Process industry plants have to be operated for a long time to make their operations viable. They include equipment such as furnaces, reactors, raw materials handling and storage systems which sometimes have a lifetime beyond 30 years. Keeping these facilities up to date from a technological and from regulatory point of view (for instance related to zero waste regulations and to the circular economy) is a major challenge. Even industrial plants which are less than 10 years old, are often not equipped for new or renewable (e.g. biomass) materials and alternative or renewable energy input streams. More generally, this increased variety of inputs along with the need for energy efficiency improvements poses a real challenge and requires technological breakthroughs in the process industry.
Scope:Proposals need to cover the following:
Demonstration of the technology in different process industries should be undertaken, covering both the technology (new ‘plug-ins’), as well as the process control (higher variability of the process requires new Monitoring & Control Systems).
Proposals submitted under this topic should include actions designed to facilitate cooperation with other projects; to enhance user involvement; and to ensure the accessibility and reusability of data produced in the course of the project.
Activities should start at TRL 5 and achieve TRL 7 at the end of the project.
The Commission considers that proposals requesting a contribution from the EU between EUR 8 and 12 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.
As an exception from General Annex D, the funding rate for eligible costs in grants awarded under this topic will be differentiated: 100% of the eligible costs for beneficiaries and linked third parties that are non-profit legal entities; and 50% of the eligible costs for beneficiaries and linked third parties that are for profit legal entities.
Expected Impact:Relevant indicators and metrics, with baseline values, should be clearly stated in the proposal.
Cross-cutting Priorities:Contractual Public-Private Partnerships (cPPPs)
SPIRE
International cooperation
Open Innovation
S'il vous plaît Se connecter pour voir cette section