease outbreaks and high economic losses in finfish aquaculture. The overarching goal of ParaFishControl is to increase the sustainability and competitiveness of European Aquaculture by improving understanding of fish-parasite interactions and by developing innova ...
Voir le projet

 31

 TERMINÉ 

Building and district thermal retrofit and management solutions (THERMOSS)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

The 20% primary energy consumption reduction targets set by the European Energy Efficiency Directive (EED), published in 2012, call for effective and wide-scale building heating and cooling systems upgrade strategies. These will be successful only if they base upon the right combination of technology innovation, industrial commitment and building owners awareness.In line with this statement, THERM ...
Voir le projet

 13

 TERMINÉ 
About 2/3 of the rice consumed by European citizens is produced in EU, and its productivity is affected by abiotic and biotic stresses. Of particular concern, global temperature has increased over the last century, especially during the last 50 years (0.13° C / decade). One consequence has been a clear tendency toward salinization, which affects rice as one of the most salt sensitive crop in the r ...
Voir le projet

 14

 TERMINÉ 

Analysis System for Gathered Raw Data (ASGARD)

Date du début: 1 sept. 2016, Date de fin: 29 févr. 2020,

ASGARD has a singular goal, contribute to Law Enforcement Agencies Technological Autonomy and effective use of technology. Technologies will be transferred to end users under an open source scheme focusing on Forensics, Intelligence and Foresight (Intelligence led prevention and anticipation). ASGARD will drive progress in the processing of seized data, availability of massive amounts of data and ...
Voir le projet

 34

 TERMINÉ 
The overall objective of FISSAC project is to develop and demonstrate a new paradigm built on an innovative industrial symbiosis model towards a zero waste approach in the resource intensive industries of the construction value chain, tackling harmonized technological and non technological requirements, leading to material closed-loop processes and moving to a circular economy.A methodology and a ...
Voir le projet

 26

 TERMINÉ 

Metrology Excellence Academic Network for Smart Grids (MEAN4SG)

Date du début: 1 mars 2016, Date de fin: 29 févr. 2020,

MEAN4SG network aims to educate 11 young researchers in the smart grids metrology field by constructing a training network gathering the whole innovation value chain. The main EU actors in the field of smart grids metrology have worked together, under the umbrella of the European Association of National Metrology Institutes (EURAMET), and relying on the support of the International Electrotechnica ...
Voir le projet

 8

 TERMINÉ 

Metal Recovery from Low Grade Ores and Wastes Plus (METGROW PLUS)

Date du début: 1 févr. 2016, Date de fin: 31 janv. 2020,

METGROW+ will address and solve bottlenecks in the European raw materials supply by developing innovative metallurgical technologies for unlocking the use of potential domestic raw materials. The METGROW+ consortium has received an EIP RM Commitment status. The consortium is supported by internationally respected research institutes and universities. Many of the partners (9) are members of EIT KIC ...
Voir le projet

 20

 TERMINÉ 
We will validate an affordable (28% reduction of total costs) and lightweight (35% weight reduction) solution for envelope insulation to bring existing curtain wall buildings to “nearly zero energy” standards while complying with the structural limits of the original building structure and national building codes. Two key commercial insulating products:• Highly insulating mono-component and enviro ...
Voir le projet

 14

 TERMINÉ 

Increased Runway and Airport Throughput (PJ02 EARTH)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Voir le projet

 35

 TERMINÉ 

Integrated Surface Management (PJ03a SUMO)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Voir le projet

 37

 TERMINÉ 

Total Airport Management (PJ04 TAM)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Voir le projet

 30

 TERMINÉ 
Background In Europe, there is a general lack of knowledge about the diverse functions of soils, and in particular about the best available measures for their improvement and conservation. In the specific case of vineyards, which have both economic and landscape value in Europe, there are several soil management problems that are often not adequately addr ...
Voir le projet

 8

 TERMINÉ 
Background Lightweight vehicles have a strategic role to play in EU environmental policy. Lightweight aluminium alloys have widely started to be adopted, the current frontier for light components. Massive and complex-shaped components are produced by cast aluminium, which competes with the heavier cast iron and preferable magnesium alloys, which though mu ...
Voir le projet

 2

 TERMINÉ 

Flight Object Interoperability VLD Demonstration (PJ27 IOPVLD)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

"One essential goal of the Single European Sky is to improve the Interoperability of the Air Traffic Management (ATM) network. The SESAR approach towards this goal is the introduction of a 4D-trajectory, which is common across all ATM stakeholders, called Reference Business Trajectory (RBT). The Flight Object concept is seen as a key enabler for implementing the RBT for Air Navigation Service Prov ...
Voir le projet

 14

 TERMINÉ 
The INSIGHT project aims at developing a Monitoring, Diagnostic and Lifetime Tool (MDLT) for Solid Oxide Fuel Cell (SOFC) stacks and the hardware necessary for its implementation into a real SOFC system. The effectiveness of the MDLT will be demonstrated through on-field tests on a real micro-Combined Heat and Power system (2.5 kW), thus moving these tools from Technology Readiness Level (TRL) 3 t ...
Voir le projet

 11