Rechercher des projets européens

13 projets européens trouvés

Recherche sur 125080 projets européens

 TERMINÉ 

Cross Border SESAR Trials for Enhanced Arrival Management (PJ25 XSTREAM)

Date du début: 1 janv. 2017, Date de fin: 31 déc. 2019,

There are periods during the day when variation in aircraft arrival times combine to exceed the capacity of the destination airport to handle them without incurring airborne delay. Such delay causes increased emissions and noise in the vicinity of the airport, as well as increasing the aircraft operator’s fuel costs. Greater congestion increases the air traffic control workload and can result in l ...
Voir le projet

 21

 TERMINÉ 

Increased Runway and Airport Throughput (PJ02 EARTH)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Voir le projet

 35

 TERMINÉ 

Integrated Surface Management (PJ03a SUMO)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Voir le projet

 37

 TERMINÉ 

Total Airport Management (PJ04 TAM)

Date du début: 1 déc. 2016, Date de fin: 31 déc. 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Voir le projet

 30

 TERMINÉ 

PJ24 VLD Network Collaborative Management (PJ24 NCM)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace Users (AUs), Airports, Air Navigation Service Providers (ANSPs) and Network Manager (NM). In Air Traffic Flow and Capacity Management (ATFCM), the performance targets and expectations at the network and local level could to be better achieved only through a c ...
Voir le projet

 20

 TERMINÉ 

Airport Safety Nets (PJ03b SAFE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety bareers to mitigate the risks of runway incursion, runway excursion and more generally the risk of incidents and accidents involving aircraft at the airport. They will be declined into four Solutions:Solution ‘Enhanced airport safety support tools for control ...
Voir le projet

 28

 TERMINÉ 

Master Plan Maintenance (PJ20 AMPLE)

Date du début: 1 nov. 2016, Date de fin: 31 déc. 2019,

Within the Single European Sky technological pillar, the European ATM Master Plan (ATM MP) is the roadmap to the horizon 2035+ to guide and connect ATM Research and Innovation and Deployment in building the future European ATM System. The European ATM Master Plan Edition 2015 approved by the SESAR Joint Undertaking (SJU) Administrative Board and the European Commission and recently published, set ...
Voir le projet

 29

 TERMINÉ 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Date du début: 1 nov. 2016, Date de fin: 30 nov. 2019,

"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control roo ...
Voir le projet

 31

 TERMINÉ 

Advanced DCB (PJ09 DCB)

Date du début: 1 nov. 2016, Date de fin: 31 oct. 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Voir le projet

 30

 TERMINÉ 

Co-modal Airport (ModAir)

Date du début: 1 sept. 2012, Date de fin: 30 avr. 2014,

The ModAir project aims at designing and setting up a mode-overlapping forum, where representatives from the air, rail and urban transport as well as any other relevant actor will contribute to the development and improvement of co-modality and intermodality for passengers in European airports.The interconnectivity at European airports is often still limited to urban transport, with in particular ...
Voir le projet

 6

 TERMINÉ 
Im Rahmen von "EncourAGE" sollen innovative Instrumente entwickelt werden, die HR-Experten von Unter-nehmen der europäischen Luftverkehrsbranche unterstützen, in die Personal- und Bildungssysteme ihrer Un-ternehmen demographieorientierte Maßnahmen zu implementieren, um so deren Innovations- und Leistungs-fähigkeit zu sichern. Ausgangssituation ist die erwartete demographische Entwicklung, wonach ...
Voir le projet

 10

 TERMINÉ 
Im Rahmen von "EncourAGE" sollen innovative Instrumente entwickelt werden, die HR-Experten von Unter-nehmen der europäischen Luftverkehrsbranche unterstützen, in die Personal- und Bildungssysteme ihrer Un-ternehmen demographieorientierte Maßnahmen zu implementieren, um so deren Innovations- und Leistungs-fähigkeit zu sichern. Ausgangssituation ist die erwartete demographische Entwicklung, wonach ...
Voir le projet

 10

 TERMINÉ 
Reaching new heights in the air transport industry : Human resources and training managers need to be able to appoint and train staff quickly and flexibly to keep step with the fast pace of the air transport sector. This project provides a network and forum of experts to promote exchanges of information and of experiences at the European level. This project started in 2002 and lasted 36 months.
Voir le projet

 15